Summary
PL2019113
GODDARD SCHOOL FOR EARLY CHILDHOOD DEVELOPMENT
Commercial Final Development Plan
Commercial Final Development Plan
Approved
03/25/2019
BROWNSTONE PROPERTIES-LEE'S SUMMIT LLC
Locations
Contacts
AJ BROWN INC, Address:635 TRADE CENTER BLVD, Phone:(314) 575-1568  
BROWNSTONE PROPERTIES-LEE'S SUMMIT LLC, Address:3351 NE RALPH POWELL RD  
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review No Comments 06/27/2019 06/27/2019
Mike Weisenborn
Building Codes Review No Comments 06/24/2019 06/19/2019
Mike Weisenborn
Fire Review Approved with Conditions 06/24/2019 06/19/2019
Mike Weisenborn
Code Statement
Informational
06/17/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Knox Locks
Informational
06/17/2019

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official.
Engineering Review Approved with Conditions 06/24/2019 06/19/2019
Mike Weisenborn
DE Engineers Estimate
Corrective Action Required
06/17/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee, and right of way fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $34,921.90
DE Contact Field Eng. Inspector
Corrective Action Required
06/17/2019

Contact Field Engineering Inspections at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
06/17/2019

Prior to any activities within the right-of-way that are not directly associated with a specific infrastructure or building permit, a separate right-of-way permit may be required. Contact a Right-of-Way Inspector at (816) 969-1800 to obtain the required permit.
DE Future Repair Work
Corrective Action Required
06/17/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE C&O #12 Cut & Fill
Corrective Action Required
06/17/2019

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Planning Review Approved with Conditions 06/24/2019 06/18/2019
Shannon McGuire
Corrective Action Required
06/18/2019

Note #6 on sheet A2.1 still lists Country Lane Red as a proposed color. This color is not consistent with the colors of the surrounding development or the approved PDP. Please remove this proposed color from the plans sheets.
Traffic Review No Comments 06/24/2019 06/18/2019
Michael Park
Planning Review Corrections 06/07/2019 06/06/2019
Shannon McGuire
Corrective Action Required
06/06/2019

Architectural sheets were not provided with the latest submittal. Please provide samples of the colors that you are proposing for the exterior of the building.
Corrective Action Required
06/06/2019

Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. The proposed aluminum fence does not meet the UDO requirements. The existing evergreens trees noted in your response to commit #16 from the Applicant’s Letter (dated 4-8-19) will not work to meet the UDO requirements. They are off site and not in control of this property owner/developer. This commit had been made in the two previous Applicant’s letters. Please propose a screening method that fulfils the UDO requirements.
Corrective Action Required
06/06/2019

As the property is within two miles of the airport, a Form 7460 shall be completed and submitted to the FAA, and comments received back prior to any construction.
Traffic Review No Comments 06/07/2019 06/06/2019
Mike Weisenborn
Fire Review Approved with Conditions 06/07/2019 06/06/2019
Mike Weisenborn
Code Statement
Informational
06/11/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Knox Locks
Informational
06/11/2019

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official.
Engineering Review Approved with Conditions 06/07/2019 06/06/2019
Gene Williams, P.E.
DE Engineers Estimate
Corrective Action Required
06/06/2019

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee, and right of way fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $34,921.90
DE Contact Field Eng. Inspector
Corrective Action Required
06/06/2019

Contact Field Engineering Inspections at (816) 969-1200 at least 48 hours prior to the onset of construction.
DE Contact ROW Inspector
Corrective Action Required
06/06/2019

Prior to any activities within the right-of-way that are not directly associated with a specific infrastructure or building permit, a separate right-of-way permit may be required. Contact a Right-of-Way Inspector at (816) 969-1800 to obtain the required permit.
DE Future Repair Work
Corrective Action Required
06/06/2019

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
DE C&O #12 Cut & Fill
Corrective Action Required
06/06/2019

Any cut and / or fill operations, which cause public infrastructure to exceed the maximum / minimum depths of cover shall be mitigated by relocating the infrastructure vertically and / or horizontally to meet the specifications contained within the City’s Design and Construction Manual.
Building Codes Review Approved with Conditions 06/07/2019 06/05/2019
Joe Frogge
Fire Review Approved with Conditions 05/15/2019 05/15/2019
Jim Eden
Code Statement
Corrective Action Required
05/08/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Knox Locks
Corrective Action Required
05/08/2019

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official.
Engineering Review Corrections 05/15/2019 05/15/2019
Gene Williams, P.E.
Corrective Action Required
05/15/2019

Please refer to the finish grades in the southwest portion of the site, near the shared driveway. According to the grades presented in the plan, it still appears that stormwater will bypass the new curb inlet, and flow toward the property to the south. There is not existing curb inlet within a close proximity of this shared driveway, and hence, it would appear this stormwater will adversely impact the property owner to the south.
Planning Review Corrections 05/15/2019 05/14/2019
Shannon McGuire
Corrective Action Required
05/14/2019

Please provide the manufactures spec sheets for the lighting to be use. Please also provide details for the proposed height of the poles/lights.
Corrective Action Required
05/14/2019

Please provide samples of the colors that you are proposing for the exterior of the building.
Corrective Action Required
05/14/2019

The proposed sign on sheet C.601 does not meet the UDO requirements, to be defined as a monument sign the base must be in contact with the ground. Please update the proposed sign so it meets UDO requirements or removed it from the plans. Please note all sings for the project shall be permitted by separate application through the sign permit process.
Corrective Action Required
05/14/2019

As noted in commit #10 from the Applicant’s Letter dated 4-8-19, the proposed cedar board gate for the trash enclosure does not meet the UDO requirements. Please update the proposed materials of the gate to comply with UDO requirements.
Corrective Action Required
05/14/2019

Sheet C.601 gives details for two fence types. I only see labels/locations (sheet C.100) for the fence type detailed in #16. Where will the fence type detailed in #13 be located?
Corrective Action Required
05/14/2019

Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. The proposed aluminum fence does not meet the UDO requirements. The existing evergreens trees noted in your response to commit #16 from the Applicant’s Letter (dated 4-8-19) will not work to meet the UDO requirements. They are off site and not in control of this property owner/developer. Please propose a screening method that fulfils the UDO requirements.
Building Codes Review No Comments 05/15/2019 05/14/2019
Joe Frogge
Traffic Review No Comments 05/15/2019 05/08/2019
Michael Park
Engineering Review Corrections 04/08/2019 04/08/2019
Gene Williams, P.E.
Corrective Action Required
04/08/2019

A stormwater detention memorandum was missing.
Corrective Action Required
04/08/2019

Typical drafting standards include bold lineweights to denote new features, such as sidewalk. As shown on Sheet C.100, it appears the sidewalk is already in place due to the light lineweight. It should be shown either on this sheet in bold lineweight, or elsewhere within the plan set in bold lineweight.
Corrective Action Required
04/08/2019

The final restoration plan included in the erosion and sediment plan makes no mention of removal of inlet protection devices, silt fences, etc. In fact, it is not really clear what this sheet is showing, other than seeding.
Corrective Action Required
04/08/2019

A 65 foot wide access and utility easement is not labeled on Sheet C.100. This easement should be shown on each sheet, labeled on each sheet, and defined as a private easement as indicated on the plat.
Corrective Action Required
04/08/2019

Details were not provided for: 1) pavement design, 2) curb and gutter, showing the pavement design and subgrade extending a minimum of one (1) foot beyond the back of curb, 3) sanitary sewer connection standard detail, including tracer wire, 4) backflow vault, and method used to drain the sump, 6) water meter standard detail, 7) trenching and backfilling detail.
Corrective Action Required
04/08/2019

Sheet C.603: Sidewalk detail is incorrect and contradicts GEN-2 shown on Sheet C.604. Please remove.
Corrective Action Required
04/08/2019

Sheet C.604: GEN-4 is not used on this project. This is not curb replacement. Any new curb and gutter used on this project is new construction, not curb replacement. A detail is needed showing the pavement and subgrade, with the extension one (1) foot beyond the back of curb.
Corrective Action Required
04/08/2019

Storm Plans: Why is the private storm line being directed to another private storm line? It appears the private storm system should be connected to the 30" line at the public field inlet.
Corrective Action Required
04/08/2019

The parking lot appears to lack any additional curb inlets. It is not clear what impact this will have on adjacent property owners, or City right of way.
Corrective Action Required
04/08/2019

The fire line should be connected to the 12 inch line across Ralph Powell Rd. The 6 inch line beneath Ralph Powell Rd. is essentially acting as a private water main serving a single lot. Connecting the fire line and domestic service line to this private line is not allowed.
Corrective Action Required
04/08/2019

The fire line connection to the 12 inch line on the west side of Ralph Powell Rd. will require no additional butterfly valve on the 12 inch main since there is already a butterfly valve within 500 feet of this fire line branch. However, a new gate valve is required on the fire line leg, on each side of Ralph Powell Rd. The final gate valve on the east side of Ralph Powell Rd. denotes the end of the public line. The domestic water connection may be tapped immediately prior to this gate valve.
Corrective Action Required
04/08/2019

Please specify a cut-in tee for the new 12 inch connection. In addition, please provide specific instructions that night work will be required, with a total shut-down of no more than 8 hours. All shut-downs of the water main must follow the City of Lee's Summit standards in terms of contractor notification of affected property owners, minimum notice of 48 hours, and coordination with the City inspector for the actual shut-down.
Corrective Action Required
04/08/2019

The backflow vault should be relocated outside the limits of the public 10 foot general utility easement. As shown, it is within the limits of this easement.
Corrective Action Required
04/08/2019

Sheet C.302: The profile views of the storm lines show inlets below grade, both in terms of the graphical representation, and the call-outs.
Corrective Action Required
04/08/2019

Fire hydrant(s) location(s) were missing. If private, they may be connected to the private fire line after the backflow vault.
Corrective Action Required
04/08/2019

Existing sidewalk appears to be extended beyond the lot to the south, and it appears the plan is to keep the existing sidewalk, and extend to the north. Is this existing sidewalk compliant with the 2.0% rule? We would request a note be made on the plans stating that "...existing sidewalk may need to be removed and replaced to meet the 1.5% design standard, with no more than 2.0% cross-slope as a construction tolerance", or equivalent language.
Corrective Action Required
04/08/2019

Various Sheets: What are the unknown features shown in the northeast and southeast corners? These are shown on various sheets, including Sheet C.200, in both corners. These features are shown in bold lineweight.
Corrective Action Required
04/08/2019

An itemized and sealed Engineer's Estimate of Probable Construction Costs is required.
Planning Review Corrections 04/08/2019 04/04/2019
Shannon McGuire
Corrective Action Required
04/04/2019

Please label the width of the proposed sidewalks.
Corrective Action Required
04/04/2019

Please add a pedestrian connection from the sidewalk that runs parallel to the west property line to the interior of the site.
Corrective Action Required
04/04/2019

Please label the dimensions of the ADA stalls and aisle.
Corrective Action Required
04/04/2019

Please label the width of the driveways and drive aisles.
Corrective Action Required
04/04/2019

Please provide details on the proposed lighting. Please be sure to include the height, pole details and the manufactures spec sheets for the lighting to be use.
Corrective Action Required
04/04/2019

The proposed ground sign on sheet C.600 does not meet the UDO requirements, as it is too large. Ground signs are limited to 16 sq. ft. Should you add a masonry base to the sign, it would be defended as a monument sign and be subject to a maximum area of 72 sq. ft. for the sign face and 96 sq. ft. total structure area. Please update the detail to meet the UDO requirements or remove it from the plans.
Corrective Action Required
04/04/2019

The approved Preliminary Development Plan requires that the colors for the proposed building be a natural color and consistent with the other structures in the surrounding development. The proposed “Countrylane Red” does not seem to meet this requirement. Please propose a different color that is consistent with the approved PDP.
Corrective Action Required
04/04/2019

In the “Landscaping Requirements” box on sheet L-2, please show your calculations for the required open yard trees. For required trees I calculate it at 10.4 trees required, 63,014.58 (total land area) – 10,964 (building footprint)/5000.
Corrective Action Required
04/04/2019

In the “Landscaping Requirements” box on sheet L-2, please check the calculations for required open yard shrubs. I calculated 20.8 are required. When calculating the open yard requirements for trees and shrubs you may subtract the total building footprint not the total impervious area. 63,014.58 (total land area) – 10,964 (building footprint)/5000*2.
Corrective Action Required
04/04/2019

Sheet C601 shows options for the construction materials for the trash enclosure. Please only provide the details you are proposing to build. Also, please note the proposed cedar board gate does not meet the UDO requirements.
Corrective Action Required
04/04/2019

Landscape islands, strips or other planting areas shall be located within the parking lot and shall constitute at least 5% of the entire area devoted to parking spaces, aisles and driveways. Please provide this information.
Corrective Action Required
04/04/2019

Please label the parking lot setback from the north property line.
Corrective Action Required
04/04/2019

Sheet C.600 shows a detail for the ADA signage that is too tall. Sheet C.603 shows a detail for the ADA signage the meets the UDO requirements. Please updated the sheets so that they are consistent.
Corrective Action Required
04/04/2019

It appears that you are proposing to install bollards adjacent to the parking stalls that are in front of the proposed building. As the proposed stalls are only 17.5’ deep the bollards must be setback from the face of the curb to the face of the bollard a minimum of 1.5’ to ensure adequate depth. Please label this setback.
Corrective Action Required
04/04/2019

Please relocate the required ADA stalls/aisle so that it is nearest to the main entrance doors. Please ensure that the proposed bollards are not interfering with the required ADA route.
Corrective Action Required
04/04/2019

Please provide the location, size, and type of material to be used in all screening of ground mounted mechanical equipment.
Corrective Action Required
04/04/2019

Please provide the manufacturer’s specification sheets for proposed mechanical equipment to be used.
Fire Review Corrections 04/01/2019
Jim Eden
Code Statement
Corrective Action Required
04/01/2019

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
04/01/2019

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Action required: Provide a hydrant within 100 feet of the FDC. This will also satifify the requirement of item #3.
Hydrants
Corrective Action Required
04/01/2019

IFC 507.5.1 - Where a portion of the facility or building hereafter constructed or moved into or within the jurisdiction is more than 300 feet from a hydrant on a fire apparatus access road, as measured by an approved route around the exterior of the facility or building, on-site fire hydrants and mains shall be provided where required by the fire code official. Action required: Provide a fire hydrant to meet this requirement and Item #2.
Knox Locks
Corrective Action Required
04/01/2019

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official.
Imposed Loads
Corrective Action Required
04/01/2019

IFC 503.2.3 - Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. Action required: The drive lanes shall be heavy duty asphalt.
Building Codes Review Corrections 04/08/2019 04/01/2019
Joe Frogge
Corrective Action Required
04/01/2019

2012 IPC 708.3.2 Building sewers. Building sewers shall be provided with cleanouts located not more than 100 feet apart measured from the upstream entrance of the cleanout. For building sewers 8 inches and larger, manholes shall be provided and located not more than 200 feet from the junction of the building drain and building sewer, at each change in direction and at intervals of not more than 400 feet apart. Manholes and manhole covers shall be of an approved type. Action required: Provide cleanouts in yard to comply.
Traffic Review No Comments 04/08/2019 03/26/2019
Michael Park
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $600.00 $600.00 Paid 03/25/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
03/25/2019 Receipt Receipt for transaction: 2019-001024
03/25/2019 Letter Routing Sheet - FDP
04/08/2019 Letter Applicant Letter - FDP (DFDP)
05/08/2019 Letter Resubmittal Routing Sheet - FDP
05/15/2019 Letter Applicant Letter - FDP (DFDP)
05/31/2019 Plans SSS-H_Poles_spec_sheet
05/31/2019 Plans 3452A_NX_Panels_Cutsheet
05/31/2019 Plans Binder1
05/31/2019 Plans C.001 COVER SHEET
05/31/2019 Plans C.050 ESC PHASE 1-PRE CLEARING PLAN
05/31/2019 Plans C.051 ESC PHASE 2-INACTIVE AREA STABILIZATION PLAN
05/31/2019 Plans C.052 ESC PHASE 3-FINAL RESTORATION PLAN
05/31/2019 Plans C.100 SITE PLAN
05/31/2019 Plans C.101 DIMENSION PLAN
05/31/2019 Plans C.200 GRADING PLAN
05/31/2019 Plans C.201 SPOT ELEVATIONS
05/31/2019 Plans C.202 SPOLT ELEVATIONS
05/31/2019 Plans C.602 CONSTRUCTION DETAILS
05/31/2019 Plans C.603 CONSTRUCTION DETAILS
05/31/2019 Plans C.604 CONSTRUCTION DETAILS
05/31/2019 Plans kl_alt1_spec
05/31/2019 Plans kl_wds_spec
05/31/2019 Plans LANDSCAPE PLAN
05/31/2019 Plans sss_pole
05/31/2019 Letter Resubmittal Routing Sheet - FDP
06/06/2019 GoddardSchoolFDPFeeWorksheet
06/07/2019 Letter Applicant Letter - FDP (DFDP)
06/11/2019 Letter FAA DETERMINATION
06/17/2019 Letter Resubmittal Routing Sheet - FDP
06/19/2019 Letter Applicant Letter - FDP (DFDP)
06/26/2019 Email RE Goddard School for Early Childhood Development
06/27/2019 Letter Applicant Letter - FDP (DFDP)
09/24/2019 Plans C.303 STORM SEWER PLAN AND PROFILE
09/24/2019 Plans Binder1
09/24/2019 Plans C.300 UTILITY PLAN
09/24/2019 Plans C.301 STORM SEWER PLAN
09/24/2019 Plans C.302 STORM SEWER PLAN AND PROFILE
09/24/2019 Letter Resubmittal Routing Sheet - FDP
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: