Planning Application Status

PL2020078




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2020078
LOT 3, STREETS OF WEST PRYOR
Commercial Final Development Plan
Commercial Final Development Plan
Approved
03/23/2020
CITY OF LEES SUMMIT
Locations
Contacts
CITY OF LEES SUMMIT, Address:220 SE GREEN ST  
STREETS OF WEST PRYOR LLC, Address:7200 W 132ND ST STE 150  
SM ENGINEERING, Address:919 W STEWART RD, Phone:(785) 341-9747  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Corrections 09/04/2020 09/04/2020
Jennifer Thompson
Corrective Action Required
09/04/2020

Additional clarification is needed on total square footage. Total square footage should be to the exterior of the building. When we calculate this we don't consider the IBC method. We are not sure if the IBC method is removing hall ways/storage areas or just exterior walls? It's confusing to have to separate square footage calculations listed on the plans. In addition, the previously approved plans had listed a different total square footage of 5,700 sq.ft., now it's 6,662 or 6,911 depending on which sheet you reference. Also sheet two has the square footage as 16,622 in error. It may be helpful to set up a quick phone call to discuss in more detail.
Planning Review Corrections 08/03/2020 08/21/2020
Jennifer Thompson
Corrective Action Required
08/21/2020

All RTU's (roof top mounted units), shall be screened from view via parapet.
Corrective Action Required
08/21/2020

It was noted on the first sheet the total square footage of the building is 6,911 sq. ft. However the approved final development plan and other sheets in the recent submittal reflect a total building square footage of 5,700. Please clarify. This could require additional parking needs and other considerations.
Engineering Review No Comments 08/03/2020 08/03/2020
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
07/28/2020

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
07/28/2020

Contact Joe Starlin, Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
07/28/2020

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $54,208.78
DE Future Repair Work
Corrective Action Required
07/28/2020

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Building Codes Review No Comments 08/03/2020 08/03/2020
Joe Frogge
Fire Review Approved with Conditions 05/22/2020 05/22/2020
Jim Eden
Code Statement
Informational
05/15/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Informational
05/15/2020

If the building is not going to be provided with an automatic sprinkler system, the square footage, use and occupant loads of the building will require the building to be divided into fire areas in accordance with the 2018 International Building Code. Verified at building permit review.
Traffic Review No Comments 05/22/2020 05/19/2020
Michael Park
Building Codes Review No Comments 05/22/2020 05/18/2020
Joe Frogge
Engineering Review Approved with Conditions 05/22/2020 05/18/2020
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
05/15/2020

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
05/15/2020

Contact Joe Starlin, Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
05/15/2020

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $54,208.78
DE Future Repair Work
Corrective Action Required
05/15/2020

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Planning Review No Comments 05/22/2020 05/15/2020
Jennifer Thompson
Planning Review Corrections 05/12/2020 05/12/2020
Jennifer Thompson
Corrective Action Required
05/12/2020

The car stacking queuing still has not been met. Please refer to the Unified Development Ordinance, Article 8 for requirements. The intent of the ordinance is NOT to have car stacking that meets the minimum requirements blocking drive aisle spaces as shown. It seems the order box could be relocated to allow for four car spacing behind the order box point and four spaces at the pick-up window.
Corrective Action Required
05/12/2020

All landscaping requirements shall meet the Unified Development Ordinance standards.
Engineering Review Approved with Conditions 05/12/2020 05/12/2020
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
05/12/2020

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
05/12/2020

Contact Joe Starlin, Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
05/12/2020

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $54,208.78
DE Future Repair Work
Corrective Action Required
05/12/2020

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review Approved with Conditions 05/12/2020 05/11/2020
Jim Eden
Code Statement
Informational
05/05/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Informational
05/11/2020

If the building is not going to be provided with an automatic sprinkler system, the square footage, use and occupant loads of the building will require the building to be divided into fire areas in accordance with the 2018 International Building Code. Verified at building permit review.
Traffic Review No Comments 05/12/2020 05/11/2020
Michael Park
Building Codes Review No Comments 05/12/2020 05/08/2020
Joe Frogge
Planning Review Corrections 05/01/2020 05/01/2020
Jennifer Thompson
Corrective Action Required
05/01/2020

It doesn't appear the ownership affidavit portion of the application was properly notarized. Revise and resubmit.
Corrective Action Required
05/01/2020

Include within the landscape calculations the required parking lot screening requirements. Reference Article 8 of the UDO for specific requirements. I didn't see this revision.
Corrective Action Required
05/01/2020

Show the stacking/cueing of the cars for the function of the drive-thru. This is needed from the speaker box and pick-up window. Four spaces are required at speaker box and pick-up window. Please revise.
Traffic Review No Comments 05/01/2020 04/30/2020
Michael Park
Engineering Review Corrections 05/01/2020 04/29/2020
Sue Pyles, P.E.
Corrective Action Required
04/29/2020

Sheet C3.0: • Please revise Note 60 to show the connection to the sanitary main as a cut-in wye. • Please label the hose bib water line size. • There is an unlabeled line that appears to be a sanitary sewer service line. Please label. The reference line connects just to the left of the Note 60 symbol, heads north then turns east and extends to the building.
Corrective Action Required
04/29/2020

Sheet C4.0: Please include notes to show the connections to the existing storm sewer are to be core drilled.
Corrective Action Required
04/29/2020

Sheet C4.1: At the point where the sidewalk extending from Lot 3 connects to the public sidewalk along Lowenstein Drive, a turning space within the public sidewalk is required. A turning space requires 1.5% slope maximum in any direction. If the public sidewalk at that location does not meet this requirement, it will need to be removed and replaced to bring it into conformance. Please indicate on the plans either (1) the existing sidewalk meets this requirement or (2) show the public sidewalk being removed and replaced. In either option, label the slope and dimension of all sides of the turning space.
Corrective Action Required
04/29/2020

Estimate: • There is an item for 1.5” Water Service Line. Where is this line in the plan set? • Include items for connection to the sanitary sewer and storm sewer. • Please ensure that the quantity and unit cost extend to equal the total cost for each item. • The estimate must be signed/sealed.
Fire Review Approved with Conditions 05/01/2020 04/28/2020
Jim Eden
Code Statement
Informational
04/24/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Misc.
Corrective Action Required
04/28/2020

If the building is not going to be provided with an automatic sprinkler system, the square footage, use and occupant loads of the building will require the building to be divided into fire areas in accordance with the 2018 International Building Code. Verified at building permit review.
Building Codes Review No Comments 05/01/2020 04/24/2020
Joe Frogge
Building Codes Review No Comments 04/06/2020 04/08/2020
Joe Frogge
Engineering Review Corrections 04/07/2020 04/07/2020
Sue Pyles, P.E.
Corrective Action Required
04/07/2020

Please submit the following: • Engineer's Estimate of Probable Construction Costs. • Stormwater report or memo stating this project aligns with a previously submitted overall report.
Corrective Action Required
04/07/2020

Sheet C1.0: • Revise KCPL to Evergy on this sheet and throughout the plan set. • Revise the project location hatching on the Location Map to more correctly show the location much closer to Chipman Road.
Corrective Action Required
04/07/2020

Sheet C2.0: • The City does not have a Type B Curb & Gutter. Please revise the detail callout accordingly. • I was unable to locate Note 510. Please clarify. • The trash enclosure requires a 30’ concrete pavement section. Please revise.
Corrective Action Required
04/07/2020

Sheet C3.0: Note 60 indicates the sanitary sewer service connection, but no specifics. Is the connection to a sanitary line or extension of a service line already in place? Grease interceptors are shown but no mention of them is made. Please expand sanitary information.
Corrective Action Required
04/07/2020

Sheet C4.1: There is sidewalk proposed between ADA Ramp 4 and the existing sidewalk along Lowenstein Drive. At the point where that connection is made, there will be a turning space required. Please provide a detail that either shows the turning space slope requirements are being met, or details a proposed design to meet those requirements.
Corrective Action Required
04/07/2020

Sheet C10.0: Only trees of an ornamental variety are allowed within public easements. Provide confirmation that this requirement is being met or revise accordingly.
Planning Review Corrections 04/06/2020 04/06/2020
Jennifer Thompson
Corrective Action Required
04/06/2020

It doesn't appear the ownership affidavit portion of the application was properly notarized. Revise and resubmit.
Corrective Action Required
04/06/2020

Please provide color elevations.
Corrective Action Required
04/06/2020

The east, south, west and south elevations need additional architectural offsets and vertical articulation. They are seemingly flat elevations and needs additional detail, pop outs, variation in heights between the multiple tenants. Additional comments may follow, once the resubmittal is received.
Corrective Action Required
04/06/2020

The trash enclosure detail sheet that was submitted was unable to be opened. Can you resend?
Corrective Action Required
04/06/2020

Please confirm the total height of the light pole base. What is the total height of the light poles, including the base at grade.
Corrective Action Required
04/06/2020

Any trees located within easements shall be an ornamental variety.
Corrective Action Required
04/06/2020

Include within the landscape calculations the required parking lot screening requirements. Reference Article 8 of the UDO for specific requirements.
Corrective Action Required
04/06/2020

All signs require a separate sign permit review and submittal prior to installation.
Corrective Action Required
04/06/2020

Show the stacking/cueing of the cars for the function of the drive-thru. This is needed from the speaker box and pick-up window.
Corrective Action Required
04/06/2020

The trash enclosure pad requires to be 30' in length.
Corrective Action Required
04/06/2020

Sheet 1 references KCPL rather than Evergy.
Corrective Action Required
04/06/2020

Just a reminder the proposed square footage is a 200 square feet increase from the approved preliminary development plan. Parking calculations have been noted accordingly for over all site development and build out.
Corrective Action Required
04/06/2020

As staff becomes more familiar with electronic review, additional comments could be forth coming.
Traffic Review No Comments 04/06/2020 03/31/2020
Michael Park
Fire Review Corrections 04/06/2020 03/26/2020
Jim Eden
FDC
Corrective Action Required
03/26/2020

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: Show the location of the fire department connection (FDC).
Code Statement
Informational
03/26/2020

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $600.00 $600.00 Paid 04/01/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
03/23/2020 Activity Document FDP Application - Lot #3 - SWP - 20200323
03/23/2020 Lot 3 Floor Plan
03/23/2020 Lot 3 trash enclosure
03/23/2020 Lot 3 Elevations
03/23/2020 Lot 3 Lighting Plan
03/23/2020 Type A - lighting cut sheet
03/23/2020 Type AA, BB, CC - Lighting cut sheet
03/23/2020 Type C - Lighting cut sheet
03/23/2020 Type B - Lighting cut sheet
03/23/2020 Lot 3 FDP 2-24-20
04/01/2020 Receipt Receipt for transaction:2020-001368
04/08/2020 Letter Applicant Letter - FDP (DFDP)
04/24/2020 4.24.20 SWP Lot 3 A-100
04/24/2020 4.24.20 SWP Lot 3-M.101
04/24/2020 4.24.20 SWP Lot 3 Cost Estimate
04/24/2020 4.24.20 SWP Lot 3 FDP
04/24/2020 4.24.20 SWP Lot 3 Stormwater Memo
04/24/2020 4.24.20 SWP Lot 3 Applicant Responses
04/24/2020 4.24.20 SWP Lot 3 Rendered Elevations
05/01/2020 Letter Applicant Letter - FDP (DFDP)
05/05/2020 5.4.20 SWP Lot 3 Cost Estimate
05/05/2020 5.4.20 SWP Lot 3 Applicant Responses
05/05/2020 SWP Lot 3 - FDP Application - 05.04.2020
05/05/2020 5.4.20 SWP Lot 3 FDP
05/12/2020 Activity Document Fees PL2020078 Lot 3 Streets of West Pryor FDP
05/13/2020 Letter Applicant Letter - FDP (DFDP)
05/14/2020 Comment Responses Applicant Letter - FDP (DFDP)
05/14/2020 Streets of W Pryor Lot 3 C2.0 Site Plan PERMIT 5-15-20
06/02/2020 Letter Applicant Letter - FDP (DFDP)
07/16/2020 Approved Plans Approved 7_16_20 SWP Lot 3 FDP
07/28/2020 7.28.20 SWP Lot 3 ASI writeups 2-7
07/28/2020 7.28.20 SWP Lot 3 072120 thru ASI #7
08/24/2020 Letter Applicant Letter - FDP (DFDP)
08/31/2020 8.31.20 Review Response
08/31/2020 8.31.20 Review Response Updated Sheets
09/06/2020 Letter Applicant Letter - FDP (DFDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home