Planning Application Status

PL2019191




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2019191
MCKEEVER'S MARKET & EATERY #950
Commercial Final Development Plan
Commercial Final Development Plan
Approved
06/03/2019
Locations
Contacts
SUPER MARKET DEVELOPERS, Address:5000 KANSAS AVE, Phone:(913) 288-1879  
R I C , Address:1815 NCGEE ST, #200, Phone:(913) 832-5683  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 11/22/2019
Dawn Bell
Planning Review Corrections 11/01/2019 11/01/2019
Jennifer Thompson
Corrective Action Required
11/01/2019

The proposed 6-inch sod surrounding the brick pavers does not meet the UDO requirement for a landscaped island. Please revise and contact us for additional discussion.
Engineering Review Approved with Conditions 11/01/2019 11/01/2019
Sue Pyles, P.E.
DE C&O #11 Pavement Thickness
Corrective Action Required
10/25/2019

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
10/25/2019

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
10/25/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $28,833.95
DE Future Repair Work
Corrective Action Required
11/01/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review Approved with Conditions 11/01/2019 10/29/2019
Jim Eden
Code Statement
Informational
10/25/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Lanes - Marking
Resolved
10/29/2019

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. The fire lanes around the building look good. Extend the same signage to the area around the FDC. Verified at building permit review.
Building Codes Review No Comments 11/01/2019 10/28/2019
Joe Frogge
Traffic Review No Comments 11/01/2019 10/28/2019
Michael Park
Engineering Review Approved with Conditions 10/09/2019 10/10/2019
Sue Pyles, P.E.
Corrective Action Required
10/10/2019

Sheet C08: • Please review the need for DIP on the fire line between the backflow vault and the building. It would appear that C900 PVC would be a better choice since the stub is of that material. • Please shift the backflow vault east to be out of the public sanitary sewer easement. • Indicate the material of the “50 LF 6” New Water Line” near the SE building corner. • Staff is ok with the issuance of a foundation only permit, however the items in this comment would need to be resolved prior to the issuance of a building permit for anything going vertical.
DE C&O #11 Pavement Thickness
Corrective Action Required
10/10/2019

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
DE Contact Field Eng. Inspector
Corrective Action Required
10/10/2019

Contact the Field Engineering Inspector at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Engineers Estimate
Corrective Action Required
10/10/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $xxx.xx
DE Future Repair Work
Corrective Action Required
10/10/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Planning Review Approved with Conditions 10/09/2019 10/10/2019
Jennifer Thompson
Corrective Action Required
10/10/2019

The UDO requires some sort of landscaping within the parking lot islands (sod, trees, shrubs, mulch, ground cover, etc.). Perhaps the islands closest to the building can be sodded with a brick path in the middle for pedestrians. Staff cannot waive this requirement. Approval through a preliminary development plan and City Council approval would be needed to waive this requirement.
Corrective Action Required
10/10/2019

Please reconcile with the master developer the deficiencies with the open yard tree and shrub requirements. A total of 100 shrubs and 50 trees are required for the open yard requirement. The landscape Sheet L01 needs to be revised and resubmitted.
Corrective Action Required
10/10/2019

The elevations should be relabeled, the east and west labels are reversed. Please resubmit those sheets affected.
Corrective Action Required
10/10/2019

Submit a site line drawing showing the proposed RTU's. It is noted on the south elevation they could be seen above the roofline.
Corrective Action Required
10/10/2019

Staff is ok with the issuance of a foundation only permit, however the items in this comment letter would need to be resolved prior to the issuance of a building permit for anything going vertical.
Traffic Review No Comments 10/09/2019 10/03/2019
Michael Park
Building Codes Review No Comments 10/09/2019 10/03/2019
Joe Frogge
Fire Review Approved with Conditions 10/09/2019 10/03/2019
Jim Eden
Code Statement
Informational
10/02/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Lanes - Marking
Corrective Action Required
10/03/2019

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. The fire lanes around the building look good. Extend the same signage to the area around the FDC. Verified at building permit review.
Planning Review Corrections 08/06/2019 08/08/2019
Jennifer Thompson
Corrective Action Required
08/08/2019

The UDO requires some sort of landscaping within the parking lot islands (sod, trees, shrubs, mulch, ground cover, etc.), please revise the proposed islands that have pavers shown within them. The required number of open yard shrubs is 100 and 50 for the open yard tree requirement. Please revise accordingly. A waiver to this requirement was not approved on the preliminary development plan.
Corrective Action Required
08/08/2019

All trees that are located within utility easements shall be revised to an ornamental variety. There are many locations where there is this conflict. Please revise the landscaping sheets as necessary. A waiver to this requirement was not approved on the preliminary development plan. Show all utility easements on the landscape plan sheets.
Corrective Action Required
08/08/2019

The UDO requires an additional parking lot island within the parking lot. For every four rows of parking area a parking lot island is required. A waiver to this requirement was not approved on the preliminary development plan. Has consideration been given to an internal sidewalk connection within the parking lot leading to the front entrance?
Corrective Action Required
08/08/2019

Provide the manufacturer's specifications for the wall-pak/building lighting.
Corrective Action Required
08/08/2019

All signs are required to be submitted by separate permit and approvals. Prior to the installation of any sings, City approvals are required.
Corrective Action Required
08/08/2019

On the architectural sheets provide a dashed line to indicate the location of the proposed RTU's. Provide a detail of proposed RTU screening. A pre manufactured screen was not approved as part of the preliminary development plan.
Corrective Action Required
08/08/2019

Indicate on the site plan the location and layout of the proposed outdoor seating area.
Corrective Action Required
08/08/2019

Confirm location of trash enclosure and provide detail. Confirm the material of the screening wall for the loading dock area.
Corrective Action Required
08/08/2019

Make a note on the accessible sign detail the sign shall conform to R7-8 sign type. This sign has a white background and green border.
Corrective Action Required
08/08/2019

Label the drive aisle widths at the island areas. The width is required to be 24-feet (not to include any portion of the curb). Provide the dimension excluding the curb.
Corrective Action Required
08/08/2019

At a detail for the proposed retaining wall to include height and exterior building material.
Corrective Action Required
08/08/2019

Label and dimension all sidewalks. Are sidewalks proposed along the prviate drives? Staff would encourage this. Is the sidewalk on the north side of the parking lot part of this lot's construction?
Building Codes Review Corrections 08/06/2019 08/08/2019
Joe Frogge
Corrective Action Required
08/08/2019

Water meter not found in design. Action required: Specify size and location of domestic water meter. 8/8/19 - water meter noted in letter as 1-1/2" but design drawings are not updated. Our water meter flow rates can be found in the downloadable fee estimation tool at: https://cityofls.net/development-services/construction/fees/fee-estimation-tool It is under the "building permit" tab. You'll see that a 2" meter goes up to 100gpm while a 1-1/2" meter is only capable of 50gpm. Update plans accordingly.
Traffic Review Corrections 08/06/2019 08/08/2019
Sue Pyles, P.E.
Corrective Action Required
08/08/2019

Add a sidewalk ramp on the SE corner of the building for pedestrian access to lots south.
Corrective Action Required
08/08/2019

Add sidewalk between the store front and east-west prive drive intersection with ramp for crossing the private drive to connect with adjacent lot (pedestrian access).
Engineering Review Corrections 08/06/2019 08/08/2019
Sue Pyles, P.E.
Corrective Action Required
08/08/2019

General: • As previously requested, revise the private road/access drive names to match the Final Development Plan that includes their construction. That FDP names them Private Road A, B and C. • The public easements along Lowenstein Drive have been revised. Please revise these plans to match. • Please revise the Engineer’s Estimate of Probable Construction Costs based on all review comments.
Corrective Action Required
08/08/2019

Sheet C01: Revise General Note 13 to refer to the 2018 code.
Corrective Action Required
08/08/2019

Sheet C04: Label the retaining wall as Proposed (By Others) rather than Existing.
Corrective Action Required
08/08/2019

Sheet C05: • Include the different hatchings in the Legend. • The proposed contour seems to extend to the middle of Pryor Road at the SE lot corner. Please revise. • It appears that labels were only added to proposed contours. Please add to all contours. • There are still many locations where proposed contours do not tie out, especially along lot boundaries. Please revise. • Please clarify the label for the small retaining wall on the south side of the building, “See Others for Details” does not make sense.
Corrective Action Required
08/08/2019

Sheet C08: • Please verify the presence of a sanitary sewer service stub to the south of the building. I’m not finding that information. If there is no stub, connection must be made with a cut-in wye. • The most recent plan set submitted to the City shows the stub for water line connection to be approximately 200’ north of the location shown. Please verify and revise as needed. • Indicate the water meter size. • HDPE is not an allowable water line pipe material. Please revise. • Verify that the water meter is located where it can be safely and easily accessed. • Indicate the pipe size and material of the “50 LF New Water Line” near the SE building corner. • Please remove “Public Works, Engineering Division of the” from Site Utility Notes 6 & 7. • Please reference Water Utilities Department in Site Utility Note 17.
Corrective Action Required
08/08/2019

Sheet C09: • Storm sewer profiles are required for all pipe greater than 6” in diameter. Please provide. • Verify that all pipe connections are called out along the roof drain. • Please remove “Public Works Dept.” from Note 3.
Corrective Action Required
08/08/2019

Sheet L01: Only ornamental tree varieties are allowed within public easements. Please revise.
Fire Review Approved with Conditions 08/06/2019 07/31/2019
Jim Eden
Code Statement
Informational
07/31/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Lanes - Marking
Corrective Action Required
07/31/2019

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. The fire lanes around the building shall be marked with a combination of signs and painted curbs.
Planning Review Corrections 06/17/2019 06/18/2019
Jennifer Thompson
Corrective Action Required
06/17/2019

Reduce the architectural plan sheet size to be no larger than 24 inches x 36 inches with one inch border.
Corrective Action Required
06/17/2019

Provide the drive aisle dimension between the islands within the parking lot. The drive aisle width shall be a minimum of 24' excluding the curb and gutter.
Corrective Action Required
06/17/2019

Provide the manufacturer's specifications for all exterior lighting.
Corrective Action Required
06/17/2019

The landscaping calculation for the open yard tree and shrub requirements is in error. The total square footage of the lot minus the building footprint (only), is the number to use for the landscape formula. Revise the tree caliper sizes to 3-inch caliper, the Unified Development Ordinance requires 3-inch. If trees are proposed within easements, revise the tree species to that of an ornamental variety.
Corrective Action Required
06/18/2019

The UDO requires some sort of landscaping within the parking lot islands (sod, trees, shrugs, mulch, ground cover, shrugs, etc.), please revise. This affects of few of the proposed islands that have pavers shown within them.
Corrective Action Required
06/18/2019

The UDO requires an additional parking lot islands (besides the islands on the end of every row), for every four rows. Please revise to account for a centered island somewhere "in the middle" of the parking lot. Had consideration been given to an internal sidewalk connection within the parking lot leading to the front entrance?
Corrective Action Required
06/18/2019

The preliminary development plan elevations had an "architectural detail/design that resembled wheat blowing in the wind" on the exterior of the building. Has consideration been given to include the detail with this plan submittal? Staff thought it was a nice detail as shown in the approved PDP.
Corrective Action Required
06/18/2019

The proposed pavement details do not meet UDO specifications. Please also refer to Engineering's comment regarding this reference.
Corrective Action Required
06/18/2019

Many standard details have been omitted. Please provide details for the following: -accessible sign -curbing -retaining wall (to include height) -proposed fencing -method of RTU screening (if something other than the parapet) -loading dock screening (to include height) -trash enclosure (if proposed)
Corrective Action Required
06/18/2019

On the architectural sheets provide a dashed line to indicate the location of the proposed RTU's. How will these be screened?
Corrective Action Required
06/18/2019

Label and dimension all sidewalks. Are sidewalks proposed along the private drives? Staff would encourage this. Is the sidewalk on the north side of the parking lot part of this lot's construction? Please clarify.
Corrective Action Required
06/18/2019

Clarify the location of the trash enclosure location/screening method. Staff is assuming it's integral to the loading dock area? Provide a detail and description of the proposed loading dock screening method.
Corrective Action Required
06/18/2019

Provide a CG-1 curbing call out and detail for proposed curbing.
Corrective Action Required
06/18/2019

Show all utility easements on the plan sheets.
Corrective Action Required
06/18/2019

Provide the surrounding property information.
Corrective Action Required
06/18/2019

All signs are required to be submitted by separate permit and approvals. Prior to the installation of any signs, City approvals are required.
Corrective Action Required
06/18/2019

Please reference within the plans the address for this lot of 840 NW Pryor Rd.
Engineering Review Corrections 06/17/2019 06/18/2019
Sue Pyles, P.E.
Corrective Action Required
06/18/2019

General: • Submit an Engineer’s Estimate of Probable Construction Costs. • Submit the SWPPP. • Nothing has been constructed yet on the site, and the timing of all construction elements is still unknown. Items labeled “Existing” would be better off labeled “Proposed (By Others)” or similar. • Revise the private road/access drive names to match the Final Development Plan that includes their construction. • Include all applicable standard details in the plan set.
Corrective Action Required
06/18/2019

Sheet C01: • Revise the Water Utilities address to 1200 SE Hamblen Road in the Utilities contact list. • Include the author of the oil/gas well source. • The General Notes introduction references a Preliminary Development Plan, but this is a Final Development Plan. Please revise. • Revise General Note 8 to reference Development Engineering Inspections.
Corrective Action Required
06/18/2019

Sheet C02: Why are some storm sewer called out as “Existing” but not all, and no other utilities are labeled that way? Perhaps adding a legend showing line weights/types or adding “Typ” to labels would be more consistent.
Corrective Action Required
06/18/2019

Sheet C04: The asphalt pavement sections do not meet the requirements shown in Section 8.620 of the Unified Development Ordinance. Revise details to meet requirements. Please note that the UDO requirements govern over any shown in the referenced geotechnical report unless a waiver is requested and approved by the City Engineer.
Corrective Action Required
06/18/2019

Sheet C05: • Label contour elevations. • All proposed contours must tie back into existing contours. • Add contour information to the Legend. • Include Top and Bottom Wall elevations.
Corrective Action Required
06/18/2019

Sheet C07: • Specify roof drain size, material, and how it connects to the storm structures. • Specify water line size, material, and what it connects to (tee, cross, etc.) • Label the sanitary sewer service line to be connected to the main with a cut-in tee.
Corrective Action Required
06/18/2019

Sheets C11 & C12: The proposed contours must tie back into the existing contours.
Traffic Review No Comments 06/17/2019 06/18/2019
Michael Park
Fire Review Approved with Conditions 06/17/2019 06/17/2019
Jim Eden
Code Statement
Informational
06/11/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
06/11/2019

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. It is recommended the hydrant be located on the FDC side of the fire lane.
Imposed Loads
Corrective Action Required
06/11/2019

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities.
Building Codes Review Corrections 06/17/2019 06/13/2019
Joe Frogge
Corrective Action Required
06/13/2019

Water meter not found in design. Action required: Specify size and location of domestic water meter.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $1,000.00 $1,000.00 Paid 06/03/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
06/03/2019 Receipt Receipt for transaction: 2019-003173
06/03/2019 Plans 2019.05.27 - Stormwater Memo
06/03/2019 Plans Applcation & Affidavit
06/03/2019 Plans Legal
06/03/2019 Plans Mckeevers FDP Checklist
06/03/2019 Plans Transmittal - McKeevers
06/03/2019 Plans 18-0281 LP-L01 Landscape Plan
06/03/2019 Plans 18-0281 LP-L02 Landscape Notes & Details - sealed
06/03/2019 Plans 18-0281 Sealed FDP
06/03/2019 Plans 2019.05.27 - Stormwater Memo
06/03/2019 Letter Routing Sheet - FDP
06/18/2019 Letter Applicant Letter - FDP (DFDP)
07/30/2019 Plans Trans_City
07/30/2019 Plans 190724 Response Letter_#1
07/30/2019 Plans 18-0281 Civil FDP - Resubmittal Set
07/30/2019 Plans 18-0281LND_FDP
07/30/2019 Letter Resubmittal Routing Sheet - FDP
08/08/2019 Letter Applicant Letter - FDP (DFDP)
10/02/2019 Letter Resubmittal Routing Sheet - FDP
10/02/2019 Plans 2019-7-26-A5-1_17-031-McKeevers_Lee's Summit-Roof Plan
10/02/2019 Plans 2019-10-01-A6-1_17-031-McKeevers_Lee's Summit-Bldg Elevations
10/02/2019 Plans 1850001330 E-1.3 Site Lighting Photometric Plan
10/02/2019 Plans 2019-7-26-A1-2_17-031-McKeevers_Lee's Summit-Dimension Plan
10/02/2019 Plans 18-0281 FDP REVISED SUBMITTAL
10/02/2019 Plans 18-0281 McKeever's Landscape
10/02/2019 Plans 190826 Response letter
10/02/2019 Plans 190924 Engineers Est
10/02/2019 Plans Building - Wall Sconce
10/02/2019 Plans Trans_City
10/25/2019 Plans 18-0281 FDP-SEALD
10/25/2019 Plans 18-0281 Landscape Combined-sealed
10/25/2019 Plans Stamped_McKeevers_Sight Line and Revised Elevations
10/25/2019 Plans 191022 Engineers Est
10/25/2019 Letter Resubmittal Routing Sheet - FDP
11/01/2019 Letter Applicant Letter - FDP (DFDP)
12/03/2019 Letter Applicant Letter - FDP (DFDP)
11/01/2019 Activity Document Fees PL2019191 McKeever's Market & Eatery FDP
07/30/2019 Plans 190730 Engineers Est
10/11/2019 Letter Applicant Letter - FDP (DFDP)
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home