Summary
PRRES20242360
Building Permit - Residential
Temporary Occupancy
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. COVERED DECK.
05/10/2024
05/24/2024
11/13/2024
Locations
Contacts
BELLAH HOMES LLC, Address:P O BOX 346, Phone:(816) 697-2870  
Paul Miller, Address:P.O. Box 346, Phone:(816) 786-5050  
AFC HEATING AND COOLING, Address:824 NW MAIN ST , Phone:(816) 347-8388  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
PAUL@BELLAHHOMES.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 05/24/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 05/24/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 05/24/2024
9110078-Valuation Fee New Single Family $2,185.19 $2,185.19 Paid 05/24/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 04/25/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Codes Residential Pending
Misc
Corrective Action Required
04/25/2025
-As-graded plot plan is required. Provide a swale along the rear of the lot **Provide erosion control around storm inlet -Provide sewer tracer wire port at grade **where is the sewer shutoff valve access and tracer port? -Attach deck beam to each post with two 1/2” through bolts/washers/nuts or equivalent connections **I don’t see the two through carriage bolts, especially at the south post. Verification is required
Footing Inspection - Residential Passed 06/12/2024
Informational
06/12/2024
FOOTING APPROVED BY ENGINEER
Erosion Control Inspection Residential Partial 6/12/2024 06/12/2024
Misc
Informational
06/12/2024
Erosion control installed
Underslab Plumbing Inspection - Residential Passed 6/12/2024 6/12/2024 06/12/2024
Erosion Control Inspection Residential Partial 7/22/2024 07/22/2024
Misc
Informational
06/12/2024
Erosion control installed
Sewer Service Inspection - R Passed 7/22/2024 07/22/2024
Electrical Service Inspection Passed 9/20/2024 9/20/2024 09/20/2024
Gas Service Inspection - Residential Passed 9/20/2024 9/20/2024 09/20/2024
All Rough Inspection - Residential Failed 9/20/2024 9/20/2024 09/20/2024
Misc
Corrective Action Required
09/20/2024
**Restore erosion control along rear lot -Nail seams at garage PFH wall @3” oc; strap adjacent to opening -Toe nail joists to wall top plates (4-8d) -Solid block ends of double joists supporting knee wall above garage -Fb garage duct/plumbing chase from horizontal space; fb chase in laundry from joist space -Nail corner studs 16d@12” oc or equivalent nailing -Fasten fireplace to framing -Fb fireplace space from roof space -Nail siding to studs at step flashings -Shim gaps between rafters and bearing wall above laundry -Provide cantilevered joist/deck framing per plan 2/S3.3. Install Simpson LS90 first, then solid blocking after I verify; install H2.5 per detail; providers screw for ledger @ 16”, double every other; provide two 1/2” through bolts at beam-post connections -Support double header joist above furnace switch at both ends -Block rim-parallel joists @ 4 ft interval -Siding nails missing the sill plates at north wall -Tighten SE cable connector above main service panel -Protect wiring running across bottom of joists **DO NOT INSULATE
Erosion Control Inspection Residential Failed 9/20/2024 9/20/2024 09/20/2024
Misc
Corrective Action Required
09/20/2024
**Restore erosion control along rear lot
All Rough Inspection - Residential Failed 9/25/2024 9/25/2024 09/25/2024
Misc
Corrective Action Required
09/20/2024
**Restore erosion control along rear lot -Nail siding to studs at step flashings **Exterior wall of middle bedroom **OK TO INSULATE
All Rough Inspection - Residential Passed 9/27/2024 9/27/2024 09/27/2024
Misc
Resolved
09/27/2024
**Restore erosion control along rear lot -Nail siding to studs at step flashings **Exterior wall of middle bedroom **OK TO INSULATE
Driveway Inspection Partial 2/3/2025 2/3/2025 02/03/2025
Misc
Informational
02/03/2025
2-2-25 NS site visited and it appears driveway meets city’s standards for pre-pour
Erosion Control Inspection Residential Passed 03/25/2025
Misc
Resolved
03/25/2025
**Restore erosion control along rear lot
Occupancy Inspection - Codes Residential Failed 3/25/2025 3/25/2025 03/25/2025
Misc
Corrective Action Required
03/25/2025
-Driveway not approved -Deck piers not approved by city -As-graded plot plan is required. Provide a swale along the rear of the lot -Min 36” downspout extension from wall. Same for sump pump extension. -Seal above meter, seal exterior lights, etc -Provide sewer tracer wire port at grade -Secure ENT raceway within 3 ft of grinder pump controller -Attach deck beam to each post with two 1/2” through bolts/washers/nuts or equivalent connections -Stair handrail shall be continuous and uninterrupted for straight stair flight -Tighten down the ufer grounding clamp set screw -Service panel cover missing two screws -Remove foundation wall metal ties -Fb floor penetration underneath master tub
Driveway Inspection Passed 3/26/2025 3/26/2025 03/26/2025
Misc
Informational
02/03/2025
2-2-25 NS site visited and it appears driveway meets city’s standards for pre-pour 3-26-25 NS site visited and it appears driveway meets city standards. No sidewalk. Passed
Plot Plan Inspection Passed 4/25/2025 04/25/2025
Occupancy Inspection - Codes Residential Failed 4/25/2025 4/25/2025 04/25/2025
Misc
Corrective Action Required
03/25/2025
-As-graded plot plan is required. Provide a swale along the rear of the lot **Provide erosion control around storm inlet -Provide sewer tracer wire port at grade **where is the sewer shutoff valve access and tracer port? -Attach deck beam to each post with two 1/2” through bolts/washers/nuts or equivalent connections **I don’t see the two through carriage bolts, especially at the south post
Occupancy Inspection - Codes Residential Ready for Temp CO 04/25/2025
Misc
Corrective Action Required
04/25/2025
-As-graded plot plan is required. Provide a swale along the rear of the lot **Provide erosion control around storm inlet -Provide sewer tracer wire port at grade **where is the sewer shutoff valve access and tracer port? -Attach deck beam to each post with two 1/2” through bolts/washers/nuts or equivalent connections **I don’t see the two through carriage bolts, especially at the south post. Verification is required
Documents & Images
Date Uploaded File Type Document Name
05/10/2024 Lot 25 Permit Application
05/10/2024 Lot 25 Tax Excise Application
05/17/2024 Permit Codes Residential Plan Review
05/17/2024 Approved Plans APPROVED PLANS
05/21/2024 Plot Plan APPROVED PLOT PLAN
05/21/2024 Permit Codes Residential Plan Review
05/24/2024 Permit DS Building Permit
05/24/2024 Receipt Receipt for transaction: 2024-003961
05/30/2024 3RD Party Insp Report 3rd Party Footing Inspection Report 5-22-24
05/31/2024 M L Crose 1812 NE Lashbrook Cir LSMO Woodland Oaks Lot 25 Bellah Homes P 2024-2360 3rd Party Footing Inspection Report Revised 5-31-24
06/12/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter INSPECTION SUMMARY
06/12/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
07/22/2024 Letter INSPECTION SUMMARY
09/20/2024 Letter INSPECTION SUMMARY
09/20/2024 Letter INSPECTION SUMMARY
09/20/2024 Letter INSPECTION SUMMARY
09/20/2024 Letter INSPECTION SUMMARY
09/25/2024 Letter INSPECTION SUMMARY
09/27/2024 Letter INSPECTION SUMMARY
02/03/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/25/2025 Letter INSPECTION SUMMARY
03/26/2025 Letter INSPECTION SUMMARY
04/24/2025 Plot Plan APPROVED AS BUILT PLOT PLAN
04/25/2025 Letter INSPECTION SUMMARY
04/25/2025 Letter INSPECTION SUMMARY
04/25/2025 Letter INSPECTION SUMMARY
04/25/2025 Certificate/License Codes Temporary Certificate of Occupancy
04/25/2025 Receipt Receipt for transaction:2025-002615
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home