Permit Application Status

PRRES20245377


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20245377
Building Permit - Residential
Issued
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED PATIO
10/10/2024
10/29/2024
04/12/2025
Locations
Contacts
ELEVATE DESIGN & BUILD LLC, Address:350 SW LONGVIEW BLVD, Phone:(816) 622-8826  
Elevate Design + Build , Address:350 Longview Blvd.   
Bill Sehcrest, Address:350 SW Longview Blvd, Phone:(816) 786-8876  
Sara Ladd, Address:350 SW Longview Blvd, Phone:(816) 622-8826  
SARA@ELEVATEDESIGNBUILDKC.COM  
5 STAR HEATING & COOLING, Address:211 NW 12TH, Phone:(816) 517-3341  
ELECTRICAL CONNECTIONS, Address:20112 HOPS CREEK DR, Phone:(816) 838-6946  
S&B Plumbing, Inc., Address:PO Box 101, Phone:(913) 850-3445  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,285.00 $2,285.00 Paid 10/29/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 10/29/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 10/29/2024
8331401-Water Tap Fee $3,973.00 $3,973.00 Paid 10/29/2024
8350015-Water Meter Fee $748.03 $748.03 Paid 10/29/2024
9110078-Valuation Fee New Single Family $1,529.86 $1,529.86 Paid 10/29/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
Misc
Corrective Action Required
01/14/2025
Erosion control is in compliance
Piers/Caissons Inspection - Residential Pending
Misc
Corrective Action Required
02/25/2025
(2) 24”x36” piers. Plans do not specify any piers update plans to show piers
Footing Inspection - Residential Passed 11/1/2024 11/1/2024 11/01/2024
Misc
Informational
11/01/2024
- UFER on East wall, 6ft. North of south end
Erosion Control Inspection Residential Failed 11/1/2024 11/01/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
11/01/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. - POST ADDRESS - PROVIDE GRAVEL FILTER
Sewer Service Inspection - R Passed 11/21/2024 11/21/2024 11/21/2024
Water Service Inspection - R Passed 11/22/2024 11/22/2024 11/22/2024
Underslab Plumbing Inspection - Residential Passed 11/26/2024 11/26/2024 11/26/2024
Erosion Control Inspection Residential Partial 11/26/2024 11/26/2024
Misc
Corrective Action Required
11/01/2024
Erosion control is in compliance
All Rough Inspection - Residential Partial 12/23/2024 12/23/2024 12/23/2024
Misc
Informational
12/23/2024
Garage PFH and rear CS-PF nailing inspected only and okay to cover.
Erosion Control Inspection Residential Partial 12/23/2024
Misc
Corrective Action Required
11/26/2024
Erosion control is in compliance
Electrical Service Inspection Passed 1/14/2025 1/14/2025 01/14/2025
Gas Service Inspection - Residential Passed 1/14/2025 1/14/2025 01/14/2025
Erosion Control Inspection Residential Partial 1/14/2025 01/14/2025
Misc
Corrective Action Required
12/23/2024
Erosion control is in compliance
All Rough Inspection - Residential Failed 1/14/2025 1/14/2025 01/14/2025
Misc
Resolved
01/14/2025
Garage PFH and rear CS-PF nailing inspected only and okay to cover.
Miscellaneous Correction
Corrective Action Required
01/14/2025
Strap Ibeam in garage to outer wall for horizontal support Entry ridge needs a still leg installed Exterior wall of primary bathroom needs a strap and the 4 inch gap in the top plate to be filled Fill in top plate and strap top plate in primary bedroom above windows Restrap CS-PF windows in great room to include both top plates One nail missing in joist hanger in kitchen Ridge above bathroom 2 has a break in the ridge where it was butted up against each other ( need engineers report) Nail exterior corners of bedroom 2 to code Air supply line in furr down in basement rec room needs to be supported Vertically fire block exterior walls in basement at furr down Tape joint in air supply line in rec room Add ceiling sheet rock support in bedroom 3
All Rough Inspection - Residential Passed 1/17/2025 1/17/2025 01/17/2025
Miscellaneous Correction
Resolved
01/17/2025
Strap Ibeam in garage to outer wall for horizontal support Entry ridge needs a still leg installed Exterior wall of primary bathroom needs a strap and the 4 inch gap in the top plate to be filled Fill in top plate and strap top plate in primary bedroom above windows Restrap CS-PF windows in great room to include both top plates One nail missing in joist hanger in kitchen Ridge above bathroom 2 has a break in the ridge where it was butted up against each other ( need engineers report) Nail exterior corners of bedroom 2 to code Air supply line in furr down in basement rec room needs to be supported Vertically fire block exterior walls in basement at furr down Tape joint in air supply line in rec room Add ceiling sheet rock support in bedroom 3
Piers/Caissons Inspection - Residential Failed 2/25/2025 2/25/2025 02/25/2025
Misc
Corrective Action Required
02/25/2025
(2) 24”x36” piers. Plans do not specify any piers update plans to show piers
Driveway Inspection Partial 2/28/2025 2/28/2025 02/28/2025
Misc
Informational
02/28/2025
2-28-25 Dustin A, DW was formed and compacted. Informed super that expansion joint needed where approach meets curb and SW. Approved to pour
Sidewalk Inspection Partial 2/28/2025 2/28/2025 02/28/2025
Misc
Informational
02/28/2025
2-28-25 Dustin A, SW is formed and compacted, slopes are in compliance, Approved to pour
Driveway Inspection Passed 3/6/2025 3/6/2025 03/06/2025
Misc
Informational
02/28/2025
2-28-25 Dustin A, DW was formed and compacted. Informed super that expansion joint needed where approach meets curb and SW. Approved to pour 3-6-25 DP. DW was poured, forms have been removed. Cross slopes are in compliance. Passed.
Sidewalk Inspection Failed 3/6/2025 3/6/2025 03/06/2025
Misc
Informational
02/28/2025
2-28-25 Dustin A, SW is formed and compacted, slopes are in compliance, Approved to pour
Miscellaneous Correction
Corrective Action Required
03/06/2025
3-6-25 DP. Sidewalk was poured but was finished with picture frames. This area is a new subdivision without any picture frames. The sidewalk will need to be removed and repoured. In the general standard details section of the Lee's Summit Design and Construction manual, Page 2, line 8 under General Notes states, "Sidewalks and Shared used paths shall be full broom finished." Please call back in for a pre-pour inspection before pouring the new sidewalk. Thanks.
Sidewalk Inspection Partial 3/17/2025 3/17/2025 03/17/2025
Misc
Informational
03/06/2025
2-28-25 Dustin A, SW is formed and compacted, slopes are in compliance, Approved to pour
Miscellaneous Correction
Corrective Action Required
03/06/2025
3-6-25 DP. Sidewalk was poured but was finished with picture frames. This area is a new subdivision without any picture frames. The sidewalk will need to be removed and repoured. In the general standard details section of the Lee's Summit Design and Construction manual, Page 2, line 8 under General Notes states, "Sidewalks and Shared used paths shall be full broom finished." Please call back in for a pre-pour inspection before pouring the new sidewalk. Thanks. 3-17-25 Dustin A, Sw has been removed due to being not in spec. Has been reformed and compacted. Slopes are in compliance. Will need expansion joints along approach and curb . Approved to pour
Sidewalk Inspection Passed 3/24/2025 3/24/2025 03/24/2025
Misc
Informational
03/17/2025
2-28-25 Dustin A, SW is formed and compacted, slopes are in compliance, Approved to pour
Miscellaneous Correction
Corrective Action Required
03/17/2025
3-6-25 DP. Sidewalk was poured but was finished with picture frames. This area is a new subdivision without any picture frames. The sidewalk will need to be removed and repoured. In the general standard details section of the Lee's Summit Design and Construction manual, Page 2, line 8 under General Notes states, "Sidewalks and Shared used paths shall be full broom finished." Please call back in for a pre-pour inspection before pouring the new sidewalk. Thanks. 3-17-25 Dustin A, Sw has been removed due to being not in spec. Has been reformed and compacted. Slopes are in compliance. Will need expansion joints along approach and curb . Approved to pour 3-24-25 Dustin A, SW has been repoured to city spec. Pass
Plot Plan Inspection Passed 4/23/2025 04/23/2025
Documents & Images
Date Uploaded File Type Document Name
10/10/2024 Permit Application-24-10-10-HF206
10/10/2024 Tax_Application-24-10-10-HF206
10/14/2024 Permit Codes Residential Plan Review
10/14/2024 Permit Codes Residential Plan Review
10/14/2024 Plot Plan APPROVED PLOT PLAN
10/14/2024 Approved Plans APPROVED PLANS
10/14/2024 Permit Codes Residential Plan Review
10/14/2024 Permit Codes Residential Plan Review
10/29/2024 Permit DS Building Permit
10/29/2024 Permit DS Building Permit
10/29/2024 Receipt Receipt for transaction:2024-008646
11/01/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/21/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/22/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
12/23/2024 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/14/2025 Letter INSPECTION SUMMARY
01/15/2025 3RD Party Insp Report HF 206 Somerset~2222 SW Heartland Ct~Ridge Support
01/16/2025 Approved Plans APPROVED REVISED PLANS
01/17/2025 Letter INSPECTION SUMMARY
02/25/2025 Approved Plans APPROVED PLANS
02/28/2025 Letter INSPECTION SUMMARY
02/28/2025 Letter INSPECTION SUMMARY
02/28/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/06/2025 Letter INSPECTION SUMMARY
03/17/2025 Letter INSPECTION SUMMARY
03/24/2025 Letter INSPECTION SUMMARY
04/22/2025 206 Hook Farms As Graded Plot Plan
04/22/2025 Plot Plan APPROVED AS GRADED PLOT PLAN
04/23/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home