Permit Application Status

PRRES20216173


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20216173
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE. WALKOUT BASEMENT. FINISHED/UNFINISHED BASEMENT. COVERED DECK.
11/30/2021
12/15/2021
09/30/2022
Locations
Contacts
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
Curtis Tate, Address:PO box 942   
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
Brandon Bamesberger, Address:PO Box 942  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $630.00 $630.00 Paid 12/15/2021
8331401-Water Tap Fee $3,655.00 $3,655.00 Paid 12/15/2021
8350015-Water Meter Fee $479.24 $479.24 Paid 12/15/2021
9110073-Right of Way Permit Fee $85.00 $85.00 Paid 12/15/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/15/2021
9110078-Valuation Fee New Single Family $1,713.41 $1,713.41 Paid 12/15/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 09/02/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 09/02/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 09/02/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 09/02/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/28/2021 12/28/2021 12/28/2021
Misc
Informational
12/28/2021
3rd party inspected
Sewer Service Inspection - R Passed 1/24/2022 (1:45) 1/24/2022 01/24/2022
Underslab Plumbing Inspection - Residential Passed 1/25/2022 1/25/2022 01/25/2022
Piers/Caissons Inspection - Residential Passed 2/10/2022 02/10/2022
Water Service Inspection - R Passed 4/12/2022 4/12/2022 04/12/2022
Erosion Control Inspection Residential Failed 5/12/2022 05/12/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
05/12/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -maintain silt fence -maintain gravel filter
Gas Service Inspection - Residential Passed 5/12/2022 5/12/2022 05/12/2022
Electrical Service Inspection Passed 5/12/2022 5/12/2022 05/12/2022
All Rough Inspection - Residential Failed 5/12/2022 5/12/2022 05/12/2022
Misc
Corrective Action Required
05/12/2022
-frame and nail PFG garage to plans/code -anchor bolts within 12” of plate breaks -fire block hvac chase into furr down in garage -address cut floor joist in hvac chase -strap top plate where lapped less than 24” garage W wall -missing hangers above garage entry -address 2x10 notched for RA at stairwell wall -fire block dead space at garage entry hall -missing nuts on bolts attaching ledger to beam (kitchen) -missing hanger for lvl above dining -missing stud packs under same lvl (4-2x4) -address rafters above great room windows landing on nothing -uncover covered patio for inspection -fire block fireplace into ceiling spaces -solid block cripple wall above great room/kitchen -address rafter to ceiling joist connections in master -complete plumbing for master tub -seal hole in ceiling above master bath used for bath fan -address notch in the middle 1/4 of floor joists above master closet -fire block wall space to ceiling space in bed 2 -fireblock bed 5 wall to ceiling -fire block bed 5 wall to bath ceiling and closet -fireblock loft walls to ceiling -seal penetrations in loft to bed 3 ceiling space -seal penetrations in bed 3 to bed 3 closet ceiling space -fire block E bed 3 and bed 3 closet wall to ceiling space -fire block bed 4 walls to ceiling space -address hole in bed 4 E wall -seal penetration in bed 4 closet top plate -add support to furr down in basement to joists above -fire block furr down ends in basement -fireblock vertical to horizontal every 10’ in basement -fireblock furr out walls in basement to ceiling line -fire block bed 7 bath into ceiling space W wall -seal penetrations in RA panning in furr down bed 7bath -install all beams to plans and anchor -install missing stud at bed 7 entry -anchor bolts in basement to be in middle 1/3 of plate -attach post to beam at deck per plans
All Rough Inspection - Residential Not Ready 5/23/2022 5/23/2022 05/23/2022
Misc
Corrective Action Required
05/12/2022
-frame and nail PFG garage to plans/code -anchor bolts within 12” of plate breaks -fire block hvac chase into furr down in garage -address cut floor joist in hvac chase -strap top plate where lapped less than 24” garage W wall -missing hangers above garage entry -address 2x10 notched for RA at stairwell wall -fire block dead space at garage entry hall -missing nuts on bolts attaching ledger to beam (kitchen) -missing hanger for lvl above dining -missing stud packs under same lvl (4-2x4) -address rafters above great room windows landing on nothing -uncover covered patio for inspection -fire block fireplace into ceiling spaces -solid block cripple wall above great room/kitchen -address rafter to ceiling joist connections in master -complete plumbing for master tub -seal hole in ceiling above master bath used for bath fan -address notch in the middle 1/4 of floor joists above master closet -fire block wall space to ceiling space in bed 2 -fireblock bed 5 wall to ceiling -fire block bed 5 wall to bath ceiling and closet -fireblock loft walls to ceiling -seal penetrations in loft to bed 3 ceiling space -seal penetrations in bed 3 to bed 3 closet ceiling space -fire block E bed 3 and bed 3 closet wall to ceiling space -fire block bed 4 walls to ceiling space -address hole in bed 4 E wall -seal penetration in bed 4 closet top plate -add support to furr down in basement to joists above -fire block furr down ends in basement -fireblock vertical to horizontal every 10’ in basement -fireblock furr out walls in basement to ceiling line -fire block bed 7 bath into ceiling space W wall -seal penetrations in RA panning in furr down bed 7bath -install all beams to plans and anchor -install missing stud at bed 7 entry -anchor bolts in basement to be in middle 1/3 of plate -attach post to beam at deck per plans
Misc
Corrective Action Required
05/23/2022
Inspection denied due to lack of erosion control. Mitchell Schwarz 05/23/2022 12:00 PM
All Rough Inspection - Residential Not Ready 5/24/2022 5/24/2022 05/24/2022
Misc
Corrective Action Required
05/23/2022
-frame and nail PFG garage to plans/code -anchor bolts within 12” of plate breaks -fire block hvac chase into furr down in garage -address cut floor joist in hvac chase -strap top plate where lapped less than 24” garage W wall -missing hangers above garage entry -address 2x10 notched for RA at stairwell wall -fire block dead space at garage entry hall -missing nuts on bolts attaching ledger to beam (kitchen) -missing hanger for lvl above dining -missing stud packs under same lvl (4-2x4) -address rafters above great room windows landing on nothing -uncover covered patio for inspection -fire block fireplace into ceiling spaces -solid block cripple wall above great room/kitchen -address rafter to ceiling joist connections in master -complete plumbing for master tub -seal hole in ceiling above master bath used for bath fan -address notch in the middle 1/4 of floor joists above master closet -fire block wall space to ceiling space in bed 2 -fireblock bed 5 wall to ceiling -fire block bed 5 wall to bath ceiling and closet -fireblock loft walls to ceiling -seal penetrations in loft to bed 3 ceiling space -seal penetrations in bed 3 to bed 3 closet ceiling space -fire block E bed 3 and bed 3 closet wall to ceiling space -fire block bed 4 walls to ceiling space -address hole in bed 4 E wall -seal penetration in bed 4 closet top plate -add support to furr down in basement to joists above -fire block furr down ends in basement -fireblock vertical to horizontal every 10’ in basement -fireblock furr out walls in basement to ceiling line -fire block bed 7 bath into ceiling space W wall -seal penetrations in RA panning in furr down bed 7bath -install all beams to plans and anchor -install missing stud at bed 7 entry -anchor bolts in basement to be in middle 1/3 of plate -attach post to beam at deck per plans
Misc
Resolved
05/24/2022
Inspection denied due to lack of erosion control. Mitchell Schwarz 05/23/2022 12:00 PM
Misc
Corrective Action Required
05/24/2022
Inspection denied -provide clearly posted address -provide engineer letters uploaded as required -provide city stamped plans for correct address 5/24/22
All Rough Inspection - Residential Not Ready 5/26/2022 5/26/2022 05/26/2022
Misc
Corrective Action Required
05/24/2022
-frame and nail PFG garage to plans/code (triple bottom plate, anchor bolts not in middle 1/3 of plate) -anchor bolts within 12” of plate breaks (single car S wall) -fire block hvac chase into furr down in garage -missing nails in hangers above garage entry area -address 2x10 notched for RA at stairwell wall -missing nuts on bolts attaching ledger to beam (kitchen) -address rafters above great room windows landing on nothing(cut down just hanging) -uncover covered patio for inspection -fire block fireplace into ceiling spaces (when using Unfaced insulation, it must be packed tightly and securely) -complete plumbing for master tub (fireblock) -address new hole made for bath vent through joist above master shower -fire block E bed 3 and bed 3 closet wall to ceiling space -fire block furr down ends in basement -fireblock vertical to horizontal every 10’ in basement (seal penetrations, when using Unfaced insulation must be packed tightly) -fireblock furr out walls in basement to ceiling line(if using Unfaced insulation must be packed tightly and securely) -seal penetrations in RA panning in furr down bed 7bath -install all beams to plans -attach post to beam at deck per plans
Misc
Resolved
05/26/2022
Inspection denied -provide clearly posted address -provide engineer letters uploaded as required -provide city stamped plans for correct address 5/24/22
All Rough Inspection - Residential Failed 6/2/2022 6/2/2022 06/02/2022
Misc
Corrective Action Required
05/26/2022
-fire block hvac chase into furr down in garage -missing nails in hangers above garage entry area -fire block fireplace into ceiling spaces (when using Unfaced insulation, it must be packed tightly and securely) -fireblock holes above master bath that were used for bath vent -fire block furr down ends in basement -fireblock vertical to horizontal every 10’ in basement (seal penetrations, when using Unfaced insulation must be packed tightly) -fireblock furr out walls in basement to ceiling line(if using Unfaced insulation must be packed tightly and securely) -seal penetrations in RA panning in furr down bed 7bath -install all columns to plans
All Rough Inspection - Residential Not Ready 6/3/2022 6/3/2022 06/03/2022
Misc
Corrective Action Required
06/02/2022
-fire block hvac chase into furr down in garage -fire block fireplace into ceiling spaces (when using Unfaced insulation, it must be packed tightly and securely) -fire block furr down ends in basement -fireblock vertical to horizontal every 10’ in basement (seal penetrations, when using Unfaced insulation must be packed tightly) -fireblock furr out walls in basement to ceiling line(if using Unfaced insulation must be packed tightly and securely) -seal penetrations in RA panning in furr down bed 7bath -install all columns to plans
All Rough Inspection - Residential Passed 6/7/2022 6/7/2022 06/07/2022
Misc
Resolved
06/07/2022
-fire block hvac chase into furr down in garage -fire block fireplace into ceiling spaces (when using Unfaced insulation, it must be packed tightly and securely) -fire block furr down ends in basement -fireblock vertical to horizontal every 10’ in basement (seal penetrations, when using Unfaced insulation must be packed tightly) -fireblock furr out walls in basement to ceiling line(if using Unfaced insulation must be packed tightly and securely) -seal penetrations in RA panning in furr down bed 7bath -install all columns to plans
Driveway Inspection Partial 8/24/2022 8/24/2022 08/24/2022
Misc
Informational
08/24/2022
4-24-22 RH. Driveway meets LS and ADA specification.
Driveway Inspection Partial 8/24/2022 08/24/2022
Misc
Informational
08/24/2022
8-24-22 RH. Driveway meets LS and ADA specification.
Sidewalk Inspection Partial 8/24/2022 8/24/2022 08/24/2022
Misc
Informational
08/24/2022
8-24-22 RH. Sidewalk is formed up and aggregate is placed and compacted.
Driveway Inspection Partial 8/31/2022 8/31/2022 08/24/2022
Misc
Informational
08/24/2022
8-24-22 RH. Driveway is formed up and aggregate is placed and compacted.
Sidewalk Inspection Partial 8/31/2022 8/31/2022 08/31/2022
Misc
Informational
08/24/2022
8-24-22 RH. Sidewalk is formed up and aggregate is placed and compacted. 8-31-22 RH. Pour occurred today.
Sidewalk Inspection Passed 9/7/2022 9/7/2022 09/07/2022
Misc
Informational
08/31/2022
8-24-22 RH. Sidewalk is formed up and aggregate is placed and compacted. 8-31-22 RH. Pour occurred today. 9-7-22 RH. Sidewalk meets LS and ADA Specification.
Driveway Inspection Passed 9/8/2022 9/8/2022 09/07/2022
Misc
Informational
08/24/2022
8-24-22 RH. Driveway is formed up and aggregate is placed and compacted. 9-7-22 RH. Driveway meets LS and ADA Specification.
Sidewalk Inspection Passed 9/8/2022 09/08/2022
Misc
Informational
09/07/2022
8-24-22 RH. Sidewalk is formed up and aggregate is placed and compacted. 8-31-22 RH. Pour occurred today. 9-7-22 RH. Sidewalk meets LS and ADA Specification.
Plot Plan Inspection Passed 9/20/2022 09/20/2022
Occupancy Inspection - Codes Residential Failed 9/20/2022 9/20/2022 09/20/2022
Misc
Corrective Action Required
09/20/2022
-obtain lawn irrigation permit -sod -gutters -splash blocks and sump pump discharge to extend 36” from foundation -uncover covered after meter for inspection -provide access to jacuzzi tub in master pump motor and GFCI outlet to code -handrail required at 2nd floor loft area -stairs at 2nd story loft area greater than 3/8 difference in rise -address electrical at hot water heater -seal all exterior penetrations
Erosion Control Inspection Residential Passed 9/29/2022 09/29/2022
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
09/29/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -maintain silt fence -maintain gravel filter
Occupancy Inspection - Codes Residential Failed 9/29/2022 9/29/2022 09/29/2022
Misc
Resolved
09/29/2022
-provide access to jacuzzi tub pump motor in master. See code p2720.1
Occupancy Inspection - Codes Residential Full C of O 9/30/2022 9/30/2022 09/30/2022
Documents & Images
Date Uploaded File Type Document Name
11/30/2021 hf29 permit app
11/30/2021 HF029 - Air Combustion Calculation
11/30/2021 hf29 excise tax app
12/14/2021 Plot Plan APPROVED PLOT PLAN
12/14/2021 Permit Codes Residential Plan Review
12/15/2021 Permit DS Building Permit
12/15/2021 Receipt Receipt for transaction:2021-009307
12/22/2021 M L Crose 2039 SW Hook Farm Dr LSMO Hook Farms Lot 29 SAB Permit 2021-6173 Foundation footing Inspection Report 12-22-21
12/28/2021 Letter INSPECTION SUMMARY
01/24/2022 Letter INSPECTION SUMMARY
01/25/2022 Letter INSPECTION SUMMARY
02/10/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/12/2022 Letter INSPECTION SUMMARY
05/23/2022 Letter INSPECTION SUMMARY
05/24/2022 Letter INSPECTION SUMMARY
05/25/2022 DW FRAMING REPORT Brookline Custom 2039 SW Hook Farm Dr HF029
05/25/2022 Approved Plans APPROVED PLANS
05/26/2022 Letter INSPECTION SUMMARY
06/02/2022 Letter INSPECTION SUMMARY
06/03/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
06/07/2022 Letter INSPECTION SUMMARY
08/24/2022 Letter INSPECTION SUMMARY
08/24/2022 Letter INSPECTION SUMMARY
08/24/2022 Letter INSPECTION SUMMARY
08/24/2022 Letter INSPECTION SUMMARY
08/31/2022 Letter INSPECTION SUMMARY
09/02/2022 Receipt Receipt for transaction:2022-007226
09/07/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/08/2022 Letter INSPECTION SUMMARY
09/20/2022 Letter INSPECTION SUMMARY
09/20/2022 Letter INSPECTION SUMMARY
09/20/2022 Letter INSPECTION SUMMARY
09/29/2022 Letter INSPECTION SUMMARY
09/29/2022 Letter INSPECTION SUMMARY
09/30/2022 Letter Field Certificate of Occupancy
09/30/2022 Letter Codes Final Certificate of Occupancy
Upload Documents
  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:
Browse..





    Portal Home