Review Type |
Outcome |
Est. Completion Date |
Completed |
Traffic Review
|
No Comments
|
03/28/2023
|
03/28/2023
|
|
Brad Cooley, P.E., RSPI
|
|
|
Planning Review
|
Approved with Conditions
|
03/28/2023
|
03/27/2023
|
|
Shannon McGuire
|
|
Corrective Action Required
Please update the City signature block to reflect the current Development Services Director, Joshua Johnson, AICP.
|
|
|
Engineering Review
|
No Comments
|
03/28/2023
|
03/27/2023
|
|
Gene Williams, P.E.
|
|
|
Planning Review
|
Approved with Conditions
|
09/07/2021
|
09/07/2021
|
|
Shannon McGuire
|
|
Corrective Action Required
Prior to submitting for signatures, the ROW dedication must be recorded and the document number shall be included on this plat.
|
|
|
Traffic Review
|
Approved with Conditions
|
09/07/2021
|
09/07/2021
|
|
Brad Cooley, P.E., RSPI
|
|
The A/E note refers to 7', but parts of the A/E are also 9'.
|
|
Corrective Action Required
The RW Dedication by separate document may need a 2' chamfer on the southwest corner of the alley/alley intersection. The design showed a small radius on the curb at that corner and truck movement had a slight overlap on the corner. However, design/field modifications and relocated utilities may have rendered the chamfer unnecessary.
|
|
Corrective Action Required
Are there any utilities in the vacated alley ROW that need a U/E?
|
|
|
Engineering Review
|
No Comments
|
09/07/2021
|
09/07/2021
|
|
Gene Williams, P.E.
|
|
|
Traffic Review
|
Approved with Conditions
|
05/01/2020
|
05/04/2020
|
|
Michael Park
|
|
The A/E note refers to 7', but parts of the A/E are also 9'.
|
|
Corrective Action Required
The RW Dedication by separate document may need a 2' chamfer on the southwest corner of the alley/alley intersection. The design showed a small radius on the curb at that corner and truck movement had a slight overlap on the corner. However, design/field modifications and relocated utilities may have rendered the chamfer unnecessary.
|
|
Corrective Action Required
Are there any utilities in the vacated alley ROW that need a U/E?
|
|
|
Engineering Review
|
No Comments
|
05/01/2020
|
05/01/2020
|
|
Gene Williams, P.E.
|
|
|
Planning Review
|
Approved with Conditions
|
05/01/2020
|
04/30/2020
|
|
Shannon McGuire
|
|
Corrective Action Required
Pryor to submitting for signatures, the ROW dedication must be recorded and the document number shall be included on this plat.
|
|
|
Fire Review
|
No Comments
|
05/01/2020
|
04/28/2020
|
|
Jim Eden
|
|
|
GIS Review
|
No Comments
|
05/01/2020
|
04/27/2020
|
|
Kathy Kraemer
|
|
|
Building Codes Review
|
No Comments
|
05/01/2020
|
04/24/2020
|
|
Joe Frogge
|
|
|
Planning Review
|
Corrections
|
03/05/2020
|
03/02/2020
|
|
Shannon McGuire
|
|
Corrective Action Required
Please move the Jackson County signature block to be in the same area as the City signature blocks.
|
|
Corrective Action Required
Prior to this plat being approved and recorded the alley must be dedicated. Please show the lot lines as though the ally has been dedicated and label the alley as “24’ Alley Dedicated by Document # XXXX”.
|
|
Corrective Action Required
It appears that a 7’ A/E has been established along the north property lines of Lot 1A and 1B but “A/E” is not defined in the plat notes. Please add a note that defines what is the purpose of the A/E.
|
|
|
GIS Review
|
No Comments
|
03/05/2020
|
02/27/2020
|
|
Kathy Kraemer
|
|
|
Engineering Review
|
Corrections
|
03/05/2020
|
02/27/2020
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
A public sidewalk easement is required along the north side of Lot 1A and Lot 1B. It appears "A/E" is shown, but not defined anywhere on the plat language.
|
|
Corrective Action Required
Private sanitary sewer easement(s) and private stormwater easements are required between Lots 1B and 1A. The location of these easements should follow the routes shown on the approved Final Development Plan. These easements can be dedicated on the plat.
|
|
Corrective Action Required
Formal approval of this plat is contingent upon the issuance of a Certificate of Final Acceptance for the sanitary sewer and alley improvements, or security as specified in the Unified Development Ordinance (UDO).
|
|
|
GIS Review
|
Corrections
|
02/12/2020
|
02/04/2020
|
|
Kathy Kraemer
|
|
Corrective Action Required
Plat needs outside dimensions, not just lot dimensions.
|
|
Corrective Action Required
Missing distances between coordinates 7 and 8, and between coordinates 3 and 4
|
|
|
Planning Review
|
Corrections
|
02/12/2020
|
02/04/2020
|
|
Shannon McGuire
|
|
Corrective Action Required
Please add the total acreage of the proposed subdivision.
|
|
Corrective Action Required
Please label each lot with its respective address:
• Lot 2A = 222 SW Main St
• Lot 1A = 207 SW Market St
• Lot 1B = 209 SW Market St
|
|
Corrective Action Required
Please show a public access easement over the sidewalk that runs adjacent to the north property line of Lot 1A & 1b.
|
|
Corrective Action Required
The City approval statement should read “This is to certify that the minor plat of “Dahmer Development, Lots 1A, 1B & 2A” was dully submitted and duly approved by the City of Lee’s Summit, pursuant to Chapter 33, The Unified Development Ordinance, of the City of Lee’s Summit Code of Ordinances.”
|
|
Corrective Action Required
The public right-of-way covering the new ally needs to be shown on this minor plat. That being said, a minor plat may not include new ROW to be dedicated to the city. This will need to be accomplished by separate document.
|
|
|
Engineering Review
|
Corrections
|
02/12/2020
|
02/04/2020
|
|
Gene Williams, P.E.
|
|
Corrective Action Required
A public sidewalk easement is required along the north side of Lot 1A and Lot 1B.
|
|
Corrective Action Required
Private sanitary sewer easement(s) and private stormwater easements are required between Lots 1B and 1A. The location of these easements should follow the routes shown on the approved Final Development Plan. These easements can be dedicated on the plat.
|
|
Corrective Action Required
A Drainage Note appeared to be missing. This is the standard note, stating that "...individual lot owners shall not...without written permission of the City Engineer." Since a Master Drainage Plan is not associated with this development, please do not reference a Master Drainage Plan.
|
|
Corrective Action Required
Formal approval of this plat is contingent upon the issuance of a Certificate of Final Acceptance for the sanitary sewer and alley improvements, or security as specified in the Unified Development Ordinance (UDO).
|
|
|