Permit Application Status

PRRES20241833


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20241833
Building Permit - Residential
Temporary Occupancy
NEW SINGLE FAMILY
NEW HOUSE. FINISHED/UNFINISHED BASEMENT. WALKOUT BASEMENT. COVERED DECK.
04/15/2024
05/01/2024
10/16/2024
Locations
Contacts
NEW MARK HOMES - KC LLC, Address:5207 NW CROOKED ROAD, Phone:(816) 969-9010  
Ashley Kirby, Address:5207 NW Crooked Rd, Phone:(816) 969-9010  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
R & R PLUMBING INC, Address:2001 GASLIGHT DR, Phone:(816) 772-5431  
whitney@newmarkhomeskc.com  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,760.00 $3,760.00 Paid 05/01/2024
8350015-Water Meter Fee $680.46 $680.46 Paid 05/01/2024
8331507-Sanitary Sewer Development Fee $2,159.00 $2,159.00 Paid 05/01/2024
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 05/01/2024
7232302-Residential License Tax Fee $1,022.72 $1,022.72 Paid 05/01/2024
9110078-Valuation Fee New Single Family $1,758.46 $1,758.46 Paid 05/01/2024
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 01/15/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 03/04/2025
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 04/08/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Pending
Occupancy Inspection - Codes Residential Pending
Miscellaneous Correction
Corrective Action Required
03/05/2025
-sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover covered water meter for inspection -identify sewer tracer wire and land in locator box -address pending driveway and sidewalk inspection -obtain issued lawn irrigation permit Passed for TCO only
Footing Inspection - Residential Passed 5/15/2024 5/15/2024 05/15/2024
Underslab Plumbing Inspection - Residential Passed 6/6/2024 6/6/2024 06/06/2024
Erosion Control Inspection Residential Failed 7/11/2024 07/11/2024
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
07/11/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. MAINTAIN OVERGROWN VEGETATION
Erosion Control Inspection Residential Partial 7/18/2024 07/18/2024
DCM3 ESC REQUIRED 2 DAY
Resolved
07/18/2024
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. MAINTAIN OVERGROWN VEGETATION
Partial Correction
07/18/2024
Erosion control was inn compliance at the time of inspection.
All Rough Inspection - Residential Failed 7/18/2024 7/18/2024 07/18/2024
Misc
Corrective Action Required
07/18/2024
-Front porch roof framing not ready
Misc
Informational
07/18/2024
Garage portal, cs-pf nailing at owners suite, covered deck roof framing PASSED
Sewer Service Inspection - R Passed 8/6/2024 8/6/2024 08/06/2024
Water Service Inspection - R Passed 8/9/2024 08/09/2024
All Rough Inspection - Residential Passed 10/4/2024 10/4/2024 10/04/2024
Misc
Resolved
10/04/2024
-Front porch roof framing not ready
Misc
Resolved
10/04/2024
Garage portal, cs-pf nailing at owners suite, covered deck roof framing PASSED
Misc
Corrective Action Required
10/04/2024
-anchor bolts to be within 12” of plate ends (not closer than 7x the diameter of the bolt) -fireblock laundry wall to ceiling space -seal penetration in top plate at laundry -fireblock E kitchen wall to ceiling space -fireblock dining room cantilever wall space to ceiling space -fireblock owners bath E wall to ceiling space -fire block owners bath/closet wall to ceiling space -add studs where missing rear rec room wall -minimum 3 studs at all exterior wall corners. Check throughout -add supports for furr down to floor joist above in basement bed 4 -add fire blocking every 10’ see basement W wall -seal penetrations in fire blocking and top plate in bed 4 closet -nail exterior sheathing to plans
Electrical Service Inspection Passed 10/4/2024 10/4/2024 10/04/2024
Gas Service Inspection - Residential Passed 10/4/2024 10/4/2024 10/04/2024
All Rough Inspection - Residential Failed 10/4/2024 10/4/2024 10/04/2024
Misc
Corrective Action Required
10/04/2024
-anchor bolts to be within 12” of plate ends (not closer than 7x the diameter of the bolt) -fireblock laundry wall to ceiling space -seal penetration in top plate at laundry -fireblock E kitchen wall to ceiling space -fireblock dining room cantilever wall space to ceiling space -fireblock owners bath E wall to ceiling space -fire block owners bath/closet wall to ceiling space -add studs where missing rear rec room wall -minimum 3 studs at all exterior wall corners. Check throughout -add supports for furr down to floor joist above in basement bed 4 -add fire blocking every 10’ see basement W wall -seal penetrations in fire blocking and top plate in bed 4 closet -nail exterior sheathing to plans
All Rough Inspection - Residential Failed 10/8/2024 10/8/2024 10/08/2024
Misc
Corrective Action Required
10/04/2024
-fireblock E kitchen wall to ceiling space at pantry -minimum 3 studs at all exterior wall corners. Check throughout -add fire blocking every 10’ see basement W wall(must be of approved fire blocking materials- check throughout) -seal penetrations in fire blocking and top plate in bed 4 closet
All Rough Inspection - Residential Failed 10/10/2024 10/10/2024 10/10/2024
Misc
Corrective Action Required
10/08/2024
-minimum 3 studs at all exterior wall corners. Tying walls together (See SE and SW Basement) south most wall missing stud -seal penetrations in fire blocking and top plate in bed 4 closet
All Rough Inspection - Residential Passed 10/11/2024 10/11/2024 10/11/2024
Misc
Resolved
10/11/2024
-minimum 3 studs at all exterior wall corners. Tying walls together (See SE and SW Basement) south most wall missing stud -seal penetrations in fire blocking and top plate in bed 4 closet
Driveway Inspection Partial 10/29/2024 10/29/2024 10/22/2024
Misc
Informational
10/22/2024
10-22-24 Dustin A , DW is formed and compacted, approved to pour, must maintain ADA through approach
Sidewalk Inspection Partial 10/22/2024 10/22/2024 10/22/2024
Misc
Informational
10/22/2024
10-22-24 Dustin A , SW is formed and compacted. Slopes are in compliance. Approved to pour
Plot Plan Inspection Passed 12/12/2024 12/12/2024
Occupancy Inspection - Codes Residential Failed 1/13/2025 1/13/2025 01/13/2025
Misc
Corrective Action Required
01/13/2025
-sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover covered water meter for inspection -identify sewer tracer wire and land in locator box -address pending driveway and sidewalk inspection -obtain issued lawn irrigation permit -receptacles in unfinished space to be gfci protected
Occupancy Inspection - Codes Residential Ready for Temp CO 1/15/2025 1/15/2025 01/15/2025
Misc
Resolved
01/15/2025
-sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover covered water meter for inspection -identify sewer tracer wire and land in locator box -address pending driveway and sidewalk inspection -obtain issued lawn irrigation permit -receptacles in unfinished space to be gfci protected
Miscellaneous Correction
Corrective Action Required
01/15/2025
-sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover covered water meter for inspection -identify sewer tracer wire and land in locator box -address pending driveway and sidewalk inspection -obtain issued lawn irrigation permit Passed for TCO only
Driveway Inspection Partial 1/17/2025 1/17/2025 01/16/2025
Misc
Informational
10/22/2024
10-22-24 Dustin A , DW is formed and compacted, approved to pour, must maintain ADA through approach 1-16-25 dustin a, dw slopes are in compliance. Will come back tomorrow after snow is removed to check for any cracks
Sidewalk Inspection Partial 1/17/2025 1/17/2025 01/16/2025
Misc
Informational
10/22/2024
10-22-24 Dustin A , SW is formed and compacted. Slopes are in compliance. Approved to pour 1-16-25 dustin a, sw slopes are in compliance. will check tomorrow after snow is cleared for cracks
Driveway Inspection Partial 1/21/2025 1/21/2025 01/17/2025
Misc
Informational
01/16/2025
10-22-24 Dustin A , DW is formed and compacted, approved to pour, must maintain ADA through approach 1-16-25 dustin a, dw slopes are in compliance. Will come back tomorrow after snow is removed to check for any cracks 1-17-25 Jamie S, DW still has contractor equipment and supplies covering it, granting partial until equipment and supplies are removed. Rescheduling for Tuesday.
Sidewalk Inspection Partial 1/21/2025 1/21/2025 01/17/2025
Misc
Informational
01/16/2025
10-22-24 Dustin A , SW is formed and compacted. Slopes are in compliance. Approved to pour 1-16-25 dustin a, sw slopes are in compliance. will check tomorrow after snow is cleared for cracks 1-17-25 Jamie S, DW still has contractor equipment and supplies covering it, granting partial until equipment and supplies are removed. Rescheduling for Tuesday.
Occupancy Inspection - Codes Residential Ready for Temp CO 2/5/2025 02/05/2025
Miscellaneous Correction
Corrective Action Required
01/15/2025
-sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover covered water meter for inspection -identify sewer tracer wire and land in locator box -address pending driveway and sidewalk inspection -obtain issued lawn irrigation permit Passed for TCO only
Occupancy Inspection - Codes Residential Ready for Temp CO 3/5/2025 03/05/2025
Miscellaneous Correction
Corrective Action Required
02/05/2025
-sod -splash blocks and sump pump discharge to extend 36” from foundation -uncover covered water meter for inspection -identify sewer tracer wire and land in locator box -address pending driveway and sidewalk inspection -obtain issued lawn irrigation permit Passed for TCO only
Sidewalk Inspection Partial 1/21/2025 1/21/2025 03/18/2025
Misc
Informational
01/17/2025
10-22-24 Dustin A , SW is formed and compacted. Slopes are in compliance. Approved to pour 1-16-25 dustin a, sw slopes are in compliance. will check tomorrow after snow is cleared for cracks 1-17-25 Jamie S, DW still has contractor equipment and supplies covering it, granting partial until equipment and supplies are removed. Rescheduling for Tuesday. 3-18-25 DP. Sod guys are onsite and I already see two broken sidewalk panels. I will come by tomorrow after sod is done and see how many end up being broken.
Driveway Inspection Partial 3/21/2025 3/21/2025 03/21/2025
Misc
Informational
01/17/2025
10-22-24 Dustin A , DW is formed and compacted, approved to pour, must maintain ADA through approach 1-16-25 dustin a, dw slopes are in compliance. Will come back tomorrow after snow is removed to check for any cracks 1-17-25 Jamie S, DW still has contractor equipment and supplies covering it, granting partial until equipment and supplies are removed. Rescheduling for Tuesday. 3-21-25 Dustin A, Contractor said they are not tearing out broken section today.
Sidewalk Inspection Partial 3/28/2025 3/28/2025 03/28/2025
Misc
Informational
03/18/2025
10-22-24 Dustin A , SW is formed and compacted. Slopes are in compliance. Approved to pour 1-16-25 dustin a, sw slopes are in compliance. will check tomorrow after snow is cleared for cracks 1-17-25 Jamie S, DW still has contractor equipment and supplies covering it, granting partial until equipment and supplies are removed. Rescheduling for Tuesday. 3-18-25 DP. Sod guys are onsite and I already see two broken sidewalk panels. I will come by tomorrow after sod is done and see how many end up being broken. 3-28-25 ,Dustin A, sw that need to be replaced is formed and is compacted. Approved to pour
Driveway Inspection Passed 03/28/2025
Misc
Informational
03/21/2025
10-22-24 Dustin A , DW is formed and compacted, approved to pour, must maintain ADA through approach 1-16-25 dustin a, dw slopes are in compliance. Will come back tomorrow after snow is removed to check for any cracks 1-17-25 Jamie S, DW still has contractor equipment and supplies covering it, granting partial until equipment and supplies are removed. Rescheduling for Tuesday. 3-21-25 Dustin A, Contractor said they are not tearing out broken section today. 3-28-25 ,Dustin A, dw is poured to city specs pass
Sidewalk Inspection Passed 3/31/2025 3/31/2025 03/31/2025
Misc
Informational
03/28/2025
10-22-24 Dustin A , SW is formed and compacted. Slopes are in compliance. Approved to pour 1-16-25 dustin a, sw slopes are in compliance. will check tomorrow after snow is cleared for cracks 1-17-25 Jamie S, DW still has contractor equipment and supplies covering it, granting partial until equipment and supplies are removed. Rescheduling for Tuesday. 3-18-25 DP. Sod guys are onsite and I already see two broken sidewalk panels. I will come by tomorrow after sod is done and see how many end up being broken. 3-28-25 ,Dustin A, sw that need to be replaced is formed and is compacted. Approved to pour 3-31-25 DP. SW has been fixed, cross slopes are now in compliance. Passed
Documents & Images
Date Uploaded File Type Document Name
04/15/2024 2024_04_09_Lot 110 Hook Farms_Apex_Permit Sealed
04/15/2024 HKF110 - Lee's Summit Permit Application Packet
04/15/2024 LOT 110 FINAL
04/19/2024 Permit Codes Residential Plan Review
04/29/2024 LOT 110 CITY
05/01/2024 Plot Plan APPROVED PLOT PLAN
05/01/2024 Permit Codes Residential Plan Review
05/01/2024 Permit DS Building Permit
05/01/2024 Receipt Receipt for transaction:2024-002786
05/01/2024 2024_04_23_Lot 110 Hook Farms_Apex_Permit Sealed
05/01/2024 Approved Plans APPROVED PLANS
05/15/2024 Letter INSPECTION SUMMARY
06/06/2024 Letter INSPECTION SUMMARY
07/11/2024 Letter INSPECTION SUMMARY
07/18/2024 Letter INSPECTION SUMMARY
07/18/2024 Letter INSPECTION SUMMARY
08/06/2024 Letter INSPECTION SUMMARY
08/09/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/04/2024 Letter INSPECTION SUMMARY
10/08/2024 Letter INSPECTION SUMMARY
10/10/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
10/22/2024 Letter INSPECTION SUMMARY
12/11/2024 Plot Plan APPROVED AS BUILT PLOT PLAN
12/12/2024 Letter INSPECTION SUMMARY
12/12/2024 Letter INSPECTION SUMMARY
01/13/2025 Letter INSPECTION SUMMARY
01/15/2025 Letter INSPECTION SUMMARY
01/15/2025 Certificate/License Codes Temporary Certificate of Occupancy
01/15/2025 Receipt Receipt for transaction:2025-000251
01/16/2025 Letter INSPECTION SUMMARY
01/16/2025 Letter INSPECTION SUMMARY
01/17/2025 Letter INSPECTION SUMMARY
01/17/2025 Letter INSPECTION SUMMARY
02/04/2025 TCOExtension Request Form - Lees Summit
03/04/2025 TCOExtension Request Form - Lees Summit
03/04/2025 Certificate/License Codes Temporary Certificate of Occupancy
03/04/2025 Receipt Receipt for transaction:2025-001266
03/04/2025 TCOExtension Request Form - Lees Summit
03/05/2025 Letter INSPECTION SUMMARY
03/18/2025 Letter INSPECTION SUMMARY
03/21/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
03/28/2025 Letter INSPECTION SUMMARY
03/31/2025 Letter INSPECTION SUMMARY
04/08/2025 TCOExtension Request Form2 - Lees Summit
04/08/2025 Certificate/License Codes Temporary Certificate of Occupancy
04/08/2025 Receipt Receipt for transaction:2025-002129
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home