Summary
PRRES20211374
Building Permit - Residential
Certificate of Occupancy
ACH DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED DECK
03/25/2021
04/07/2021
07/05/2022
Locations
Contacts
ACH DEVELOPMENT LLC, Address:3170 NE CARNEGIE DR STE 400  
ROBERTSON REMODELING LLC, Address:500 James Rollo Dr, Phone:(816) 506-4090  
LEVIROBERTSON@SBCGLOBAL.NET  
R-MECH HEATING COOLING PLUMBING/RHODES HEATING COOLING PLUMBING AND ROOTER, Address:1425 AGNES AVE, Phone:(816) 920-5955  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
TRI-COUNTY PLUMBING LLC, Address:PO BOX 234, Phone:(816) 720-3222  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 04/06/2021 04/02/2021
Brandon Kalwei
Plot Plan Review Approved 04/06/2021 04/02/2021
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,425.84 $1,425.84 Paid 04/07/2021
8331507-Sewer Connection Fee $480.00 $480.00 Paid 04/07/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 04/07/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 04/07/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 04/07/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 04/07/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 4/22/2021 (11:30) 4/22/2021 04/22/2021
Underslab Plumbing Inspection - Residential Passed 5/12/2021 5/12/2021 05/12/2021
All Rough Inspection - Residential Failed 7/28/2021 7/28/2021 07/28/2021
Informational
07/28/2021
-GARAGE PFH WALLS NAILING OK. INSTALL STRAPS INSIDE
Sewer Service Inspection - R Passed 8/4/2021 (1:45) 8/4/2021 08/04/2021
Water Service Inspection - R Passed 8/5/2021 (10:00) 8/5/2021 08/05/2021
All Rough Inspection - Residential Failed 10/21/2021 10/21/2021 10/21/2021
Misc
Corrective Action Required
10/21/2021
-Nailing missing stud at rear garage corner; nail siding to sill plates -Install 3 stud support for lvl at master closet exterior wall -Fully nail the triple joist hanger and single joist hanger to lvl beam at master closet -Provide full support for beams at master shower down to foundation wall below -Fasten together the 4x beam above master bathroom -Fb the fireplace space from master bedroom ceiling soffit with 3/4” sheathing or fiberglass -Provide 2 king studs at both ends of great room window -Install 2 stud at stair -Strap porch roof beams to wall per 10/S3.2 -Seal penetrations of ceiling return air space above laundry -Fb laundry wall from joist space -Install hangers above pantry -Remove all items from wall for inspection -Double all joists under bedroom 2 closet -Install 4 stud support for 16” roof beam outside bedroom 3 -Brace ends of lvl beam from rotation -Block off the return air space from fireplace flue space at bedroom 4 -Shim excessive gap at rafter-to-ridge connections above foyer **OK TO INSULATE
Electrical Service Inspection Passed 10/21/2021 10/21/2021
Gas Service Inspection - Residential Passed 10/21/2021 10/21/2021
All Rough Inspection - Residential Failed 11/3/2021 11/3/2021 11/03/2021
Misc
Corrective Action Required
10/21/2021
-Nail the rear garage corner wall to sill plates @6” oc -Fb the fireplace space from master bedroom ceiling soffit with 3/4” sheathing or fiberglass -Strap porch roof beams to wall per 10/S3.2 **Not per 10/S3.2 detail. Have your engineer ok with the current strappings. Email exchange is ok. No need for letter -Fb laundry wall from joist space **Fb the top of the fur out laundry wall -Block off the return air space from fireplace flue space at bedroom 4 **Due to the curvature of the Thermopan, there’s still a gap at the top. Just use a 2x4 **OK TO INSULATE
All Rough Inspection - Residential Failed 12/1/2021 12/1/2021 12/01/2021
Misc
Corrective Action Required
11/03/2021
-Nail the garage wall siding at front to sill plates @6” oc -Fb the fireplace space from master bedroom ceiling soffit with 3/4” sheathing or fiberglass ** send me a picture when you are done. The sheathing used for fire blocking at soffit wall is 7/16”. Should use 3/4” nominal sheathing or just fill in the soffit wall with insulation **OK TO ROCK
Driveway Inspection Partial 12/13/2021 12/13/2021
Misc
Informational
12/13/2021
12-13-21 AN forms are in place and aggregate is present and compacted, no sidewalk
Driveway Inspection Passed 12/17/2021 12/17/2021 12/20/2021
Misc
Informational
12/13/2021
12-13-21 AN forms are in place and aggregate is present and compacted, no sidewalk
Misc
Informational
12/20/2021
Driveway meets LS specs. 12/20/21 ES
All Rough Inspection - Residential Passed 04/21/2022
Misc
Resolved
04/21/2022
-Nail the garage wall siding at front to sill plates @6” oc -Fb the fireplace space from master bedroom ceiling soffit with 3/4” sheathing or fiberglass ** send me a picture when you are done. The sheathing used for fire blocking at soffit wall is 7/16”. Should use 3/4” nominal sheathing or just fill in the soffit wall with insulation **OK TO ROCK
Piers/Caissons Inspection - Residential Passed 04/21/2022
Informational
04/21/2022
PATIO PIERS INSPECTED AND APPROVED BY ENGINEER
Occupancy Inspection - Codes Residential Failed 4/21/2022 4/21/2022 04/21/2022
Misc
Corrective Action Required
04/21/2022
-Final grade, sod, downspout and sump pump extension -Seal exterior wall penetrations; seal above meter, AC disconnect, seal exterior lights, etc -Provide sewer tracer wire port at grade -Install secondary lock for the slide doors -Complete installing receptacle at rear great room wall -Install metal screen in front of fireplace -Provide receptacle spacing per code for cabinet with countertop left side of fireplace -Install bedroom window cranks -Pendant light not allowed within master bathroom tub zone -Install cover for closet light at rear 2nd fl corner bedroom
Occupancy Inspection - Codes Residential Temporary C of O 4/22/2022 4/22/2022 04/22/2022
Misc
Corrective Action Required
04/21/2022
-Final grade, sod, downspout and sump pump extension -Provide sewer tracer wire port at grade -Provide receptacle spacing per code for cabinet with countertop left side of fireplace
Occupancy Inspection - Codes Residential Full C of O 07/05/2022
Misc
Resolved
07/05/2022
-Final grade, sod, downspout and sump pump extension -Provide sewer tracer wire port at grade
Documents & Images
Date Uploaded File Type Document Name
03/25/2021 Application Form APPLICATION
04/02/2021 LOT 308 FINAL survey
04/02/2021 PKR308 Spec - Sealed Plans (March 8, 2021)
04/02/2021 Approved Plans APPROVED PLANS
04/02/2021 Plot Plan APPROVED PLOT PLAN
04/07/2021 Receipt Receipt for transaction:2021-001804
04/07/2021 Letter DS Building Permit
04/22/2021 Letter INSPECTION SUMMARY
05/12/2021 Letter INSPECTION SUMMARY
06/08/2021 1917 Catalina 3rd Party Pier Inspection
07/28/2021 Letter INSPECTION SUMMARY
08/04/2021 Letter INSPECTION SUMMARY
08/05/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
10/21/2021 Letter INSPECTION SUMMARY
10/26/2021 1917 NE Catalina Ave - Structural Letter (October 26, 2021)
11/03/2021 Letter INSPECTION SUMMARY
12/01/2021 Letter INSPECTION SUMMARY
12/10/2021 Engineer Report/Study 1917 NE Catalina Ave - Structural Letter (November 16, 2021)
12/13/2021 Letter INSPECTION SUMMARY
12/20/2021 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
04/21/2022 Letter INSPECTION SUMMARY
04/22/2022 Letter Codes Temporary Certificate of Occupancy
07/05/2022 Letter Field Certificate of Occupancy
07/05/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home