| Review Type |
Outcome |
Est. Completion Date |
Completed |
|
Engineer Review - Grading
|
Corrections
|
03/18/2026
|
03/18/2026
|
|
|
Susan Nelson, P.E.
|
|
|
Miscellaneous Correction
Corrective Action Required
Revise the limits of disturbance to include the proposed temporary cul-de-sac.
|
|
|
|
|
Engineering Review - Street and Storm
|
Corrections
|
03/18/2026
|
03/18/2026
|
|
|
Susan Nelson, P.E.
|
|
|
Miscellaneous Correction
Corrective Action Required
Revise pavement sections per the Design and Construction Manual - Section 5200 (Table LS-2) for design criteria and Section 2200 for the material specification. Use the correct asphalt mix in the typical section. All asphalt options require an aggregate base course. Add the following notes to the plans.
- All asphalt materials shall conform to the KCMMB ASPHALT MATERIAL SPECIFICATION, current edition.
- All concrete materials for paving curb and gutter, sidewalks, paths, commercial driveways and other pavements in the right of way shall conform to the KCMMB specifications.
|
|
|
Miscellaneous Correction
Corrective Action Required
Revise the sidewalk pavement section per Standard Detail GEN-2. Show and label the concrete and compacted aggregate sidewalk thicknesses.
|
|
|
|
|
Engineering Review - Water
|
Corrections
|
03/18/2026
|
03/18/2026
|
|
|
Susan Nelson, P.E.
|
|
|
Miscellaneous Correction
Corrective Action Required
Please provide the size, location, and fire flow requirements for the building planned for LOT 47 and the lots to the west of Sta. 5+55, so that it may be determined if the 8-inch water main is adequate for fire flow requirements for the future build.
|
|
|
|
|
Engineering Review - Street and Storm
|
Corrections
|
02/18/2026
|
02/18/2026
|
|
|
Susan Nelson, P.E.
|
|
|
Miscellaneous Correction
Corrective Action Required
Submit the SWPPP and a copy of the MDNR Land Disturbance Permit.
|
|
|
Miscellaneous Correction
Corrective Action Required
Submit a stormwater memo.
|
|
|
Miscellaneous Correction
Corrective Action Required
Check that all drainage structures have adequate fall through the structures. For specific guidance, refer to APWA Section 5604.5 - Inverts and Pipes.
|
|
|
Miscellaneous Correction
Corrective Action Required
The crossroad storm pipe material must be RCP or CPP.
|
|
|
Miscellaneous Correction
Corrective Action Required
Verify the elevation of field inlet and the proposed sump elevation. Verify that the proposed drainage easement is wide enough for the proposed drainage plan. Provide a swale cross section in the plans.
|
|
|
Miscellaneous Correction
Corrective Action Required
Revise pavement sections per the Design and Construction Manual - Section 5200 (Table LS-2) for design criteria and Section 2200 for the material specification. Cul-de-sac pavement must be the same material and typical section as the rest of the roadway.
|
|
|
Miscellaneous Correction
Corrective Action Required
Revise the pavement section sidewalk design per Standard Detail GEN-2 and add detail to the plans.
|
|
|
|
|
Engineer Review - Grading
|
Corrections
|
02/18/2026
|
02/18/2026
|
|
|
Susan Nelson, P.E.
|
|
|
Miscellaneous Correction
Corrective Action Required
Submit the SWPPP and a copy of the MDNR Land Disturbance Permit.
|
|
|
Miscellaneous Correction
Corrective Action Required
Submit a stormwater memo.
|
|
|
|
|
Engineering Review - Water
|
Corrections
|
02/18/2026
|
02/18/2026
|
|
|
Susan Nelson, P.E.
|
|
|
Miscellaneous Correction
Corrective Action Required
Submit the SWPPP and a copy of the MDNR Land Disturbance Permit.
|
|
|
Miscellaneous Correction
Corrective Action Required
Submit a stormwater memo.
|
|
|
Miscellaneous Correction
Corrective Action Required
Add a straddle block to restrain the hydrant assembly at Sta. 5+55.19.
|
|
|
Miscellaneous Correction
Corrective Action Required
Please provide the size, location, and fire flow requirements for the building planned for LOT 47 and the lots to the west of Sta. 5+55, so that it may be determined if the 8-inch water main is adequate for fire flow requirements for the future build.
|
|
|
Miscellaneous Correction
Corrective Action Required
Where sidewalks will be placed on the same side of the street as the water main, the water main shall be located at least four feet from the sidewalk outside the right of way in a utility easement. Relocate the water main within the easement.
|
|
|
|
|
Traffic Review - Streets
|
No Comments
|
02/18/2026
|
02/17/2026
|
|
|
Erin Ralovo
|
|
|
|