Permit Application Status

PRRES20214916


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20214916
Building Permit - Residential
Certificate of Occupancy
SAB CONSTRUCTION LLC
NEW SINGLE FAMILY
NEW HOUSE. FNISHED WALKOUT BASEMENT.
09/21/2021
09/28/2021
03/21/2022
09/01/2022
Locations
Contacts
SAB CONSTRUCTION INC, Address:PO BOX 942, Phone:(816) 524-3855  
SAB CONSTRUCTION LLC, Address:PO BOX 942, Phone:(816) 524-3855  
Curtis Tate, Address:PO box 942   
GARRISON PLUMBING, Address:15430 S MAHAFFIE ST STE 102, Phone:(913) 768-1311  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
CS ELECTRIC LLC, Address:1408 W COLLEGE ST, Phone:(816) 423-0061  
Zack Bryant, Address:PO Box 942  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
8331507-Sewer Connection Fee $630.00 $630.00 Paid 09/28/2021
Water Tap Fee $3,655.00 $3,655.00 Paid 09/28/2021
Water Meter Fee $479.24 $479.24 Paid 09/28/2021
Right of Way Permit Fee $85.00 $85.00 Paid 09/28/2021
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 09/28/2021
Valuation Fee New Single Family $1,924.45 $1,924.45 Paid 09/28/2021
Temporary Occupancy Fee $50.00 $50.00 Paid 08/25/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Residential Failed 10/21/2021 10/21/2021 10/21/2021
Misc
Corrective Action Required
10/21/2021
-CONNECT THE FLOOR DRAIN TO DOWNSTREAM OF THE BATH GROUP OR CONNECT TO THE WASTE STACK DRAIN MIN 30" AWAY FROM THE WASTE STACK.
Underslab Plumbing Inspection - Residential Passed 10/22/2021 10/22/2021 10/22/2021
Misc
Resolved
10/22/2021
-CONNECT THE FLOOR DRAIN TO DOWNSTREAM OF THE BATH GROUP OR CONNECT TO THE WASTE STACK DRAIN MIN 30" AWAY FROM THE WASTE STACK.
Sewer Service Inspection - R Passed 10/25/2021 (1:00) 10/25/2021 10/25/2021
Water Service Inspection - R Passed 10/27/2021 (9:45) 10/27/2021 10/27/2021
All Rough Inspection - Residential Failed 4/5/2022 4/5/2022 04/05/2022
Misc
Corrective Action Required
04/05/2022
-Nail garage PFH wall sheathing to all stud and header per code -Solid block joist ends above garage portal header and I beam -Support hip rafter above garage -Joist notching cannot exceed 1/6 of joist depth (above garage and master closet) -Strap interior bearing wall top plates bored more than 50% -Nail hanger above 1st fl stair landing -Install hanger above laundry -Rear dining CSPF walls not framed per plan -Snow-block at step flashings at rear great room wall -Fb fireplace space from roof (top blockings not 2x8) -Support hip rafter above master bedroom -Fb wall top plate penetration by dryer duct -Support ridge above front entry -Brace 2nd fl walls per plan -Remove sheathing above bedroom 4 bathroom -Support lvl hip rafter above bedroom 4 to reduce span -The hip support struts above bedroom 5 exceed 45 deg from vertical. -Install basement walkout door -Pan off return air space above gym from soffit; seal penetrations -Fb gym exterior wall from soffit -Check with the engineer to verify that the bearing wall between master bathroom and master closet has proper support underneath on basement **OK TO INSULATE
Gas Service Inspection - Residential Passed 4/5/2022 4/5/2022 04/05/2022
Electrical Service Inspection Failed 4/5/2022 4/5/2022 04/05/2022
Misc
Corrective Action Required
04/05/2022
Not ready
Piers/Caissons Inspection - Residential Passed 4/26/2022 04/26/2022
Electrical Service Inspection Failed 4/27/2022 4/27/2022 04/27/2022
Misc
Corrective Action Required
04/05/2022
-Drive grounding rod down into soil. If not able to because of rock, drive at a 45 deg angle into soil or bury horizontally into min 30” deep trench
Footing Inspection - Residential Passed 04/27/2022
Misc
Informational
04/27/2022
Footing inspected and approved by engineer
All Rough Inspection - Residential Failed 4/27/2022 4/27/2022 04/27/2022
Misc
Corrective Action Required
04/05/2022
-Joist notching cannot exceed 1/6 of joist depth (above garage and master closet) **have engineer address this -Rear dining CSPF walls not framed per plan **The headers are not corner to corner; the siding is not nailed per CSPF wall detail. Have engineer address this -Connect joist to header above bedroom 2 with proper device -Brace 2nd fl walls per plan -Remove sheathing above bedroom 4 bathroom **not done -Install basement walkout door per security code -Fb gym exterior wall from soffit **fb gap at I beam web and wiring &plumbing; Fb south basement wall from joist space -Check with the engineer to verify that the bearing wall between master bathroom and master closet has proper support underneath in basement. This wall carries about 15 ft of tributary floor load plus roof load.
Electrical Service Inspection Passed 5/11/2022 5/11/2022 05/11/2022
Misc
Resolved
05/11/2022
-Drive grounding rod down into soil. If not able to because of rock, drive at a 45 deg angle into soil or bury horizontally into min 30” deep trench
All Rough Inspection - Residential Failed 5/13/2022 5/13/2022 05/13/2022
Misc
Corrective Action Required
04/27/2022
-Joist notching cannot exceed 1/6 of joist depth (above master closet). Joist cut approximately 2” from top of joist -Install basement walkout door per security code
All Rough Inspection - Residential Passed 5/17/2022 5/17/2022 05/17/2022
Misc
Resolved
05/17/2022
-Joist notching cannot exceed 1/6 of joist depth (above master closet). Joist cut approximately 2” from top of joist -Install basement walkout door per security code
Driveway Inspection Partial 6/28/2022 6/28/2022 06/28/2022
Misc
Informational
06/28/2022
6-28-22 AN forms are in place and aggregate is present and compacted
Sidewalk Inspection Partial 6/28/2022 6/28/2022 06/28/2022
Misc
Informational
06/28/2022
6-28-22 AN forms are in place and aggregate is present and compacted
Driveway Inspection Passed 7/1/2022 7/1/2022 07/06/2022
Misc
Informational
06/28/2022
6-28-22 AN forms are in place and aggregate is present and compacted
Misc
Informational
07/06/2022
7-6-22 AN driveway looks good and meets Ada spec
Sidewalk Inspection Failed 7/1/2022 7/1/2022 07/06/2022
Misc
Informational
06/28/2022
6-28-22 AN forms are in place and aggregate is present and compacted
Misc
Corrective Action Required
07/06/2022
7-6-22 AN there is a couple of sidewalk panels missing
Sidewalk Inspection Partial 8/2/2022 8/2/2022 08/02/2022
Misc
Informational
07/06/2022
6-28-22 AN forms are in place and aggregate is present and compacted
Misc
Corrective Action Required
07/06/2022
7-6-22 AN there is a couple of sidewalk panels missing 8-2-22 AN forms are in place and aggregate is present and compacted
Sidewalk Inspection Passed 8/4/2022 8/4/2022 08/12/2022
Misc
Informational
08/02/2022
6-28-22 AN forms are in place and aggregate is present and compacted
Misc
Corrective Action Required
08/02/2022
7-6-22 AN there is a couple of sidewalk panels missing 8-2-22 AN forms are in place and aggregate is present and compacted 8-12-22 AN sidewalk looks good and meets Ada spec
Occupancy Inspection - Codes Residential Failed 8/19/2022 8/19/2022 08/19/2022
Misc
Corrective Action Required
08/19/2022
**PROVIDE EROSION CONTROL ALONG THE STREET -Water meter is buried -Provide guardrail at front stoop edge where more than 30” from grade, as measured 36” out from edge down to grade -As-graded plot plan is required -Final grade, sod, downspout and sump pump extension -Provide sewer tracer wire port at grade -Install tamper-proof caps at AC valves -Complete deck -Rear patio slab must slope away from house -Garage stair handrail must be graspable -Close underneath garage boxed out wall with 5/8” gypsum board -Provide AFCI protection for all outlets required per NEC 210.12 (2nd fl washer) -Screw the exterior door embedded jamb brace into studs -Provide a water shutoff valve for the water heater on the left of furnace
Occupancy Inspection - Codes Residential Ready for Temp CO 8/25/2022 8/25/2022 08/25/2022
Misc
Corrective Action Required
08/19/2022
-Sod, downspout and sump pump extension -Complete deck **support upper landing floor beams per discussion; install 2 screws at each end of ledger board
Plot Plan Inspection Passed 8/25/2022 08/25/2022
Occupancy Inspection - Codes Residential Temporary C of O 08/25/2022
Misc
Corrective Action Required
08/25/2022
-Sod, downspout and sump pump extension -Complete deck **support upper landing floor beams per discussion; install 2 screws at each end of ledger board
Occupancy Inspection - Codes Residential Full C of O 9/1/2022 9/1/2022 09/01/2022
Misc
Resolved
09/01/2022
-Sod, downspout and sump pump extension -Complete deck **support upper landing floor beams per discussion; install 2 screws at each end of ledger board
Documents & Images
Date Uploaded File Type Document Name
09/21/2021 MO114 - Air Combustion 9_20_21
09/21/2021 MO114 - Engineer letter ref elevation
09/21/2021 MO114 - Revised Plans - Custom Barolo 9_20_21 - Copy 9_21_21
09/22/2021 Approved Plans APPROVED DRAWINGS
09/22/2021 Application Form APPLICATION
09/22/2021 Application Form EXCISE TAX FORM
09/22/2021 Permit Codes Residential Plan Review
09/27/2021 Plot Plan APPROVED PLOT PLAN
09/27/2021 Permit Codes Residential Plan Review
09/28/2021 Permit DS Building Permit
09/28/2021 Receipt Receipt for transaction:2021-007620
10/13/2021 4725 NE Freehold Dr LSMO Monticello Lot 114 SAB P 2021-4916 3rd Party Footing Inspection
10/21/2021 Letter INSPECTION SUMMARY
10/22/2021 Letter INSPECTION SUMMARY
10/25/2021 Letter INSPECTION SUMMARY
10/27/2021 Letter INSPECTION SUMMARY
04/05/2022 Letter INSPECTION SUMMARY
04/05/2022 Letter INSPECTION SUMMARY
04/05/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
05/11/2022 Letter INSPECTION SUMMARY
05/11/2022 DW FRAMING ADDENDUM Custom Barlo MO114 4725 NE Freehold Dr
05/13/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
06/28/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
07/06/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
08/12/2022 Letter INSPECTION SUMMARY
08/19/2022 Letter INSPECTION SUMMARY
08/24/2022 Email Memo Style
08/24/2022 Plot Plan APPROVED AS BUILT PLOT PLAN
08/25/2022 Letter INSPECTION SUMMARY
08/25/2022 Receipt Receipt for transaction:2022-006996
08/25/2022 Letter Codes Temporary Certificate of Occupancy
09/01/2022 Letter Field Certificate of Occupancy
09/01/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home