Permit Application Status

PRRES20231586


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20231586
Building Permit - Residential
Certificate of Occupancy
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE. UNFINISHED BASEMENT. COVERED PATIO. ROOF TRUSSES.
04/12/2023
04/24/2023
10/11/2023
09/15/2023
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
Summit Homes, Address:120 SE 30th St, Phone:(816) 434-5074 Ext:320  
Savanna Scarbo, Address:120 SE 30th st, Phone:(816) 434-5074 Ext:321  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
TAYLOR@CLOVERANDHIVE.COM  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331401-Water Tap Fee $3,730.00 $3,730.00 Paid 04/24/2023
8350015-Water Meter Fee $550.50 $550.50 Paid 04/24/2023
8331507-Sanitary Sewer Development Fee $1,384.00 $1,384.00 Paid 04/24/2023
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 04/24/2023
7232302-Residential Excise Tax Fee $1,022.72 $1,022.72 Paid 04/24/2023
9110078-Valuation Fee New Single Family $1,283.43 $1,283.43 Paid 04/24/2023
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 08/21/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/10/2023 05/10/2023
Miscellaneous Correction
Informational
05/10/2023
Footings passed by a third party. Pier inspection was not added or passed by the third party.
Underslab Plumbing Inspection - Residential Failed 5/22/2023 5/22/2023 05/22/2023
Miscellaneous Correction
Corrective Action Required
05/22/2023
No visible street address identification and possible lack of proper erosion control.
Sewer Service Inspection - R Passed 5/22/2023 05/22/2023
Water Service Inspection - R Partial 5/22/2023 05/22/2023
Miscellaneous Correction
Corrective Action Required
05/22/2023
Water line from the fountain to 20 feet out passed. This is a partial pass only
Water Service Inspection - R Passed 5/23/2023 (8:45) 5/23/2023 05/23/2023
Miscellaneous Correction
Resolved
05/23/2023
Water line from the fountain to 20 feet out passed. This is a partial pass only
Underslab Plumbing Inspection - Residential Passed 5/23/2023 5/23/2023 05/23/2023
Miscellaneous Correction
Resolved
05/23/2023
No visible street address identification and possible lack of proper erosion control.
Erosion Control Inspection Residential Failed 5/23/2023 05/23/2023
Miscellaneous Correction
Corrective Action Required
05/23/2023
Gravel is not spread for driveway. Lot to the South where the foundation dirt was dumped needs erosion control installed
Erosion Control Inspection Residential Failed 05/24/2023
Miscellaneous Correction
Corrective Action Required
05/23/2023
Gravel is not spread for driveway. Lot to the South where the foundation dirt was dumped needs erosion control installed
Erosion Control Inspection Residential Failed 6/5/2023 06/05/2023
Miscellaneous Correction
Corrective Action Required
05/24/2023
Gravel is not spread for driveway. Lot to the South where the foundation dirt was dumped needs erosion control installed
Misc
Corrective Action Required
06/05/2023
Building lot needs erosion control installed and or rebuilt what has deteriorated. The lot to the south still needs erosion control where dirt from 3433 Corbin was dumped. Building inspections will be suspended until proper erosion control is completed on both lots
All Rough Inspection - Residential Failed 6/21/2023 06/21/2023
Miscellaneous Correction
Corrective Action Required
06/21/2023
- Portal inspection was never completed, uncover for inspection or have an engineer letter - Garage anchor bolts need to be in the center 1/3 bottom plate - Garage truss screws are not visible - Address jack stud at garage header - Address bedroom 2 corner continues studs - Address window jack spacing - Corner studs need to be nail off every 16 inches - LIB in bath 2 needs to be nailed off - Address window studs in great room - Address all bottom of top plate that is not supported by a stud - Address garage T at stair entry to house - Future basement bathroom ceiling joist is not supported - 3 basement I beam need more support at basement walls - Back porch soffit is installed and truss tie in can not be checked
Electrical Service Inspection Passed 6/21/2023 06/21/2023
Gas Service Inspection - Residential Passed 6/21/2023 06/21/2023
Erosion Control Inspection Residential Partial 6/21/2023 06/21/2023
Miscellaneous Correction
Resolved
06/21/2023
Gravel is not spread for driveway. Lot to the South where the foundation dirt was dumped needs erosion control installed
Misc
Resolved
06/21/2023
Building lot needs erosion control installed and or rebuilt what has deteriorated. The lot to the south still needs erosion control where dirt from 3433 Corbin was dumped. Building inspections will be suspended until proper erosion control is completed on both lots
Misc
Informational
06/21/2023
Proper erosion control is in place at this time. 06/21/2023
All Rough Inspection - Residential Passed 6/23/2023 6/23/2023 06/23/2023
Miscellaneous Correction
Resolved
06/23/2023
- Portal inspection was never completed, uncover for inspection or have an engineer letter - Garage anchor bolts need to be in the center 1/3 bottom plate - Garage truss screws are not visible - Address jack stud at garage header - Address window jack spacing in bedroom 2
Piers/Caissons Inspection - Residential Passed 7/21/2023 (8:45) 7/21/2023 07/21/2023
Misc
Informational
07/21/2023
One pier inspected for the back porch corner post
Driveway Inspection Partial 7/21/2023 7/21/2023 07/21/2023
Misc
Informational
07/21/2023
7-21-23 PS Performed driveway pre pour inspection, ok to pour
Sidewalk Inspection Partial 7/21/2023 7/21/2023 07/21/2023
Misc
Informational
07/21/2023
7-21-23 PS Performed sidewalk pre pour inspection, ok to pour
Driveway Inspection Passed 7/26/2023 7/26/2023 07/26/2023
Misc
Informational
07/21/2023
7-21-23 PS Performed driveway pre pour inspection, ok to pour 7-26-23 PS Driveway meets LS and ADA specs
Sidewalk Inspection Passed 7/26/2023 7/26/2023 07/26/2023
Misc
Informational
07/21/2023
7-21-23 PS Performed sidewalk pre pour inspection, ok to pour 7-26-23 PS Sidewalk meets LS and ADA specs
Erosion Control Inspection Residential Failed 8/17/2023 08/17/2023
Misc
Informational
06/21/2023
Proper erosion control is in place at this time. 06/21/2023
Miscellaneous Correction
Corrective Action Required
08/17/2023
Erosion control is not installed at the time of TCO inspection. Erosion control is required until occupancy.
Occupancy Inspection - Codes Residential Failed 8/17/2023 8/17/2023 08/17/2023
Miscellaneous Correction
Corrective Action Required
08/17/2023
- Front porch hand rail is to high, code is a height of 34 to 38 inches from nose of step - Kitchen sink needs a anti hammer valve installed - Utility room needs anti hammer valves installed - Vertical boards above interior garage door need to be sealed at the ceiling - Seal all exterior penetrations
Occupancy Inspection - Codes Residential Ready for Temp CO 8/21/2023 8/21/2023 08/21/2023
Miscellaneous Correction
Resolved
08/21/2023
- Front porch hand rail is to high, code is a height of 34 to 38 inches from nose of step - Kitchen sink needs a anti hammer valve installed - Utility room needs anti hammer valves installed - Vertical boards above interior garage door need to be sealed at the ceiling - Seal all exterior penetrations
Miscellaneous Correction
Corrective Action Required
08/21/2023
- Sod, splash blocks and sump pump extension is not installed at the time of occupancy inspection. Ready for TCO only. 08/21/2023 KBEARD
Plot Plan Inspection Passed 9/15/2023 09/15/2023
Erosion Control Inspection Residential Passed 9/15/2023 09/15/2023
Misc
Resolved
09/15/2023
Proper erosion control is in place at this time. 06/21/2023
Miscellaneous Correction
Resolved
09/15/2023
Erosion control is not installed at the time of TCO inspection. Erosion control is required until occupancy.
Occupancy Inspection - Codes Residential Full C of O 9/15/2023 9/15/2023 09/15/2023
Miscellaneous Correction
Resolved
09/15/2023
- Sod, splash blocks and sump pump extension is not installed at the time of occupancy inspection. Ready for TCO only. 08/21/2023 KBEARD
Documents & Images
Date Uploaded File Type Document Name
04/12/2023 CB #12 - Permit Application
04/14/2023 Permit Codes Residential Plan Review
04/14/2023 Permit Codes Residential Plan Review
04/20/2023 Approved Plans APPROVED PLANS
04/20/2023 Approved Plans APPROVED TRUSS LAYOUT
04/20/2023 Approved Plans APPROVED TRUSS PACKAGE
04/20/2023 Permit Codes Residential Plan Review
04/20/2023 Permit Codes Residential Plan Review
04/24/2023 Permit DS Building Permit
04/24/2023 Permit DS Building Permit
04/24/2023 Receipt Receipt for transaction:2023-002336
05/09/2023 M L Crose 3433 SE Corbin Dr LSMO Cobey Creek Lot 1 Clayton Permit 2023-1586 Footing Inspection Report 5-9-23
05/10/2023 Letter INSPECTION SUMMARY
05/17/2023 Plot Plan APPROVED PLOT PLAN
05/17/2023 Approved Plans APPROVED BASEMENT A2 A3 PLANS
05/22/2023 Letter INSPECTION SUMMARY
05/22/2023 Letter INSPECTION SUMMARY
05/22/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
05/23/2023 Letter INSPECTION SUMMARY
06/05/2023 Letter INSPECTION SUMMARY
06/21/2023 Letter INSPECTION SUMMARY
06/21/2023 Letter INSPECTION SUMMARY
06/21/2023 Letter INSPECTION SUMMARY
06/21/2023 Letter INSPECTION SUMMARY
06/23/2023 Letter INSPECTION SUMMARY
07/21/2023 Letter INSPECTION SUMMARY
07/21/2023 Letter INSPECTION SUMMARY
07/21/2023 Letter INSPECTION SUMMARY
07/21/2023 Letter INSPECTION SUMMARY
07/26/2023 Letter INSPECTION SUMMARY
07/26/2023 Letter INSPECTION SUMMARY
08/17/2023 Letter INSPECTION SUMMARY
08/17/2023 Letter INSPECTION SUMMARY
08/21/2023 Certificate/License Codes Temporary Certificate of Occupancy
08/21/2023 Receipt Receipt for transaction:2023-006458
09/11/2023 Plot Plan APPROVED AS BUILT PLOT PLAN
09/15/2023 Letter INSPECTION SUMMARY
09/15/2023 Letter INSPECTION SUMMARY
09/15/2023 Letter Codes Final Certificate of Occupancy
09/15/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: