Permit Application Status

PRRES20251603


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20251603
Building Permit - Residential
Temporary Occupancy
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. WALKOUT BASEMENT. COVERED DECK. RETAINING WALL IN REAR APPROVED ON PERMIT 20246324.
04/21/2025
05/05/2025
10/21/2025
Locations
Contacts
TRUMARK HOMES, LLC, Address:424 SE MAXWELL DR, Phone:(816) 564-5613  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
MARK A YANCIK, Address:508 nw manor dr  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
IMPACT ELECTRICAL SOLUTIONS LLC, Address:14 ANCHOR DRIVE, Phone:(816) 674-9345  
A BRIGHT PLUMBING LLC, Address:201 NE WOODBURY DR, Phone:(816) 867-4540  
TRUMARKHOMES.KYLE@GMAIL.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
Water Tap Fee $3,973.00 $3,973.00 Paid 05/05/2025
Water Meter Fee $748.03 $748.03 Paid 05/05/2025
Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 05/05/2025
Right of Way Permit Fee $85.00 $85.00 Paid 05/05/2025
Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 05/05/2025
Valuation Fee New Single Family $2,803.36 $2,803.36 Paid 05/05/2025
Not Ready Inspection Fee $75.00 $75.00 Paid 05/26/2025
Temporary Occupancy Fee $50.00 $50.00 Paid 03/04/2026
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Misc
Corrective Action Required
03/02/2026
- PROVIDE AS GRADED PLOT PLAN WITH POOL AND RETAINING WALL INCLUDED
Erosion Control Inspection Residential Pending
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/02/2026
1/21/26 EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -Provide ESC methods at perimeter, clean silt and debris from storm inlet, clean debris from street
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
03/03/2026
- Final grading and sod - Sump discharge to be 36” away from foundation - Provide splash pads at downspouts - Land sewer trace wire at grade - Raise water meter pit to grade and have meter 14-18” from lid
Footing Inspection - Residential Failed 5/8/2025 5/8/2025 05/08/2025
Misc
Corrective Action Required
05/08/2025
3RD party footing inspection denied no address, footing still being formed and rebar being set -contractor must call in for inspection -must provide pier layout and inspection report prior to footing pour/inspcection Mitchell Schwarz 05/08/2025 10:12 AM
Footing Inspection - Residential Failed 5/8/2025 5/8/2025 05/08/2025
Misc
Corrective Action Required
05/08/2025
3RD party footing inspection denied no address, footing still being formed and rebar being set -contractor must call in for inspection -must provide pier layout and inspection report prior to footing pour/inspcection Mitchell Schwarz 05/08/2025 10:12 AM No inspection performed -No inspection performed on piers. Mitchell Schwarz 05/08/2025 02:32 PM
Footing Inspection - Residential Not Ready 5/9/2025 5/9/2025 05/16/2025
Misc
Corrective Action Required
05/08/2025
3RD party footing inspection denied no address, footing still being formed and rebar being set -contractor must call in for inspection -must provide pier layout and inspection report prior to footing pour/inspcection Mitchell Schwarz 05/08/2025 10:12 AM No inspection performed -No inspection performed on piers. Mitchell Schwarz 05/08/2025 02:32 PM NOT REDY FOR INSPECTION -no address -no plans on site -fixes not done or made to engineer letter specifications (piers too shallow, piers to high)
Footing Inspection - Residential Failed 5/16/2025 5/16/2025 05/16/2025
Misc
Resolved
05/16/2025
3RD party footing inspection denied no address, footing still being formed and rebar being set -contractor must call in for inspection -must provide pier layout and inspection report prior to footing pour/inspcection Mitchell Schwarz 05/08/2025 10:12 AM No inspection performed -No inspection performed on piers. Mitchell Schwarz 05/08/2025 02:32 PM NOT REDY FOR INSPECTION -no address -no plans on site -fixes not done or made to engineer letter specifications (piers too shallow, piers to high)
Misc
Corrective Action Required
05/16/2025
Okay to pour. Footing Footing failed until pier for deck has been installed and inspected
Sewer Service Inspection - R Passed 5/28/2025 5/28/2025 05/28/2025
Water Service Inspection - R Passed 5/29/2025 05/29/2025
Erosion Control Inspection Residential Failed 05/29/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/29/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -STREET CLEAN UP REQUIRED IMMEADIATELY. -POST ADDRESS -MAINTAIN GRAVEL DRIVE WITH MIN 3/4" GRAVEL IN MIN 6" LIFT -MAINTAIN STORM INLET ***Plumbing contractor stated streets would be cleaned before leaving the site after water service inspection. This was not done
Underslab Plumbing Inspection - Residential Passed 6/18/2025 6/18/2025 06/18/2025
Erosion Control Inspection Residential Partial 6/18/2025 6/18/2025 06/18/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
06/18/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -STREET CLEAN UP REQUIRED IMMEADIATELY. -POST ADDRESS -MAINTAIN GRAVEL DRIVE WITH MIN 3/4" GRAVEL IN MIN 6" LIFT -MAINTAIN STORM INLET ***Plumbing contractor stated streets would be cleaned before leaving the site after water service inspection. This was not done
All Rough Inspection - Residential Failed 7/21/2025 7/21/2025 07/21/2025
Misc
Corrective Action Required
07/21/2025
Inpsection for PFH, front porch and back deck roof only *PFH-seal penetrations in moisture barrier *Front porch-install 2x6 ceiling joists per plan *Back deck ceiling-ok to cover
Erosion Control Inspection Residential Failed 07/21/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
07/21/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -Restore silt fence at perimeter -Maintain gravel drive
Piers/Caissons Inspection - Residential Failed 8/18/2025 8/18/2025 08/18/2025
Misc
Corrective Action Required
08/18/2025
(5) 16x36 piers for "future pergola" -Update plans to show pergola framing and piers -Remove loose soil from piers -Remove standing water from piers
Erosion Control Inspection Residential Failed 08/18/2025
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
08/18/2025
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -Restore silt fence at perimeter -Maintain gravel drive
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/18/2025
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Maintain storm inlet -Clean debris from street -Maintain silt fence -Maintain gravel drive
Piers/Caissons Inspection - Residential Failed 8/21/2025 8/21/2025 08/21/2025
Misc
Corrective Action Required
08/18/2025
(5) 16x36 piers for "future pergola"
Electrical Service Inspection Passed 9/11/2025 9/11/2025 09/11/2025
Erosion Control Inspection Residential Failed 09/11/2025
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/18/2025
9/11/25 DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Maintain storm inlet -Provide erosion control methods
Gas Service Inspection - Residential Failed 9/11/2025 9/11/2025 09/11/2025
Misc
Corrective Action Required
09/11/2025
No pressure gauge located
All Rough Inspection - Residential Failed 9/11/2025 9/11/2025 09/11/2025
Misc
Corrective Action Required
07/21/2025
Erosion control must be in place before any further inspection -Provide security blocking at hinge and strike locations at garage man door -Tighten anchor bolts at garage -Install missing nut and washer at anchor bolts -All anchor bolts to be in middle third of plate (return panel by single car door) -Strap top plates lapped less than 24” both sides of beam at single car side -Fireblock soffit at garage fur out -Nail multi ply stud packs per code -Strap angle wall by stairs to back garage wall where not connected at top plates both sides -Provide joist hangers at 2x4 ceiling framing at mud room -Install missing nails at stud shoes at butler’s pantry -Seal top plate penetrations at great room exterior wall -provide engineered report for spliced hip rafter at master bath -Roof load landing on non bearing wall at master bath -Install joist hangers at joists cut for attic access at master bath toilet room -Install entry door -Fur down and fire block at dwv/pex lines office closet -Nail joists to rafters at office per code -Provide engineer report for roof framing landing on 4 blocks on LVL at second floor -Strap top plate lapped less than 24” at bed 3 -Complete lateral restraint of ceiling joists above load bearing walls at bed 3 bath -Ceiling joist over notched at bed 4 closet/open space -Block between joists above beam in powder room area -Plans show 2x6 wall by stairs -Exterior stairs and deck framing not completed at time of inspection
All Rough Inspection - Residential Passed 9/16/2025 9/16/2025 09/16/2025
Misc
Resolved
09/16/2025
Erosion control must be in place before any further inspection -Provide security blocking at hinge and strike locations at garage man door -Tighten anchor bolts at garage -Install missing nut and washer at anchor bolts -All anchor bolts to be in middle third of plate (return panel by single car door) -Strap top plates lapped less than 24” both sides of beam at single car side -Fireblock soffit at garage fur out -Nail multi ply stud packs per code -Strap angle wall by stairs to back garage wall where not connected at top plates both sides -Provide joist hangers at 2x4 ceiling framing at mud room -Install missing nails at stud shoes at butler’s pantry -Seal top plate penetrations at great room exterior wall -provide engineered report for spliced hip rafter at master bath -Roof load landing on non bearing wall at master bath -Install joist hangers at joists cut for attic access at master bath toilet room -Install entry door -Fur down and fire block at dwv/pex lines office closet -Nail joists to rafters at office per code -Provide engineer report for roof framing landing on 4 blocks on LVL at second floor -Strap top plate lapped less than 24” at bed 3 -Complete lateral restraint of ceiling joists above load bearing walls at bed 3 bath -Ceiling joist over notched at bed 4 closet/open space -Block between joists above beam in powder room area -Plans show 2x6 wall by stairs -Exterior stairs and deck framing not completed at time of inspection
Erosion Control Inspection Residential Passed 9/16/2025 9/16/2025 09/16/2025
DCM2 ESC DEFICIENT INSTALLATION
Resolved
09/16/2025
9/11/25 DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -Maintain storm inlet -Provide erosion control methods
Gas Service Inspection - Residential Passed 9/16/2025 9/16/2025 09/16/2025
Misc
Resolved
09/16/2025
No pressure gauge located
Sidewalk Inspection Partial 12/10/2025 12/10/2025 12/10/2025
Misc
Informational
12/10/2025
12/1025 Wednesday JMJ Driveway- forms and materials passed pre-inspection.
Driveway Inspection Partial 12/10/2025 12/10/2025 12/10/2025
Sidewalk Inspection Partial 12/11/2025
Misc
Informational
12/10/2025
12/10/25 Wednesday JMJ Sidewalk- forms and materials passed pre-inspection.
Driveway Inspection Partial 12/11/2025
Misc
Informational
12/11/2025
12/1025 Wednesday JMJ Driveway- forms and materials passed pre-inspection.
Miscellaneous Inspection Passed 1/14/2026 1/14/2026 01/14/2026
Erosion Control Inspection Residential Failed 01/21/2026
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/21/2026
1/21/26 EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -Provide ESC methods at perimeter, clean silt and debris from storm inlet, clean debris from street
Plot Plan Inspection Failed 3/2/2026 03/02/2026
Misc
Corrective Action Required
03/02/2026
- PROVIDE AS GRADED PLOT PLAN WITH POOL AND RETAINING WALL INCLUDED
Erosion Control Inspection Residential Failed 3/2/2026 03/02/2026
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/21/2026
1/21/26 EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -Provide ESC methods at perimeter, clean silt and debris from storm inlet, clean debris from street
Occupancy Inspection - Codes Residential Failed 3/2/2026 3/2/2026 03/02/2026
Misc
Corrective Action Required
03/02/2026
- Address fail piers for pergola - pending driveway and sidewalk inspection - Provide water Hamer device in laundry - Plumb tub in master bathroom - Open electrical in master bathroom - Pantry door to be self closing - GFCI protect kitchen island receptacles - Garage man door to be self closing and latch - Label non GFCI single receptacles throughout - Uncover all smoke detectors - GFCI protection needed at bar island in basement - Missing nails in joist suspected slab behind bar - Tighten and break off screw to anti-siphon device at main water shut off spigot - Provide secondary lock at exterior garage man door - Final grading and sod - Sump discharge to be 36” away from foundation - Provide splash pads at downspouts - Land sewer trace wire at grade - Raise water meter pit to grade and have meter 14-18” from lid
Sidewalk Inspection Passed 3/2/2026 3/2/2026 03/02/2026
Misc
Informational
12/11/2025
12/10/25 Wednesday JMJ Sidewalk- forms and materials passed pre-inspection.
Misc
Informational
03/02/2026
03/02/26 Monday JMJ Sidewalk - passed final inspection.
Driveway Inspection Failed 3/2/2026 3/2/2026 03/02/2026
Misc
Informational
12/11/2025
12/1025 Wednesday JMJ Driveway- forms and materials passed pre-inspection.
Misc
Informational
03/02/2026
03/02/26 Monday JMJ Driveway - final inspection failed due to curbs needing to be replaced or partially restored. Talked with contractor about why the driveway failed Mike (816) 309-3989.
Piers/Caissons Inspection - Residential Passed 03/03/2026
Misc
Resolved
03/03/2026
(5) 16x36 piers for "future pergola"
Footing Inspection - Residential Passed 03/03/2026
Misc
Resolved
03/03/2026
Okay to pour. Footing Footing failed until pier for deck has been installed and inspected
Occupancy Inspection - Codes Residential Ready for Temp CO 3/3/2026 3/3/2026 03/03/2026
Misc
Corrective Action Required
03/02/2026
- Final grading and sod - Sump discharge to be 36” away from foundation - Provide splash pads at downspouts - Land sewer trace wire at grade - Raise water meter pit to grade and have meter 14-18” from lid
Driveway Inspection Passed 3/9/2026 3/9/2026 03/24/2026
Misc
Informational
03/02/2026
12/1025 Wednesday JMJ Driveway- forms and materials passed pre-inspection.
Misc
Informational
03/02/2026
03/02/26 Monday JMJ Driveway - final inspection failed due to curbs needing to be replaced or partially restored. Talked with contractor about why the driveway failed Mike (816) 309-3989. 03/24/26 Tuesday JMJ Driveway/ Approach - passed Contractor has correct deficiencies of the curb with partial restoration.
Documents & Images
Date Uploaded File Type Document Name
04/24/2025 Permit Codes Residential Plan Review
04/29/2025 Application Form APPLICATION
04/29/2025 Approved Plans APPROVED PLANS
04/29/2025 Plot Plan APPROVED PLOT PLAN
04/29/2025 Permit Codes Residential Plan Review
05/05/2025 Permit DS Building Permit
05/05/2025 Receipt Receipt for transaction:2025-002835
05/05/2025 Application Form EXCISE TAX FORM
05/07/2025 3RD Party Insp Report THIRD PARTY FOOTING INSPECTION
05/08/2025 Letter INSPECTION SUMMARY
05/08/2025 Approved Plans 5-8-25 APPROVED PIER PLAN
05/08/2025 Letter INSPECTION SUMMARY
05/08/2025 3rd party inspection denied p1
05/08/2025 3rd party inspection denied p2
05/08/2025 3rd party inspection denied p3
05/08/2025 Engineer Report/Study 2090 O'Brien Pier Letter
05/16/2025 Letter INSPECTION SUMMARY
05/16/2025 Letter INSPECTION SUMMARY
05/26/2025 4415 Basement-Model
05/26/2025 Receipt Receipt for transaction:2025-003804
05/28/2025 Letter INSPECTION SUMMARY
05/29/2025 Letter INSPECTION SUMMARY
05/29/2025 Letter INSPECTION SUMMARY
06/18/2025 Letter INSPECTION SUMMARY
07/21/2025 Letter INSPECTION SUMMARY
07/21/2025 Letter INSPECTION SUMMARY
07/21/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
08/18/2025 Letter INSPECTION SUMMARY
08/21/2025 Letter INSPECTION SUMMARY
09/11/2025 Letter INSPECTION SUMMARY
09/11/2025 Letter INSPECTION SUMMARY
09/11/2025 Letter INSPECTION SUMMARY
09/11/2025 Letter INSPECTION SUMMARY
09/11/2025 3RD Party Insp Report woodside 152 stoop insp
09/12/2025 4415PERGLA (1)
09/12/2025 plot plan with added pergolla
09/12/2025 Plans APPROVED PERGOLA PLANS
09/12/2025 Plot Plan APPROVED PLOT PLAN
09/16/2025 Letter INSPECTION SUMMARY
09/16/2025 Letter INSPECTION SUMMARY
09/16/2025 Letter INSPECTION SUMMARY
10/06/2025 2090 nw Obrien M Bathroom Letter
10/06/2025 2090 nw Obrien Header Modification Letter
12/10/2025 Letter INSPECTION SUMMARY
12/10/2025 Letter INSPECTION SUMMARY
12/11/2025 Letter INSPECTION SUMMARY
12/11/2025 Letter INSPECTION SUMMARY
12/11/2025 Letter INSPECTION SUMMARY
12/11/2025 Letter INSPECTION SUMMARY
01/14/2026 Letter INSPECTION SUMMARY
01/21/2026 Letter INSPECTION SUMMARY
03/02/2026 Letter INSPECTION SUMMARY
03/02/2026 Letter INSPECTION SUMMARY
03/02/2026 Letter INSPECTION SUMMARY
03/02/2026 Letter INSPECTION SUMMARY
03/02/2026 Letter INSPECTION SUMMARY
03/02/2026 Letter INSPECTION SUMMARY
03/03/2026 Letter INSPECTION SUMMARY
03/03/2026 Letter INSPECTION SUMMARY
03/03/2026 Letter INSPECTION SUMMARY
03/04/2026 Certificate/License Codes Temporary Certificate of Occupancy
03/04/2026 Receipt Receipt for transaction:2026-001300
03/24/2026 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home