Summary
PRRES20212186
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO STOP WORK ORDER generated on 08/30/2021 12:00 AM by username 'Khanh Nguyen'. STOP WORK ORDER removed on 09/17/2021 12:00 AM by username 'Khanh Nguyen'.
05/03/2021
06/07/2021
10/31/2021
03/10/2023
Locations
Contacts
DAVE RICHARDS HOMEBUILDING INC, Address:605 SW US HIGHWAY 40 #414, Phone:(816) 365-8034  
DAVE@DAVERICHARDSHOMES.COM  
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
R-MECH HEATING COOLING & PLUMBING , Address:2304 FAYETTE, Phone:(913) 502-0434  
INTREPID ELECTRIC LLC, Address:620 S KISNER CIR, Phone:(816) 796-2781  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
Reviews

There are no reviews for this permit application.

Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $992.38 $992.38 Paid 06/07/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 06/07/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/07/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 06/07/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 06/07/2021
8331507-Sewer Connection Fee $480.00 $480.00 Paid 06/07/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 03/09/2023
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 03/09/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 8/25/2021 08/25/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/25/2021
EROSION CONTROL REQUIRED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. FAILURE TO COMPLY WITH EROSION REQUIREMENT WILL RESULT IN THE ISSUANCE OF A STOP-WORK ORDER
Erosion Control Inspection Residential Failed - Stop Work 8/30/2021 08/30/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
08/25/2021
EROSION CONTROL REQUIRED ALONG THE STREET. 8/30-STOP-WORK ORDER ISSUED
Erosion Control Inspection Residential Passed 9/17/2021 9/17/2021 09/17/2021
DCM3 ESC REQUIRED 2 DAY
Resolved
09/17/2021
EROSION CONTROL REQUIRED ALONG THE STREET. 8/30-STOP-WORK ORDER ISSUED
Electrical Service Inspection Failed 12/28/2021 12/28/2021 12/28/2021
Misc
Corrective Action Required
12/28/2021
-Install covers at SE conductor connections to main breaker -Ground electrical service to water line with #4 cu GEC
Gas Service Inspection - Residential Passed 12/28/2021 12/28/2021 12/28/2021
All Rough Inspection - Residential Failed 12/28/2021 12/28/2021 12/28/2021
Misc
Corrective Action Required
12/28/2021
-Install garage PFH tension straps and nail sheathing per code -Install windows -Nail corner studs per code -Notched garage ceiling trimmer joist exceed max 1/6 limit -Support ridge and hip rafters above garage. Have engineer address installation of beams necessary for roof support. Nail together rafters to ceiling joists -Support hip rafter above laundry at mid-span to bearing wall -Protect wiring at laundry bottom and top wall plates; at living room bottom wall plate -Fb wall plate penetrations -Strap wall top plates lapped less than 24” in master closet -Install plumbing vent roof flashings -Fb master bedroom/living room wall from roof -Frame, strap, and nail CSPF walls at rear master bedroom per plan; Install (3)2x10 header; Shim gap at jack stud support for master bedroom header; -Complete installing electrical fireplace -Fb dead space at master bedroom door/stair -Install collar ties per code -Brace ends of roof lvl beam against rotation -Repair torn vapor barrier -Reinstall electrical at rear dining and kitchen wall -Frame 16” PFH walls at rear dining per plan -Support valley rafters above rear dining and rear porch hip rafters -Securely fasten SE cable within 12” of meter enclosure -Protect wiring at bathroom bottom wall plate -Fb bathroom tub wall; Fb stair/laundry wall from roof; Fb gaps at foyer wall -Provide a wall receptacle at foyer/garage wall. Foyer side -Add another support strut for lvl hip to foyer/closet wall -Support rafters above entry -Support hip rafters above front bedroom -Roof support above front bedroom shall be landed to bearing wall -Provide 48” GB interior wall bracing per plan -Protect 3” DVW at basement bedroom -Provide min 12” light clearance from basement closet storage space -Toe nail all joists to basement sill plates per code -Relocate steel column (below foyer)to correct location -Solid block joist ends at I beam -Frame support wall to grade beam -Provide joist hangers at (3)2x10 connections -Provide full support for (3)2x10 beam near stair wall/column -Move ducting directly above service panel out of electrical dedicated space -Install (4)2x4 stud directly underneath the kitchen I beam point load down to grade beam **DO NOT INSULATE
All Rough Inspection - Residential Failed 3/9/2022 3/9/2022 03/09/2022
Misc
Corrective Action Required
12/28/2021
-Install garage PFH tension straps and nail sheathing per code **nail sheathing and install the tension strap at the portal side. Look at the plan -Notched garage ceiling trimmer joist exceed max 1/6 limit **reinstall electrical -Support ridge and hip rafters above garage. Have engineer address installation of beams necessary for roof support. Nail together rafters to ceiling joists **nail together the lvl beam; sister another rafter to the improperly cut rafter at valley connection near the lvl beam; install rafter ties per code when ceiling joists are not nailed to the rafters -Nail CSPF walls at rear master bedroom per plan **see the plan for nailing requirement. -Complete installing electrical fireplace **complete electrical -Brace ends of roof lvl beam against rotation -Repair torn vapor barrier -Frame 16” PFH walls at rear dining per plan **Have engineer address this -Securely fasten SE cable within 12” of meter enclosure -Protect wiring at bathroom bottom wall plate -Fb bathroom tub wall; Fb stair/laundry wall from roof; Fb gaps at foyer wall -Provide a wall receptacle at foyer/garage wall. Foyer side -Support hip rafters above front bedroom **the wall where the roof beam lands on is not a bearing wall; reinstall ceiling light electrical -Roof support above front bedroom shall be landed to bearing wall -Provide 48” GB interior wall bracing per plan -Provide min 12” light clearance from basement closet storage space **this is required for surface mounted led luminaire. You either move the light box now or move it at the final inspection. Your choice -Toe nail all joists to basement sill plates per code -Relocate steel column (below foyer)to correct location -Solid block joist ends at I beam -Frame support wall to grade beam **see the plan. This wall is on the same plane as the stair wall -Provide joist hangers at (3)2x10 connections -Provide full support for (3)2x10 beam near stair wall/column -Move ducting directly above service panel out of electrical dedicated space -Install (4)2x4 stud directly underneath the kitchen I beam point load down to grade beam **the I beam is a little bit short and not bearing directly to the grade beam below . Have engineer address this **DO NOT INSULATE
All Rough Inspection - Residential Not Ready 4/12/2022 4/12/2022 04/12/2022
Misc
Corrective Action Required
03/09/2022
-Install garage PFH tension straps and nail sheathing per code **Install the tension strap at the portal side. Look at the plan page 6 -Support ridge and hip rafters above garage. Have engineer address installation of beams necessary for roof support. Nail together rafters to ceiling joists **nail together the lvl beam; sister another rafter to the improperly cut rafter at valley connection near the lvl beam; install rafter ties per code when ceiling joists are not nailed to the rafters -Nail CSPF walls at rear master bedroom per plan **see the plan for nailing requirement. -Brace ends of roof lvl beam against rotation -Frame 16” PFH walls at rear dining per plan **Have engineer address this -Fb bathroom tub wall; Fb gaps at top of foyer wall -Support hip rafters above front bedroom **Reinstall ceiling light electrical -Provide 48” GB interior wall bracing per plan -Provide min 12” light clearance from basement closet storage space **not done -Toe nail all joists to basement sill plates per code -Frame support wall to grade beam **see the plan. This wall is on the same plane as the stair wall -The kitchen I beam is short of the grade beam below. Have engineer address this **DO NOT INSULATE **4/12-REINSPECTION FEE ASSESSED FOR 3RD AND SUBSEQUENT FAILED INSPECTION
Electrical Service Inspection Failed 4/12/2022 04/12/2022
Misc
Corrective Action Required
12/28/2021
-Install covers at SE conductor connections to main breaker -Ground electrical service to water line with #4 cu GEC
Driveway Inspection Partial 4/7/2022 4/14/2022 04/14/2022
Misc
Informational
04/14/2022
Driveway was framed up with aggregate in and compacted. 4/14/22 ES
Driveway Inspection Partial 4/22/2022 4/22/2022 04/25/2022
Misc
Informational
04/14/2022
Driveway was framed up with aggregate in and compacted. 4/14/22 ES
Misc
Informational
04/25/2022
Driveway meets LS and Ada specs. 4/22/22 ES
Driveway Inspection Passed 3/1/2023 04/25/2022
Misc
Informational
04/25/2022
Driveway was framed up with aggregate in and compacted. 4/14/22 ES
Misc
Informational
04/25/2022
Driveway meets LS and Ada specs. 4/22/22 ES
All Rough Inspection - Residential Failed 4/26/2022 4/26/2022 04/26/2022
Misc
Corrective Action Required
04/12/2022
-Install garage PFH tension straps and nail sheathing per code **Install the tension strap at the portal side. Look at the plan page 6 -Support ridge and hip rafters above garage. Have engineer address installation of beams necessary for roof support. Nail together rafters to ceiling joists **nail together the lvl beam; sister another rafter to the improperly cut rafter at valley connection near the lvl beam; install rafter ties per code when ceiling joists are not nailed to the rafters -Nail CSPF walls at rear master bedroom per plan **see the plan for nailing requirement. -Brace ends of roof lvl beam against rotation -Frame 16” PFH walls at rear dining per plan. **Reinstall electrical -Fb bathroom tub wall; Fb gaps at top of foyer wall **you need to install 2x lumber at top of the fur out wall -Support hip rafters above front bedroom **Reinstall ceiling light electrical -Provide 48” GB interior wall bracing per plan -Provide min 12” light clearance from basement closet storage space **not done -Toe nail all joists to basement sill plates per code -Frame support wall to grade beam **see the plan. This wall is on the same plane as the stair wall **DO NOT INSULATE **4/12-REINSPECTION FEE ASSESSED FOR 3RD AND SUBSEQUENT FAILED INSPECTION **4/26- I NEED TO MEET WITH SOMEBODY
Electrical Service Inspection Failed 4/26/2022 4/26/2022 04/26/2022
Misc
Corrective Action Required
04/12/2022
-Install covers at SE conductor connections to main breaker -Ground electrical service to water line with #4 cu GEC
All Rough Inspection - Residential Failed 4/27/2022 04/27/2022
Misc
Corrective Action Required
04/26/2022
-Install garage PFH tension straps and nail sheathing per code **Install the tension strap at the portal side. Look at the plan page 6 -Support ridge and hip rafters above garage. Have engineer address installation of beams necessary for roof support. Nail together rafters to ceiling joists **sister another rafter to the improperly cut rafter at valley connection near the lvl beam; install rafter ties per code when ceiling joists are not nailed to the rafters -Brace ends of roof lvl beam against rotation -Frame 16” PFH walls at rear dining per plan. **Reinstall electrical -Fb bathroom tub wall; Fb gaps at top of foyer wall **you need to install 2x lumber at top of the fur out wall -Support hip rafters above front bedroom **Reinstall ceiling light electrical -Provide 48” GB interior wall bracing per plan -Provide min 12” light clearance from basement closet storage space **not done -Frame support wall to grade beam **see the plan. This wall is on the same plane as the stair wall **DO NOT INSULATE **4/12-REINSPECTION FEE ASSESSED FOR 3RD AND SUBSEQUENT FAILED INSPECTION **4/26- I NEED TO MEET WITH SOMEBODY
Electrical Service Inspection Passed 4/29/2022 4/29/2022 04/29/2022
Misc
Resolved
04/29/2022
-Install covers at SE conductor connections to main breaker -Ground electrical service to water line with #4 cu GEC
All Rough Inspection - Residential Not Ready 4/29/2022 4/29/2022 04/29/2022
Misc
Corrective Action Required
04/27/2022
***PROVIDE ADDRESS BEFORE ANY FURTHER ISPECTIONS*** -Install garage PFH tension straps and nail sheathing per code **Install the tension strap at the portal side. Look at the plan page 6-ATTACH THESE STRAPS TO FULL LENGTH JACK STUDS AND REPAIR DAMAGED STUDS -Support ridge and hip rafters above garage. Have engineer address installation of beams necessary for roof support-NO LETTER ON FILE. Nail together rafters to ceiling joists, install rafter ties per code when ceiling joists are not nailed to the rafters-NOT COMPLETE -Brace ends of roof lvl beam against rotation - NOT COMPLETE -Frame 16” PFH walls at rear dining per plan. **Reinstall electrical- PLEASE SEE DETAIL FOR PFH ON THE HOLD DOWN INSTALLATION, SEAL PLATE PENETRATIONS -Fb gaps at top of foyer wall-SEAL GAPS AND PLATE PENETRATIONS -Provide 48” GB interior wall bracing per plan **DO NOT INSULATE **4/12-REINSPECTION FEE ASSESSED FOR 3RD AND SUBSEQUENT FAILED INSPECTION **4/26- I NEED TO MEET WITH SOMEBODY **4/29- NOT READY
All Rough Inspection - Residential Failed 5/2/2022 5/2/2022 05/02/2022
Misc
Corrective Action Required
04/29/2022
-Provide 48” GB interior wall bracing per plan **OK TO ROCK **4/12-REINSPECTION FEE ASSESSED FOR 3RD AND SUBSEQUENT FAILED INSPECTION **4/26- I NEED TO MEET WITH SOMEBODY **4/29- NOT READY
Water Service Inspection - R Passed 8/1/2022 (10:45) 8/1/2022 08/01/2022
Sewer Service Inspection - R Passed 8/2/2022 (9:45) 8/2/2022 08/02/2022
Sidewalk Inspection Partial 9/6/2022 9/6/2022 09/07/2022
Misc
Informational
09/07/2022
9-6-22 AN forms are in place and aggregate is present and compacted
Sidewalk Inspection Partial 9/8/2022 9/8/2022 09/09/2022
Misc
Informational
09/07/2022
9-6-22 AN forms are in place and aggregate is present and compacted 9-9-22 AN sidewalk looks good and meets Ada spec
Footing Inspection - Residential Passed 12/28/2022
Informational
12/28/2022
FOOTING APPROVED BY ENGINEER
Occupancy Inspection - Codes Residential Failed 12/29/2022 12/29/2022 12/29/2022
Misc
Corrective Action Required
12/29/2022
**NO TCO ISSUED UNTIL EXPIRED TCOs FEES ARE PAID IN FULL AND PERMITS CLOSED OUT **NOT-READY FEES NOT PAID -Trees does not meet minimum size caliper as required per ordinance. See plot plan details -Obtain lawn irrigation permit and submit backflow valve test report to city -Underslab plumbing not inspected -From allrough: interior braced wall by GB method not inspected -Sidewalk not approved on record -Piers not inspected by city -Clean mud and debris from front storm inlet -Provide splash blocks at downspouts -Provide min 6” clearance from siding to grade. Grade at rear of house shall slope away from house min 6” at ten ft -Provide intersystem bonding block near electrical service -Provide sewer tracer wire port at grade -Garage door not self-closing -Provide graspable handrail at garage stair with 4 or more risers. Return handrail to wall or newel post at both ends -Provide 5/8” gypsum board attic access -Provide water hammering arrestors at clothes washer and dishwasher water outlets -Cap off open plumbing in basement -Anchor steel column to floor -Secure NM wiring every 4.5 ft or less (at the steel column above) -Fb basement from garage at I beam pocket -Provide backflow preventer at basement hose Bibb -Secure pex water line to wall -Install backflow preventer at hose bibb -Remove abandoned water grounding conductor from service panel -Provide breaker lock for out of sight water heater **Note: future basement bedroom rough-ins completed and ready for finish. Permit is required when basement is finished
Sidewalk Inspection Passed 3/1/2023 03/01/2023
Misc
Informational
09/09/2022
9-6-22 AN forms are in place and aggregate is present and compacted 9-9-22 AN sidewalk looks good and meets Ada spec
Misc
Informational
03/01/2023
Sidewalk meets all standards and specs.
Occupancy Inspection - Codes Residential Failed 3/9/2023 3/9/2023 03/09/2023
Misc
Corrective Action Required
12/29/2022
-Underslab plumbing not inspected **Engineer cannot approve this. Please contact Mark Harding -From allrough: interior braced wall by GB method not inspected **Need to verify the screws pattern -Secure NM wiring every 4.5 ft or less **above the steel column that you just anchored to floor -Provide backflow preventer at basement hose Bibb **Twist off the set screw **See below. Either obtain basement finish permit or disconnect all electrical from this future room from power panel **Note: future basement bedroom rough-ins completed and ready for finish. Permit is required when basement is finished
All Rough Inspection - Residential Passed 03/10/2023
Misc
Resolved
03/10/2023
-Provide 48” GB interior wall bracing per plan **OK TO ROCK **4/12-REINSPECTION FEE ASSESSED FOR 3RD AND SUBSEQUENT FAILED INSPECTION **4/26- I NEED TO MEET WITH SOMEBODY **4/29- NOT READY
Occupancy Inspection - Codes Residential Full C of O 3/10/2023 03/10/2023
Misc
Resolved
03/10/2023
**See below. Either obtain basement finish permit or disconnect all electrical from this future room from power panel **Note: future basement bedroom rough-ins completed and ready for finish. Permit is required when basement is finished
Documents & Images
Date Uploaded File Type Document Name
05/03/2021 Application Form Permit Application
05/03/2021 Application Form License Tax Form
05/04/2021 Permit Codes Residential Plan Review
05/04/2021 Plot Plan Approved Plot Plan
05/04/2021 Codes Residential Plan Review (2) Monticello 78 from city 050421 With Responses
05/05/2021 Drawing Approved Drawings
05/05/2021 Permit Codes Residential Plan Review
06/07/2021 Permit DS Building Permit
06/07/2021 Receipt Receipt for transaction:2021-004073
06/21/2021 Garys Fndn 1121 NE Goshen Ct Lee's Summit Mo Footing Inspectopm Report 6-21-21
08/25/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
08/30/2021 Letter Stop Work Order
08/30/2021 Letter Stop Work Order
09/17/2021 Letter INSPECTION SUMMARY
12/28/2021 Letter INSPECTION SUMMARY
12/28/2021 Letter INSPECTION SUMMARY
12/28/2021 Letter INSPECTION SUMMARY
03/09/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/12/2022 Letter INSPECTION SUMMARY
04/14/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
04/25/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/26/2022 Letter INSPECTION SUMMARY
04/27/2022 Letter INSPECTION SUMMARY
04/29/2022 Letter INSPECTION SUMMARY
04/29/2022 Letter INSPECTION SUMMARY
05/02/2022 WELDERS CERT_ DAN
05/02/2022 Letter INSPECTION SUMMARY
08/01/2022 Letter INSPECTION SUMMARY
08/02/2022 Letter INSPECTION SUMMARY
09/07/2022 Letter INSPECTION SUMMARY
09/09/2022 Letter INSPECTION SUMMARY
12/28/2022 Letter INSPECTION SUMMARY
12/29/2022 Letter INSPECTION SUMMARY
02/28/2023 Final_2022_04_15_DPier_LSMO_Pat Cochran Concrete
03/01/2023 Letter INSPECTION SUMMARY
03/09/2023 Engineer Letter - Ground Rough Plumbing Inspection Report Sealed 9-9-21
03/09/2023 Engineer Letter - GB Drywall Inspection Report Sealed 5-9-22
03/09/2023 Receipt Receipt for transaction:2023-001310
03/10/2023 Letter INSPECTION SUMMARY
03/10/2023 Letter INSPECTION SUMMARY
03/10/2023 Letter DRHI - Monticello 78 - Plumbing Letter for Inspector Khan
03/10/2023 DRHI - Monticello 78 - Plumbing Letter for Inspector Khan
03/10/2023 Letter INSPECTION SUMMARY
03/10/2023 Letter Field Certificate of Occupancy
03/10/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home