Planning Application Status

PL2022122




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2022122
LS INDUSTRIAL REZONING
Commercial Rezoning with Preliminary Development Plan
Rezoning with no Preliminary Development Plan
Commercial Rezoning with Preliminary Development Plan
Approved
03/25/2022
LS INDUSTRIAL LLC
Locations
Contacts
LS INDUSTRIAL LLC, Address:4 E FRANKLIN  
GEORGE BUTLER ASSOCIATES INC, Address:9801 RENNER BLVD, Phone:(913) 492-0400  
Amy Grant, Address:6201 College Boulevard, Suite 500  
LS INDUSTRIAL LLC, Address:4 E FRANKLIN  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 05/20/2022 05/20/2022
Gene Williams, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
05/18/2022

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
05/18/2022

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
05/18/2022

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #06 Land Disturbance
Corrective Action Required
05/18/2022

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #07 Easements
Corrective Action Required
05/18/2022

All permanent off-site easements, in a form acceptable to the City, shall be executed and recorded with the Jackson County Recorder of Deeds prior to approval of any off-site plans. A certified copy shall be submitted to the City for verification.
DE C&O #09 FDP Reviews
Corrective Action Required
05/18/2022

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
05/18/2022

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE C&O #12 Cut & Fill
Corrective Action Required
05/18/2022

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
DE Commercial Detention Basin
Corrective Action Required
05/18/2022

The applicant shall submit and the City shall accept an “As-built / As-graded” detention basin plan prior to issuance of any occupancy permit for the proposed development.
DE Wetland or Jurisdictional Waterway
Corrective Action Required
05/18/2022

The applicant shall provide either proper documentation that no wetlands or jurisdictional waterways exist on the subject property or copies of all required documentation and / or permits associated with the wetland or jurisdictional waterway prior to approval of any final development or associated engineering plans.
Planning Review Corrections 04/26/2022 04/26/2022
Victoria Nelson
Miscellaneous Correction
Resolved
04/21/2022

Scale. Please check the scale and the measurements on the exhibit it they seem to be off. For example you say the B/L Setback is 25' when it was measured on our end it showed 20'.
Miscellaneous Correction
Resolved
04/26/2022

Site data table. Please show a basic site data table showing the total site area, total building sq. ft. and total number of parking spaces.
Miscellaneous Correction
Resolved
04/26/2022

The elevations do not currently meet the UDO standard. The requirement for 4 sided architechture , projections and horizontal and vertical breaks on all sides will need to be met. There are no materials called out so the UDO specs will need to be met as well. In order to not have to comply with these standards, a PDP would be required for modification from the UDO.
Miscellaneous Correction
Corrective Action Required
04/26/2022

The preliminary building elevations and color rendering provided do not at this stage show enough detail of the rear building elevation to confirm that the requirements for four-sided architecture (including horizontal and vertical projections/breaks/features) and the extension of a parapet wall along all building sides to provide RTU screening will be met. Please acknowledge that you are aware of these requirements and that they will be met as part of the future final development plan administrative approval process. Otherwise, any proposed deviation from said requirements can only be approved as part of a preliminary development plan public hearing process.
Miscellaneous Correction
Corrective Action Required
04/26/2022

We acknowledge the note that the applicant’s intent is to pursue approval of an alternate parking plan at the final development plan stage. Should an alternate parking plan not be pursued by the applicant, then parking for the development shall be provided in accordance with UDO Section 8.530, Table 8-1.
Traffic Review No Comments 04/26/2022 04/20/2022
Dawn Bell
Fire Review No Comments 04/26/2022 04/20/2022
Dawn Bell
Planning Review Corrections 04/08/2022 04/07/2022
Victoria Nelson
Miscellaneous Correction
Corrective Action Required
04/07/2022

Scale. Please check the scale and the measurements on the exhibit it they seem to be off. For example you say the B/L Setback is 25' when it was measured on our end it showed 20'.
Miscellaneous Correction
Corrective Action Required
04/07/2022

Site data table. Please show a basic site data table showing the total site area, total building sq. ft. and total number of parking spaces.
Miscellaneous Correction
Corrective Action Required
04/08/2022

The elevations do not currently meet the UDO standard. The requirement for 4 sided architechture , projections and horizontal and vertical breaks on all sides will need to be met. There are no materials called out so the UDO specs will need to be met as well. In order to not have to comply with these standards, a PDP would be required for modification from the UDO.
Traffic Review No Comments 04/08/2022 04/05/2022
Brad Cooley, P.E., RSPI
Engineering Review No Comments 04/08/2022 04/05/2022
Gene Williams, P.E.
Fire Review No Comments 04/08/2022 03/30/2022
Jim Eden
Corrective Action Required
03/28/2022

Fees
Paid Fees Amount Paid Owing Date Paid
Rezoning (without Preliminary Development Plan) fee $850.00 $850.00 Paid 03/30/2022
Legal Notice Publishing Charge $165.00 $165.00 Paid 03/30/2022
Legal Notice Publishing Charge $165.00 $165.00 Paid 03/30/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 05/26/2022 5:00 PM Council Chambers 05/26/2022 05:00 PM
Public Hearing Review
Continued
05/12/2022
City Council Public Hearing 06/07/2022 6:00 PM Council Chambers 06/07/2022 06:00 PM
Public Hearing Review
Approved
06/07/2022
City Council Ordinance 2nd Reading 06/14/2022 6:00 PM Council Chambers 06/14/2022 06:00 PM
Public Hearing Review
Approved
Documents & Images
Date Uploaded File Type Document Name
03/25/2022 Rezoning App-c
03/25/2022 LS INDUSTRIAL CLOSURE REPORT_0_2022.3.16-c
03/25/2022 LS INDUSTRIAL LEGAL_0_2022.3.16-c
03/25/2022 LS INDUSTRIAL REZONING PLANS_0_2022.3.16-c
03/30/2022 Receipt Receipt for transaction:2022-001735
04/08/2022 Buiding Elevations-c
04/08/2022 Letter Applicant Letter - Dev. Apps (DRCP)
04/19/2022 Rezoning Plan Revisions_submitted 4_19_2022
04/19/2022 LS INDUSTRIAL COMMENT LETTER_2022_4_19
04/19/2022 LS INDUSTRIAL CLOSURE REPORT_dated 4_19_2022
04/19/2022 LS INDUSTRIAL LEGAL_submitted 4_19_2022
04/21/2022 Letter Notice to Property Owners PC CC
04/21/2022 LS Industrial property owners list
04/22/2022 LS Industrial PH notice 1a north corner
04/22/2022 LS Industrial PH notice1
04/22/2022 LS Industrial PH notice 2
04/22/2022 LS Industrial PH notice 2a south corner
04/28/2022 Neighborhood Meeting Notice Letter_documents (83244752v1)-c
05/02/2022 Public Notice Document Legal notice
05/16/2022 Parking Comps _ LS Industrial-c
05/16/2022 Plans 2022_2_25 LS Industrial PDP (2)
05/17/2022 Elevations A3.1 05.16.22-c
05/17/2022 Elevations A3.2 05.16.22-c
05/17/2022 LS Industrial - Ex. Document review-c
05/20/2022 Public Notice Document LEGAL PL2022-122 REZ
05/20/2022 Drawing Location Map
05/20/2022 Drawing Elevations_Rendering
05/20/2022 Drawing Rezoning_Site Plan Exhibit
05/20/2022 Engineer Report/Study PL2022122 LS Industrial TIA
05/20/2022 Meeting Summary 5.4.2022 Neighborhood Meeting Minutes (83328539v1)-c
05/20/2022 Letter Staff Letter - final
05/31/2022 Public Notice Document Affidavit
10/25/2022 Ordinance/Resolution Ordinance #9433
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents