NZC HOMES LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT - COVERED DECK STOP WORK ORDER generated on 08/05/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 08/08/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER generated on 10/08/2024 12:00 AM by username 'Mitchell Schwarz'. STOP WORK ORDER removed on 10/18/2024 12:00 AM by username 'Shawn Hoffman'.
05/29/2024
06/20/2024
12/14/2024
Locations
Contacts
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
NZC HOMES LLC, Address:1009 INDUSTRIAL DR  
Dominick Zvacek, Address:1009 Industrial Drive, Phone:(816) 213-7204  
NZCONSTRUCTIONLLC@GMAIL.COM  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 06/20/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 06/20/2024
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 06/20/2024
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 06/20/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 06/20/2024
9110078-Valuation Fee New Single Family $1,688.49 $1,688.49 Paid 06/20/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Plot Plan Inspection Pending
Occupancy Inspection - Codes Residential Pending
Erosion Control Inspection Residential Pending
Misc
Corrective Action Required
03/26/2025
Erosion control in place at time of inspection
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/26/2025
3-14-25 Dustin A, Erosion control is down in several areas , curb lines need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 3-26-25 DP. Erosion control is compliant
Driveway Inspection Pending
Misc
Informational
04/04/2025
3-24-25 Dustin A, Dw is not formed . There is water standing in approach and will need to be removed. Will need a pre pour inspection called in before pouring. 3-25-25 DP. Inadequate aggregate depth. Needs to be 4" of aggregate. NOT approved to pour. Please call back in for a pre pour inspection once fixed. 3-26-25 DP. DW is formed, aggregate compacted. Approved to pour 4-4-25 Dustin A, dw has been poured , right side of the approach is non ada compliant @ 2.5 %
Sidewalk Inspection Pending
Misc
Corrective Action Required
05/13/2025
3-26-25 DP. Before approving any sidewalk inspections locate the water meter. We found the lid and part of the pit in line of where the sidewalk goes. If this is true, builder needs to call plumber and relocate pit and meter further into yard. 3-31-25 DP. SW on east side of house, south side of house and east side of DW are formed, aggregate compacted, cross slopes are in compliance but conditions can change. Approved to pour. Instead of tying into the ADA ramp that needs replaced, I'm having them install a header 5' back from both turn around panels so when they go to pour the ada ramp at a different time, there will be a full panel where they can add their expansion joint at property line. West side of DW still not formed. 4-4-25 Dustin A Sw has not been completed , will need another pre pour inspection. 4-10-25 Dustin A, ada ramp that has to be replaced has not been pulled. cannot pour until ada ramp is formed and pre pour inspection is performed. 4-11-25 Dustin A, Sw on right side of approach is formed and compacted. Several sections are not in compliance ( over 2% ) and the existing section they are attaching to is cracked and has been patched not to city standards. , They will need to fix slopes and cut out cracked\patched section. Fail 4-11-25 Dustin A, section of sidewalk on right side of approach has been fixed, Apprved to pour. Still need to remove ada in the rear of lot and replace. Will need a prepour on that, 5-13-25 Dustin A, ADA ramp has been corrected. Water valves will need to be cut to grade before final
Footing Inspection - Residential Passed 6/25/2024 06/25/2024
Sewer Service Inspection - R Passed 7/31/2024 07/31/2024
Underslab Plumbing Inspection - Residential Failed 8/1/2024 08/01/2024
Misc
Corrective Action Required
08/01/2024
Inspection denied -No address
Erosion Control Inspection Residential Failed 8/1/2024 8/1/2024 08/01/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/01/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -POST ADDRESS -MAINTAIN SILT FENCE -MAINTAIN OVERGROWN VEGETATION
Water Service Inspection - R Passed 8/2/2024 08/02/2024
Erosion Control Inspection Residential Failed - Stop Work 08/05/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/01/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -POST ADDRESS -MAINTAIN SILT FENCE -MAINTAIN OVERGROWN VEGETATION Not in compliance 8/5/24
Erosion Control Inspection Residential Failed 8/7/2024 08/07/2024
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
08/05/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -POST ADDRESS -MAINTAIN SILT FENCE -MAINTAIN OVERGROWN VEGETATION Not in compliance 8/5/24 Not in compliance 8/7/24
Erosion Control Inspection Residential Partial 8/8/2024 08/08/2024
DCM2 ESC DEFICIENT INSTALLATION
Resolved
08/08/2024
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -POST ADDRESS -MAINTAIN SILT FENCE -MAINTAIN OVERGROWN VEGETATION Not in compliance 8/5/24 Not in compliance 8/7/24
Misc
Informational
08/08/2024
Erosion control in compliance at time of inspection
Underslab Plumbing Inspection - Residential Passed 8/12/2024 08/12/2024
Misc
Resolved
08/12/2024
Inspection denied -No address
Piers/Caissons Inspection - Residential Passed 8/19/2024 8/19/2024 08/19/2024
Erosion Control Inspection Residential Failed 10/4/2024 10/4/2024 10/04/2024
Misc
Resolved
10/04/2024
Erosion control in compliance at time of inspection
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/04/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/04/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -clean street -maintain overgrown vegetation
Erosion Control Inspection Residential Failed - Stop Work 10/8/2024 10/8/2024 10/08/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
10/04/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/04/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -clean street -maintain overgrown vegetation Erosion control still not in compliance. STOP WORK ISSUED-Mitchell Schwarz 10/8/24
Erosion Control Inspection Residential Failed 10/18/2024 10/18/2024 10/18/2024
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
10/18/2024
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
DCM3 ESC REQUIRED 2 DAY
Resolved
10/18/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. -clean street -maintain overgrown vegetation Erosion control still not in compliance. STOP WORK ISSUED-Mitchell Schwarz 10/8/24
Misc
Corrective Action Required
10/18/2024
- REMOVE TRASH AND DEBRIS FROM LOT.
Erosion Control Inspection Residential Failed 10/24/2024 10/24/2024 10/24/2024
Misc
Corrective Action Required
10/18/2024
-repair down silt fence
Erosion Control Inspection Residential Partial 11/1/2024 11/1/2024 11/01/2024
Misc
Resolved
11/01/2024
-repair down silt fence
Erosion Control Inspection Residential Partial 11/5/2024 11/05/2024
Misc
Corrective Action Required
11/05/2024
Erosion control in place at time of inspection
All Rough Inspection - Residential Failed 11/5/2024 11/5/2024 11/05/2024
Misc
Corrective Action Required
11/05/2024
INSPECTION DENIED NOT READY NOT A FULL SET OF CITY STAMPED PLANS also schedule gas and electric with all rough
Erosion Control Inspection Residential Partial 11/12/2024 11/12/2024
Misc
Corrective Action Required
11/05/2024
Erosion control in place at time of inspection
All Rough Inspection - Residential Failed 11/12/2024 11/12/2024 11/12/2024
Misc
Resolved
11/12/2024
INSPECTION DENIED NOT READY NOT A FULL SET OF CITY STAMPED PLANS also schedule gas and electric with all rough
Misc
Corrective Action Required
11/12/2024
- unable to verify nail pattern on portal fram covered - Protect electrical garage/ foyer - Anchor bolt required within 12” of plate breaks/ single garage - Add stud under triple 18” LVL at stairs and owner entry and nail off stud pack - Missing nails at double joists above main floor sliding door right side - No support under valley rafter low side at dining/ great return wall - Support ridge over master bathroom and provide collor ties - Fire block vertically every 10’ at basement stairs wall - Provide joist hangers basement at stairs - Solid block cantilever at basement - Flex vent ductwork to be 4” at basement bathroom, 3” not allowed - Provide anchor bolts with in 12” of plate breaks at basement unfinished by bedroom 4 (2) locations - Tighten anchor bolts in basement
Erosion Control Inspection Residential Partial 11/26/2024 11/26/2024
Misc
Corrective Action Required
11/12/2024
Erosion control in place at time of inspection
All Rough Inspection - Residential Failed 11/26/2024 11/26/2024 11/26/2024
Misc
Corrective Action Required
11/12/2024
- unable to verify nail pattern on portal fram covered - Anchor bolt required within 12” of plate breaks/ single garage - Add stud under triple 18” LVL at stairs and owner entry and nail off stud pack **Nail 16d@24” oc or equivalent - No support under valley rafter low side at dining/ great return wall **Not done - Support ridge over master bathroom and provide collor ties **Provide collar ties at 4 ft oc near upper ridge - Fire block vertically every 10’ at basement stairs wall **Not done -Addenum: Fb master bedroom, laundry, and front bedroom walls from attic - Provide joist hangers basement at stairs **Not done at (3)2x10 connection near upper landing - Provide anchor bolts with in 12” of plate breaks at basement unfinished by bedroom 4 (2) locations **Not done **DO NOT INSULATE
All Rough Inspection - Residential Failed 12/6/2024 12/6/2024 12/06/2024
Misc
Corrective Action Required
11/26/2024
- unable to verify nail pattern on portal fram covered - Add stud under triple 18” LVL at stairs and owner entry and nail off stud pack **Nail 16d@24” oc or equivalent - No support under valley rafter low side at dining/ great return wall **Not done - Fire block vertically every 10’ at basement stairs wall **Not done **DO NOT INSULATE
All Rough Inspection - Residential Failed 12/12/2024 12/12/2024
Misc
Corrective Action Required
12/06/2024
- Add stud under triple 18” LVL at stairs and owner entry and nail off stud pack **Nail 16d@24” oc or equivalent(missing nails) - No support under valley rafter low side at dining/ great return wall (provide engineering for supplied support) **DO NOT INSULATE
Erosion Control Inspection Residential Partial 12/16/2024 12/16/2024
Misc
Corrective Action Required
11/26/2024
Erosion control in place at time of inspection
All Rough Inspection - Residential Passed 12/16/2024 12/16/2024
Misc
Resolved
12/16/2024
- Add stud under triple 18” LVL at stairs and owner entry and nail off stud pack **Nail 16d@24” oc or equivalent(missing nails) - No support under valley rafter low side at dining/ great return wall (provide engineering for supplied support) **DO NOT INSULATE
Electrical Service Inspection Passed 12/16/2024 12/16/2024
Gas Service Inspection - Residential Passed 12/16/2024 12/16/2024
Erosion Control Inspection Residential Failed 3/14/2025 3/14/2025 03/14/2025
Misc
Corrective Action Required
12/16/2024
Erosion control in place at time of inspection
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/14/2025
3-14-25 Dustin A, Erosion control is down in several areas , curb lines need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS.
Driveway Inspection Failed 3/24/2025 3/24/2025 03/24/2025
Misc
Informational
03/24/2025
3-24-25 Dustin A, Dw is not formed . There is water standing in approach and will need to be removed. Will need a pre pour inspection called in before pouring.
Driveway Inspection Failed 3/25/2025 3/25/2025 03/25/2025
Misc
Informational
03/24/2025
3-24-25 Dustin A, Dw is not formed . There is water standing in approach and will need to be removed. Will need a pre pour inspection called in before pouring. 3-25-25 DP. Inadequate aggregate depth. Needs to be 4" of aggregate. NOT approved to pour. Please call back in for a pre pour inspection once fixed.
Driveway Inspection Partial 3/26/2025 3/26/2025 03/26/2025
Misc
Informational
03/25/2025
3-24-25 Dustin A, Dw is not formed . There is water standing in approach and will need to be removed. Will need a pre pour inspection called in before pouring. 3-25-25 DP. Inadequate aggregate depth. Needs to be 4" of aggregate. NOT approved to pour. Please call back in for a pre pour inspection once fixed. 3-26-25 DP. DW is formed, aggregate compacted. Approved to pour
Erosion Control Inspection Residential Partial 3/26/2025 3/26/2025 03/26/2025
Misc
Corrective Action Required
03/14/2025
Erosion control in place at time of inspection
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
03/14/2025
3-14-25 Dustin A, Erosion control is down in several areas , curb lines need to be cleaned. EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. 3-26-25 DP. Erosion control is compliant
Sidewalk Inspection Partial 3/26/2025 3/26/2025 03/26/2025
Misc
Corrective Action Required
03/26/2025
3-26-25 DP. Before approving any sidewalk inspections locate the water meter. We found the lid and part of the pit in line of where the sidewalk goes. If this is true, builder needs to call plumber and relocate pit and meter further into yard.
Sidewalk Inspection Partial 3/31/2025 3/31/2025 03/31/2025
Misc
Corrective Action Required
03/26/2025
3-26-25 DP. Before approving any sidewalk inspections locate the water meter. We found the lid and part of the pit in line of where the sidewalk goes. If this is true, builder needs to call plumber and relocate pit and meter further into yard. 3-31-25 DP. SW on east side of house, south side of house and east side of DW are formed, aggregate compacted, cross slopes are in compliance but conditions can change. Approved to pour. Instead of tying into the ADA ramp that needs replaced, I'm having them install a header 5' back from both turn around panels so when they go to pour the ada ramp at a different time, there will be a full panel where they can add their expansion joint at property line. West side of DW still not formed.
Sidewalk Inspection Partial 04/04/2025
Misc
Corrective Action Required
03/31/2025
3-26-25 DP. Before approving any sidewalk inspections locate the water meter. We found the lid and part of the pit in line of where the sidewalk goes. If this is true, builder needs to call plumber and relocate pit and meter further into yard. 3-31-25 DP. SW on east side of house, south side of house and east side of DW are formed, aggregate compacted, cross slopes are in compliance but conditions can change. Approved to pour. Instead of tying into the ADA ramp that needs replaced, I'm having them install a header 5' back from both turn around panels so when they go to pour the ada ramp at a different time, there will be a full panel where they can add their expansion joint at property line. West side of DW still not formed. 4-4-25 Dustin A Sw has not been completed , will need another pre pour inspection.
Driveway Inspection Failed 4/4/2025 4/4/2025 04/04/2025
Misc
Informational
03/26/2025
3-24-25 Dustin A, Dw is not formed . There is water standing in approach and will need to be removed. Will need a pre pour inspection called in before pouring. 3-25-25 DP. Inadequate aggregate depth. Needs to be 4" of aggregate. NOT approved to pour. Please call back in for a pre pour inspection once fixed. 3-26-25 DP. DW is formed, aggregate compacted. Approved to pour 4-4-25 Dustin A, dw has been poured , right side of the approach is non ada compliant @ 2.5 %
Driveway Inspection Failed 04/04/2025
Misc
Informational
04/04/2025
3-24-25 Dustin A, Dw is not formed . There is water standing in approach and will need to be removed. Will need a pre pour inspection called in before pouring. 3-25-25 DP. Inadequate aggregate depth. Needs to be 4" of aggregate. NOT approved to pour. Please call back in for a pre pour inspection once fixed. 3-26-25 DP. DW is formed, aggregate compacted. Approved to pour 4-4-25 Dustin A, dw has been poured , right side of the approach is non ada compliant @ 2.5 %
Sidewalk Inspection Failed 4/10/2025 4/10/2025 04/10/2025
Misc
Corrective Action Required
04/04/2025
3-26-25 DP. Before approving any sidewalk inspections locate the water meter. We found the lid and part of the pit in line of where the sidewalk goes. If this is true, builder needs to call plumber and relocate pit and meter further into yard. 3-31-25 DP. SW on east side of house, south side of house and east side of DW are formed, aggregate compacted, cross slopes are in compliance but conditions can change. Approved to pour. Instead of tying into the ADA ramp that needs replaced, I'm having them install a header 5' back from both turn around panels so when they go to pour the ada ramp at a different time, there will be a full panel where they can add their expansion joint at property line. West side of DW still not formed. 4-4-25 Dustin A Sw has not been completed , will need another pre pour inspection. 4-10-25 Dustin A, ada ramp that has to be replaced has not been pulled. cannot pour until ada ramp is formed and pre pour inspection is performed.
Sidewalk Inspection Failed 4/11/2025 4/11/2025 04/11/2025
Misc
Corrective Action Required
04/10/2025
3-26-25 DP. Before approving any sidewalk inspections locate the water meter. We found the lid and part of the pit in line of where the sidewalk goes. If this is true, builder needs to call plumber and relocate pit and meter further into yard. 3-31-25 DP. SW on east side of house, south side of house and east side of DW are formed, aggregate compacted, cross slopes are in compliance but conditions can change. Approved to pour. Instead of tying into the ADA ramp that needs replaced, I'm having them install a header 5' back from both turn around panels so when they go to pour the ada ramp at a different time, there will be a full panel where they can add their expansion joint at property line. West side of DW still not formed. 4-4-25 Dustin A Sw has not been completed , will need another pre pour inspection. 4-10-25 Dustin A, ada ramp that has to be replaced has not been pulled. cannot pour until ada ramp is formed and pre pour inspection is performed. 4-11-25 Dustin A, Sw on right side of approach is formed and compacted. Several sections are not in compliance ( over 2% ) and the existing section they are attaching to is cracked and has been patched not to city standards. , They will need to fix slopes and cut out cracked\patched section. Fail
Sidewalk Inspection Partial 4/11/2025 4/11/2025 04/11/2025
Misc
Corrective Action Required
04/11/2025
3-26-25 DP. Before approving any sidewalk inspections locate the water meter. We found the lid and part of the pit in line of where the sidewalk goes. If this is true, builder needs to call plumber and relocate pit and meter further into yard. 3-31-25 DP. SW on east side of house, south side of house and east side of DW are formed, aggregate compacted, cross slopes are in compliance but conditions can change. Approved to pour. Instead of tying into the ADA ramp that needs replaced, I'm having them install a header 5' back from both turn around panels so when they go to pour the ada ramp at a different time, there will be a full panel where they can add their expansion joint at property line. West side of DW still not formed. 4-4-25 Dustin A Sw has not been completed , will need another pre pour inspection. 4-10-25 Dustin A, ada ramp that has to be replaced has not been pulled. cannot pour until ada ramp is formed and pre pour inspection is performed. 4-11-25 Dustin A, Sw on right side of approach is formed and compacted. Several sections are not in compliance ( over 2% ) and the existing section they are attaching to is cracked and has been patched not to city standards. , They will need to fix slopes and cut out cracked\patched section. Fail 4-11-25 Dustin A, section of sidewalk on right side of approach has been fixed, Apprved to pour. Still need to remove ada in the rear of lot and replace. Will need a prepour on that,
Sidewalk Inspection Partial 4/18/2025 4/18/2025 04/18/2025
Misc
Corrective Action Required
04/11/2025
3-26-25 DP. Before approving any sidewalk inspections locate the water meter. We found the lid and part of the pit in line of where the sidewalk goes. If this is true, builder needs to call plumber and relocate pit and meter further into yard. 3-31-25 DP. SW on east side of house, south side of house and east side of DW are formed, aggregate compacted, cross slopes are in compliance but conditions can change. Approved to pour. Instead of tying into the ADA ramp that needs replaced, I'm having them install a header 5' back from both turn around panels so when they go to pour the ada ramp at a different time, there will be a full panel where they can add their expansion joint at property line. West side of DW still not formed. 4-4-25 Dustin A Sw has not been completed , will need another pre pour inspection. 4-10-25 Dustin A, ada ramp that has to be replaced has not been pulled. cannot pour until ada ramp is formed and pre pour inspection is performed. 4-11-25 Dustin A, Sw on right side of approach is formed and compacted. Several sections are not in compliance ( over 2% ) and the existing section they are attaching to is cracked and has been patched not to city standards. , They will need to fix slopes and cut out cracked\patched section. Fail 4-11-25 Dustin A, section of sidewalk on right side of approach has been fixed, Apprved to pour. Still need to remove ada in the rear of lot and replace. Will need a prepour on that,
Sidewalk Inspection Partial 05/13/2025
Misc
Corrective Action Required
04/18/2025
3-26-25 DP. Before approving any sidewalk inspections locate the water meter. We found the lid and part of the pit in line of where the sidewalk goes. If this is true, builder needs to call plumber and relocate pit and meter further into yard. 3-31-25 DP. SW on east side of house, south side of house and east side of DW are formed, aggregate compacted, cross slopes are in compliance but conditions can change. Approved to pour. Instead of tying into the ADA ramp that needs replaced, I'm having them install a header 5' back from both turn around panels so when they go to pour the ada ramp at a different time, there will be a full panel where they can add their expansion joint at property line. West side of DW still not formed. 4-4-25 Dustin A Sw has not been completed , will need another pre pour inspection. 4-10-25 Dustin A, ada ramp that has to be replaced has not been pulled. cannot pour until ada ramp is formed and pre pour inspection is performed. 4-11-25 Dustin A, Sw on right side of approach is formed and compacted. Several sections are not in compliance ( over 2% ) and the existing section they are attaching to is cracked and has been patched not to city standards. , They will need to fix slopes and cut out cracked\patched section. Fail 4-11-25 Dustin A, section of sidewalk on right side of approach has been fixed, Apprved to pour. Still need to remove ada in the rear of lot and replace. Will need a prepour on that, 5-13-25 Dustin A, ADA ramp has been corrected. Water valves will need to be cut to grade before final
Documents & Images
Date Uploaded File Type Document Name
05/29/2024 Lot 84 2024-05-20
06/05/2024 License_Tax_Application
06/05/2024 Residental Permit Application_1
06/06/2024 Permit Codes Residential Plan Review
06/17/2024 Approved Plans APPROVED PLANS
06/17/2024 Permit Codes Residential Plan Review
06/19/2024 Permit Codes Residential Plan Review
06/19/2024 Plot Plan APPROVED PLOT PLAN
06/20/2024 Permit DS Building Permit
06/20/2024 Receipt Receipt for transaction: 2024-004963
06/22/2024 M L Crose 2303 SW Serena Pl LSMO Summit View Farms Lot 84 3rd Party Footing Inspection Report 6-21-24
06/25/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/01/2024 Letter INSPECTION SUMMARY
08/02/2024 Letter INSPECTION SUMMARY
08/05/2024 Letter Stop Work Order
08/07/2024 Letter INSPECTION SUMMARY
08/08/2024 Letter INSPECTION SUMMARY
08/12/2024 Letter INSPECTION SUMMARY
08/19/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/08/2024 Letter Stop Work Order
10/18/2024 Letter INSPECTION SUMMARY
10/24/2024 Letter INSPECTION SUMMARY
11/01/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/05/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/12/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
11/26/2024 Letter INSPECTION SUMMARY
12/06/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
12/16/2024 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/14/2025 Letter INSPECTION SUMMARY
03/24/2025 Letter INSPECTION SUMMARY
03/24/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/04/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/10/2025 Letter INSPECTION SUMMARY
04/11/2025 Letter INSPECTION SUMMARY
04/11/2025 Letter INSPECTION SUMMARY
04/11/2025 Letter INSPECTION SUMMARY
04/18/2025 Letter INSPECTION SUMMARY
05/13/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home