Summary
PL2020280
LOTS 1 AND 2 STREETS OF WEST PRYOR
Commercial Preliminary Development Plan
Commercial Preliminary Development Plan
Approved
09/24/2020
CITY OF LEES SUMMIT
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
STREETS OF WEST PRYOR LLC, Address:7200 W 132ND ST STE 150  
SM ENGINEERING, Address:919 W STEWART RD, Phone:(785) 341-9747  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 11/19/2020 11/19/2020
Jennifer Thompson
Engineering Review No Comments 11/23/2020 11/17/2020
Kent Monter
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
11/16/2020

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
11/16/2020

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
11/16/2020

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
Planning Review Corrections 11/06/2020 11/06/2020
Jennifer Thompson
Corrective Action Required
11/06/2020

The Lot 1 street tree requirement isn't met within the table, please revise. Lot 2 street shrub requirement isn't met within the table, please revise.
Corrective Action Required
11/06/2020

The elevations for Shake Shack has changed dramatically. Staff has concerns the roof line may be too flat. Additional articulation is needed. There is alot of metal proposed, paticurally the west elevation. I don't believe we received a material sample for the metal, please provide.
Engineering Review Approved with Conditions 11/06/2020 11/06/2020
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
11/06/2020

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
11/06/2020

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any infrastructure permits or the start of construction (excluding land disturbance permit).
DE C&O #09 FDP Reviews
Corrective Action Required
11/06/2020

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
Fire Review Approved with Conditions 11/06/2020 11/04/2020
Jim Eden
Code Statement
Corrective Action Required
11/06/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
10/30/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: On Lot 2, bring the FDC to the front (NW) corner of the building and move the fire hydrant to the end of drive-up lane.
Misc.
Corrective Action Required
11/06/2020

Do not obstruct access to fire hydrants and FDC's with landscaping vegetation. Action required: Make adjustments to the landscaping plan.
Traffic Review Approved with Conditions 11/06/2020 11/02/2020
Michael Park
Corrective Action Required
11/06/2020

Lowenstien will require roadway improvements to urban standards west of Blacktwig to the western most property line of the development in compliance with the City's Unimproved Road Policy (similar to required improvements to Blacktwig by earlier development phase). This condition will be reflected on the staff recommendations for approval on the staff prepared Traffic Impact Analysis.
Planning Review Corrections 10/09/2020 10/12/2020
Jennifer Thompson
Corrective Action Required
10/12/2020

Has any consideration been given to flipping Lot 1 and Lot 2? Meaning have the drive-thru on Lot 1 and sit down restaurant on Lot 2. Staff has initial concerns about potential issues with the drive-thru stacking and on-site circulation if the drive-thru is wildly successful.
Corrective Action Required
10/12/2020

The required parking counts are inaccurate within the Site Data table (sheet C3.0). 78 spaces are required for Lot 1 and 45 spaces are required for Lot 2. However parking needs are met.
Corrective Action Required
10/12/2020

Standard detail sheets were not received (i.e. pavement, curbing, accessible signage, trash enclosure, etc.)
Corrective Action Required
10/12/2020

Provide the manufacture's specifications for all exterior wall lighting.
Corrective Action Required
10/12/2020

The landscape calculations are switched between Lot 1 and 2 in terms of street lengths, sq. footages. Also it seems that the required numbers aren't met/reflected within the table, but seems to be met on the plan? The parking lot screening calculations are missing as well. Please revise so we can re-evaluate.
Corrective Action Required
10/12/2020

Indicate the location of any proposed roof top units. They will be required to be screened via parapet.
Corrective Action Required
10/12/2020

Metal is a conditional material and will require approval through the governing body.
Corrective Action Required
10/12/2020

Staff has concern on the amount of EIFS proposed for Shake Shack. Typically our rule of thumb is no more than 30% per elevation.
Traffic Review Corrections 10/09/2020 10/07/2020
Michael Park
Corrective Action Required
10/07/2020

A Traffic Study Update/Memo was submitted for the subject PDP Application and companion PDP Application, both associated with Streets of West Pryor. The study should be included with both PDP Applications. The following comments pertain to the traffic study and may or may not directly relate to the subject PDP. However, some of these comments address clarity for which each application may be independently evaluated.
Corrective Action Required
10/07/2020

Traffic Study-Does the additional traffic generated and (re)distributed traffic (due to internal access and building layout changes) on Blacktwig at Chipman warrant a traffic signal? Address in update memo.
Corrective Action Required
10/07/2020

Traffic Study-Does the additional traffic generated and (re)distributed traffic (due to internal access and building layout changes) on Blacktwig at Lowenstein warrant an all-way stop condition? Address in update memo.
Corrective Action Required
10/07/2020

Traffic Study-An illustration depicting the location of new trips (in comparison to the previously approved plan) would be helpful in addressing resident concerns about impacts to Lowenstien, Blacktwig and intersection at Chipman.
Corrective Action Required
10/07/2020

Traffic Study-An assessment of impacted trip distribution needs to be included. It appears there’s significant change in traffic circulation (e.g. connection to the private roadways from the commercial development to Blacktwig via the west direct connection and apartment orientation). An exhibit that compares 2018 Generated Trip Distribution (Volume, Not Percentage) to Proposed Generated Trip Distribution (Volume, Not Percentage).
Corrective Action Required
10/07/2020

Traffic Study-The proposed sport courts/outdoor athletic club needs to be accounted for in the trip generation.
Engineering Review No Comments 10/09/2020 10/06/2020
Sue Pyles, P.E.
Fire Review Corrections 10/09/2020 09/29/2020
Jim Eden
Code Statement
Informational
09/29/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
09/29/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. The FDC's for each building are not shown. The distance from the private hydrant exceeds 100-feet from the building and any building mounted FDC.
Misc.
Corrective Action Required
09/29/2020

Will each lot be under separate ownership? Generally, private fire protection (hydrants) are not shared between lots.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Commercial Preliminary Development Plan fee $1,800.00 $1,800.00 Paid 10/12/2020
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 10/12/2020
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 10/12/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 12/10/2020 05:00 PM Council Chambers 12/10/2020 05:00 PM
Public Hearing Review
Pending
12/10/2020
City Council Public Hearing 01/05/2021 06:00 PM Council Chambers 01/05/2021 06:15 PM
Public Hearing Review
Pending
01/12/2021
Documents & Images
Date Uploaded File Type Document Name
09/24/2020 Lot 1 & 2 PDP Application - 09.14.2020
09/24/2020 Lot 1 & 2 Ownership Affidavit - 09.14.2020
09/25/2020 Shake Shack - Material Board - Lee's Summit, MO - September 2020
09/25/2020 6828 - Lot 1-2 Site Lighting
09/25/2020 SOWP Lot 1 & 2 PDP
09/25/2020 Shake Shack Elevations
09/25/2020 Red Door Grill Elevations
10/12/2020 Receipt Receipt for transaction:2020-006872
10/12/2020 Letter Applicant Letter - Dev. Apps (DRCP)
10/30/2020 Response Letter10.30.20 Lees Summit Streets of West Pryor Lot 1 and 2 Response Letter 102720
10/30/2020 FDC plan10.30.20 RDG Lee Summit Site
10/30/2020 10.30.20 Lot 1-2 Site Lighting
10/30/2020 Shake Shack Elevations10.30.20 PDP Ext Design Submission 2_to LL
10/30/2020 Traffic Memo10.30.20 Final-West Pryor Village TIS Memo
10/30/2020 Lighting for Shake Shack10.30.20 Shake Shack XW1 - Exterior Wall Mounted Sconce
10/30/2020 Shake Shack Lighting10.30.20 Shack Shake Exterior Linear Lights-WBR_LED-B3_SPEC
10/30/2020 Site Plan10.30.20 SOWP Lot 1 & 2 PDP
10/30/2020 Red Door Elevations10.30.20 RDG - Lees Summit PDP rev Submittal
10/30/2020 Modification Requests10.30.20 Lees Summit Streets of West Pryor Mod Request 102720 Binder
11/06/2020 Letter Applicant Letter - Dev. Apps (DRCP)
11/16/2020 Lees Summit Streets of West Pryor Lot 1 and 2 Response Letter 111620
11/16/2020 PDP plansSOWP Lot 1 & 2 PDP 11-12-20
11/16/2020 Shake Shack Elevations2020-11-16_Lee's Summit_PDP Ext Design Submission 3_reduced
12/02/2020 SWP Lot 1 & Lot 2 - Affidavit of Notice to Property Owners - 11.20.2020
12/02/2020 list of property owners -lot 1 & 2
12/02/2020 map - lot 1 and 2
12/02/2020 Completed Notice to Property Owners_Affidavit
12/03/2020 Lees Summit Streets of West Pryor Mod Request Lots 1 and 2 120320
12/03/2020 2020-12-03_Lee's Summit_PDP Ext Design Submission 4_reduced
12/03/2020 Lees Summit Streets of West Pryor Mod Request Lots 1 and 2 Revised 120320
12/03/2020 PL2020280 SWP Lots 1 & 2 TIA
12/04/2020 Shake Shack Material Board 120420 2020-12-04 001
12/09/2020 Legal Notice and Affidavit for PC
12/09/2020 Letter LEGAL PL2020-280 PDP PC
12/14/2020 PL2020-080 PDP SWP Lot 1 and 2 PC
12/16/2020 Legal notice CC
12/31/2020 SOWP Lot 1 & 2 PDP 12-31-20
01/13/2021 DOC011321-003
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home