Permit Application Status

PRSUBD20240917


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary


PRSUBD20240917
Public Infrastructure
Issued
ANACONDA LLC
DEVELOPMENT COMPLETE
Install 300 LF of 12" C-900 Watermain
02/28/2024
09/11/2024
Locations
Contacts
ANACONDA LLC, Address:1507 NE WALL ST  
Patrick Joyce, Address:805 Pennsylvania Ave Suite 150, Phone:(785) 550-8994  
Kimley-Horn, Address:Attn: Patrick Joyce, Phone:(816) 281-7687  
Kimley-Horn, Address:Attn: Patrick Joyce, Phone:(816) 281-7687  
Matt Hendrickson, Address:1507 NE Wall Street, Phone:(816) 609-8633  
Capital Builders, LLC, Address:1507 NE Wall Street  
MIDWEST WASH GROUP LLC, Address:1362 NE WINDSOR DR  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review - Water No Comments 05/20/2024 05/10/2024
Sue Pyles, P.E.
Miscellaneous Correction
Corrective Action Required
05/07/2024

Sheet C300: • Please revise the tee size in Plan view to match the revised existing pipe size. • Please note that Pressure Class 235 or DR18 is adequate. Pressure Class 250 is not necessary. • The horizontal graphic scale on Sheet C300 appears to be wrong. Please verify and revise as needed. • The north arrow is pointing west, please revise. • There appears to be a 20’ Utility Easement along the north property line. Please verify. If it is present, then the proposed U/E at that location is not required.
Miscellaneous Correction
Corrective Action Required
05/07/2024

Please add the following items to the estimate: • Thrust Block • Tee • Bends
Miscellaneous Correction
Corrective Action Required
05/07/2024

The existing 16" water main on the south side of SE Thompson Drive is located within the R/W. Please revise the plans to correctly locate the main. The proposed U/E will not be required since the extension will be within the R/W.
Engineering Review - Water Corrections 04/16/2024 04/16/2024
Sue Pyles, P.E.
Miscellaneous Correction
Resolved
04/16/2024

Please submit an Engineer’s Estimate of Probable Construction Costs.
Miscellaneous Correction
Resolved
04/16/2024

The existing water main on the south side of SE Thompson Drive is 16” line, please revise.
Miscellaneous Correction
Resolved
04/16/2024

Our records indicate the existing water main on the north side of SE Thompson Drive is a 16” line. Please verify and revise if necessary.
Miscellaneous Correction
Resolved
04/16/2024

The existing water main running east west at the north connection point is an 8” line. Please revise valves accordingly.
Miscellaneous Correction
Resolved
04/16/2024

Please show and label all existing utility easements and provide easements for any sections of public main outside of existing easements.
Miscellaneous Correction
Resolved
04/16/2024

Will the tee and valves for the Flex Space fire line be installed as a part of this plan set? The notes were unclear if the tee and valves were future or just the fire line.
Miscellaneous Correction
Resolved
04/16/2024

Please remove the trench check detail, it’s not required.
Miscellaneous Correction
Corrective Action Required
04/16/2024

Sheet C300: • Please revise the tee size in Plan view to match the revised existing pipe size. • Please note that Pressure Class 235 or DR18 is adequate. Pressure Class 250 is not necessary. • The horizontal graphic scale on Sheet C300 appears to be wrong. Please verify and revise as needed. • The north arrow is pointing west, please revise. • There appears to be a 20’ Utility Easement along the north property line. Please verify. If it is present, then the proposed U/E at that location is not required.
Miscellaneous Correction
Corrective Action Required
04/16/2024

Please add the following items to the estimate: • Thrust Block • Tee • Bends
Miscellaneous Correction
Corrective Action Required
04/16/2024

The existing 16" water main on the south side of SE Thompson Drive is located within the R/W. Please revise the plans to correctly locate the main. The proposed U/E will not be required since the extension will be within the R/W.
Engineering Review - Water Corrections 03/14/2024 03/14/2024
Sue Pyles, P.E.
Miscellaneous Correction
Corrective Action Required
03/14/2024

Please submit an Engineer’s Estimate of Probable Construction Costs.
Miscellaneous Correction
Corrective Action Required
03/14/2024

The existing water main on the south side of SE Thompson Drive is 16” line, please revise.
Miscellaneous Correction
Corrective Action Required
03/14/2024

Our records indicate the existing water main on the north side of SE Thompson Drive is a 16” line. Please verify and revise if necessary.
Miscellaneous Correction
Corrective Action Required
03/14/2024

The existing water main running east west at the north connection point is an 8” line. Please revise valves accordingly.
Miscellaneous Correction
Corrective Action Required
03/14/2024

Please show and label all existing utility easements and provide easements for any sections of public main outside of existing easements.
Miscellaneous Correction
Corrective Action Required
03/14/2024

Will the tee and valves for the Flex Space fire line be installed as a part of this plan set? The notes were unclear if the tee and valves were future or just the fire line.
Miscellaneous Correction
Corrective Action Required
03/14/2024

Please remove the trench check detail, it’s not required.
Fees
Paid Fees Amount Paid Owing Date Paid
91100C9-Water Insp Fee $3,732.74 $3,732.74 Paid 08/24/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Grading/Excavation/Fill Inspection Pending
Punch List Inspection Pending
Erosion Control Inspection Pending
Misc
Corrective Action Required
10/15/2024
10-15-24 Dustin A, Talked with super about some silt fence down on north side. They need to remove some brush to get silt fence further back. Should be corrected soon
Site Visit Pending
Misc
Corrective Action Required
06/17/2025
5-12-25 Dustin A, bore company has bored under road for both street crossings. Dan is working on building fittings and laying new line for tie ins before shut down 5-27-25 Dustin A, met with water out to discuss building of hydrant on thompson. Should be built today with concrete pouring tomorrow and recharging of line. 6-17-25 Dustin A, working on removing mud and prepping drive
Site Visit Partial 09/20/2024
Misc
Informational
09/20/2024
9-20-24 Dustin A, No activity at this time
Site Visit Partial 10/4/2024 10/4/2024 10/04/2024
Misc
Informational
09/20/2024
9-20-24 Dustin A, No activity at this time 10-4-24 DP. Crew was onsite to install silt fence and then no other work this week.
Site Visit Partial 10/9/2024 10/9/2024 10/10/2024
Misc
Informational
10/04/2024
9-20-24 Dustin A, No activity at this time 10-4-24 DP. Crew was onsite to install silt fence and then no other work this week. 10-9-24 Dustin A, no activity on site
Site Visit Partial 10/10/2024 10/10/2024 10/11/2024
Misc
Informational
10/10/2024
9-20-24 Dustin A, No activity at this time 10-4-24 DP. Crew was onsite to install silt fence and then no other work this week. 10-9-24 Dustin A, no activity on site 10-10-24 Dustin A, No activity on site
Site Visit Partial 10/14/2024
Misc
Informational
10/11/2024
9-20-24 Dustin A, No activity at this time 10-4-24 DP. Crew was onsite to install silt fence and then no other work this week. 10-9-24 Dustin A, no activity on site 10-10-24 Dustin A, No activity on site 10-14-24 Dustin A, N\A
Erosion Control Inspection Partial 10/15/2024 10/15/2024 10/15/2024
Misc
Corrective Action Required
10/15/2024
10-15-24 Dustin A, Talked with super about some silt fence down on north side. They need to remove some brush to get silt fence further back. Should be corrected soon
Site Visit Partial 10/22/2024 10/22/2024 10/22/2024
Misc
Informational
10/14/2024
9-20-24 Dustin A, No activity at this time 10-4-24 DP. Crew was onsite to install silt fence and then no other work this week. 10-9-24 Dustin A, no activity on site 10-10-24 Dustin A, No activity on site 10-14-24 Dustin A, N\A 10-22-24 Dustin A , site prep
Site Visit Partial 11/13/2024
Misc
Informational
10/22/2024
9-20-24 Dustin A, No activity at this time 10-4-24 DP. Crew was onsite to install silt fence and then no other work this week. 10-9-24 Dustin A, no activity on site 10-10-24 Dustin A, No activity on site 10-14-24 Dustin A, N\A 10-22-24 Dustin A , site prep 10-13-24 Dustin A, No work due to rain
Site Visit Partial 2/24/2025 2/24/2025 02/24/2025
Misc
Informational
11/13/2024
9-20-24 Dustin A, No activity at this time 10-4-24 DP. Crew was onsite to install silt fence and then no other work this week. 10-9-24 Dustin A, no activity on site 10-10-24 Dustin A, No activity on site 10-14-24 Dustin A, N\A 10-22-24 Dustin A , site prep 10-13-24 Dustin A, No work due to rain
Site Visit Partial 4/23/2025 4/23/2025 04/23/2025
Misc
Informational
02/24/2025
9-20-24 Dustin A, No activity at this time 10-4-24 DP. Crew was onsite to install silt fence and then no other work this week. 10-9-24 Dustin A, no activity on site 10-10-24 Dustin A, No activity on site 10-14-24 Dustin A, N\A 10-22-24 Dustin A , site prep 10-13-24 Dustin A, No work due to rain 4-23-25 Dustin A, Met with Dan to get a gameplan on water main extension. looking to start in next couple of weeks
Site Visit Partial 05/12/2025
Misc
Corrective Action Required
05/12/2025
5-12-25 Dustin A, bore company has bored under road for both street crossings. Dan is working on building fittings and laying new line for tie ins before shut down
Water Line - Construction Inspection Partial 05/15/2025
Misc
Informational
05/15/2025
5-15-25 Dustin A, Working on water main extension. Both bores are completed. will complete decker tie in before we do thompson.
Water Line - Construction Inspection Partial 05/19/2025
Misc
Informational
05/19/2025
5-19-25 Dustin A, Water main extension has been installed along with needed valves. Will need to do another tie in on thompson. Due to rain they are building the connections for last tie in as well as working on service line.
Water Line - Construction Inspection Partial 5/21/2025 5/21/2025 05/21/2025
Misc
Informational
05/19/2025
5-19-25 Dustin A, Water main extension has been installed along with needed valves. Will need to do another tie in on thompson. Due to rain they are building the connections for last tie in as well as working on service line. 5-21-25 Dustin A, Tie in on thompson has been completed. Will pour thrust blocks tomorrow . Hydrant was to deep so will do that tie in at a later date
Site Visit Partial 5/27/2025 5/27/2025 05/27/2025
Misc
Corrective Action Required
05/12/2025
5-12-25 Dustin A, bore company has bored under road for both street crossings. Dan is working on building fittings and laying new line for tie ins before shut down 5-27-25 Dustin A, met with water out to discuss building of hydrant on thompson. Should be built today with concrete pouring tomorrow and recharging of line.
Water Line - Hydrostatic Test Partial 6/2/2025 6/2/2025 06/02/2025
Misc
Informational
06/02/2025
6-2-25 Dustin A, 240 ft of water main extension was hydrostatic tested and held for 2 hrs and passed. Chlorinating today.
Water Line - Coliform Test 1 Passed 06/11/2025
Misc
Informational
06/11/2025
6-11-25 Dustin A, water sample passed on 6-7
Water Line - Hydrostatic Test Passed 6/2/2025 6/2/2025 06/12/2025
Misc
Informational
06/02/2025
6-2-25 Dustin A, 240 ft of water main extension was hydrostatic tested and held for 2 hrs and passed. Chlorinating today.
Water Line - Coliform Test 1 Passed 6/12/2025 6/12/2025 06/12/2025
Misc
Informational
06/12/2025
6-5-25 Dustin A, First samples taken up 6-6-25 Dustin A, Results from first sample are passing
Water Line - Coliform Test 2 Passed 6/12/2025 6/12/2025 06/12/2025
Misc
Informational
06/12/2025
6-10-25 Dustin A, Second sample has been drawn and dropped off at Blue valley 6-11-25 Dustin A, Second sample has passed.
Water Line - Construction Inspection Passed 06/12/2025
Misc
Informational
05/21/2025
5-19-25 Dustin A, Water main extension has been installed along with needed valves. Will need to do another tie in on thompson. Due to rain they are building the connections for last tie in as well as working on service line. 5-21-25 Dustin A, Tie in on thompson has been completed. Will pour thrust blocks tomorrow . Hydrant was to deep so will do that tie in at a later date 6-12-25 Dustin A, Water line extension has been completed at this time, and hydrant on thompson has been installed.
Site Visit Partial 6/17/2025 6/17/2025 06/17/2025
Misc
Corrective Action Required
05/27/2025
5-12-25 Dustin A, bore company has bored under road for both street crossings. Dan is working on building fittings and laying new line for tie ins before shut down 5-27-25 Dustin A, met with water out to discuss building of hydrant on thompson. Should be built today with concrete pouring tomorrow and recharging of line. 6-17-25 Dustin A, working on removing mud and prepping drive
Documents & Images
Date Uploaded File Type Document Name
02/28/2024 Plans SE Bailey and Decker Watermain_1_2-28-2024
04/03/2024 Engineers Estimate LS Flex Space Public Water Main EOPCC_2_3-28-2024
04/03/2024 Plans LS Flex Space Public Water Main Plans_2_3-28-2024
04/03/2024 Letter LS Flex Space Water Main Extension Comment Response Letter_2_3-28-2024
04/16/2024 Email Staff Comments_04162024
05/06/2024 Letter LS Flex Space Public Water Main Comment Response Letter_3_5-6-2024
05/06/2024 Engineers Estimate LS Flex Space Public Water Main EOPCC_3_5-6-2024
05/06/2024 Plans LS Flex Space Public Water Main Plans_3_5-6-2024
07/02/2024 Approved Plans LS Flex Space Public Water Main Plans_Approved
08/24/2024 Receipt Receipt for transaction:2024-007182
09/10/2024 Letter DE-Permit
09/20/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/11/2024 Letter INSPECTION SUMMARY
10/11/2024 Letter INSPECTION SUMMARY
10/14/2024 Letter INSPECTION SUMMARY
10/15/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
11/13/2024 Letter INSPECTION SUMMARY
02/19/2025 flexsewer2
02/19/2025 flexsewer5
02/19/2025 flexsewer1
02/19/2025 flexsewer4
02/19/2025 flexsewer3
02/24/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
04/23/2025 Letter INSPECTION SUMMARY
05/12/2025 Letter INSPECTION SUMMARY
05/15/2025 Letter INSPECTION SUMMARY
05/19/2025 Letter INSPECTION SUMMARY
05/21/2025 Letter INSPECTION SUMMARY
05/21/2025 Letter INSPECTION SUMMARY
05/27/2025 Letter INSPECTION SUMMARY
06/02/2025 Letter INSPECTION SUMMARY
06/02/2025 Letter INSPECTION SUMMARY
06/02/2025 Letter INSPECTION SUMMARY
06/11/2025 Letter INSPECTION SUMMARY
06/11/2025 flex watersmple1
06/12/2025 flex watersmple1pass
06/12/2025 flexwatersample2pass
06/12/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/12/2025 Letter INSPECTION SUMMARY
06/17/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home