Summary
PRRES20210699
Building Permit - Residential
Certificate of Occupancy
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC
NEW SINGLE FAMILY
NEW HOUSE - FINISHED AND UNFINISHED BASEMENT -
02/22/2021
03/11/2021
01/13/2023
Locations
Contacts
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC, Address:13450 E STATE ROUTE 150  
NICK ZVACEK CONSTRUCTION LLC, Address:1009 INDUSTRIAL DR, Phone:(816) 213-7204  
NZVACEK@GMAIL.COM  
COMFORT SYSTEMS HTG/CLG, Address:128 W Markey Rd, Phone:(816) 322-1013  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 02/26/2021 02/25/2021
Brandon Kalwei
Residential Plan Review Approved 02/26/2021 02/24/2021
Brandon Kalwei
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,277.80 $1,277.80 Paid 03/11/2021
8331507-Sewer Connection Fee $600.00 $600.00 Paid 03/11/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 03/11/2021
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 03/11/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 03/11/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 03/11/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 3/15/2021 3/15/2021 03/15/2021
Sewer Service Inspection - R Passed 4/1/2021 04/01/2021
Water Service Inspection - R Partial 4/1/2021 04/01/2021
Misc
Informational
04/01/2021
-PARTIAL INSPECTION ON PEX
Water Service Inspection - R Passed 4/2/2021 (9:45) 4/2/2021 04/02/2021
Misc
Resolved
04/02/2021
-PARTIAL INSPECTION ON PEX
Underslab Plumbing Inspection - Residential Passed 4/2/2021 4/2/2021 04/02/2021
Piers/Caissons Inspection - Residential Passed 4/13/2021 (8:00) 4/13/2021 04/13/2021
Erosion Control Inspection Residential Failed 6/25/2021 6/25/2021 06/25/2021
Misc
Corrective Action Required
06/25/2021
-MAINTAIN EORSION CONTROL ON LOT
Electrical Service Inspection Passed 7/14/2021 7/14/2021 07/14/2021
Gas Service Inspection - Residential Failed 7/14/2021 7/14/2021 07/14/2021
Misc
Corrective Action Required
07/14/2021
-GAS PRESSURE GAUGE AT 0 PSI, MUST MAINTAIN 10 PSI FOR TEST
All Rough Inspection - Residential Failed 7/14/2021 7/14/2021 07/14/2021
Misc
Corrective Action Required
07/14/2021
-Maintain weeds and grass on lot -Have city stamped plans on site at reinspect, corrections list subject to change -seal NM penetration at fireblock, garage wall at furred down -Support all vertical DWV 2” or less at mid point -Support DWV every 48” o.c., traps not considered support -Complete bath exhaust flex duct- front bath at front door, master bath, 2nd floor bath -fireblock vertical to horizontal at laundry furred down -Fireblock deadspace at master bath/laundry wall -seal all top plate penetrations - see master bath, pantry, loft 2nd floor -Nail all ceiling joist hangers-see above master bath, dbl joist above kitchen island -Add stud shoe at master shower wall for DWV -Fireblock at HVAC chase master shower -Add bocca protection plate at bottom plate DWV kitchen/fridge -Cannot inspect covered deck due to siding lid-remove panel to allow for inspection of framing -Fireblock at fireplace wall, master bed side open to attic space -Complete DWV above media room 1st floor -Purlin support at media room wall per plans -(4) stud pack at master bath 9 1/4” lvl 1st floor per plans -Shim top plate at lvl bearing end kitchen to allow for bearing on full stud pack -(4) stud pack at W14x22 steel beam ends at garage per plans -seal penetrations through return air bedroom#2 2nd floor and finished basement -Ensure proper slope at DWV vent line along ceiling joists 2nd floor attic -security blocking at basement walkout -Bocca protection plate at DWV bottom plate basement wet bar and basement bath -Add Jack stud at basement 2x10 walkout/den header, North side of header -Complete DWV unfinished basement near service panel and unfinished area near furnace -Insulate first and then solid block between the joists at cantilevers -Anchor steel columns to floor at basement -Nail exterior sheathing per plans -Deck ledger attachment per code -(2) 1/2” through bolts required at each post/beam connection per code
Gas Service Inspection - Residential Failed 7/28/2021 7/28/2021 07/28/2021
Misc
Corrective Action Required
07/14/2021
-GAS PRESSURE GAUGE AT 0 PSI, MUST MAINTAIN 10 PSI FOR TEST no gauge 2nd inspection
All Rough Inspection - Residential Failed 7/28/2021 7/28/2021 07/28/2021
Misc
Corrective Action Required
07/14/2021
-Maintain weeds and grass on lot -Have city stamped plans on site at reinspect, corrections list subject to change *** no city stamp on plans recall for inspection. -seal NM penetration at fireblock, garage wall at furred down -Fireblock deadspace at master bath/laundry wall -seal all top plate penetrations - see master bath, pantry, loft 2nd floor ,,, incomplete -Fireblock at HVAC chase master shower , open to garage chase. -Cannot inspect covered deck due to siding lid-remove panel to allow for inspection of framing *** support roof framing per plans , 2x12's canitlevered. -Purlin support at media room wall per plans , -(4) stud pack at master bath 9 1/4” lvl 1st floor per plans -Shim top plate at lvl bearing end kitchen to allow for bearing on full stud pack -(4) stud pack at W14x22 steel beam ends at garage per plans --missing beam post storage area basement. -seal penetrations through return air bedroom#2 2nd floor and finished basement -security blocking at basement walkout -Bocca protection plate at DWV bottom plate basement wet bar and basement bath -Add Jack stud at basement 2x10 walkout/den header, North side of header -Complete DWV unfinished basement near service panel and unfinished area near furnace , incomplete, support pex piping also. -Insulate first and then solid block between the joists at cantilevers ,, no blocking. -Nail exterior sheathing per plans -Deck ledger attachment per code -(2) 1/2” through bolts required at each post/beam connection per code
Gas Service Inspection - Residential Passed 8/12/2021 8/12/2021 08/12/2021
Misc
Resolved
08/12/2021
All Rough Inspection - Residential Passed 8/12/2021 8/12/2021 08/12/2021
Misc
Informational
08/12/2021
CORRECTIONS BELOW WILL MOVE TO OCCUPANCY INSPECT TO CHECK WITH COMPLETE DECK -Deck ledger attachment per code -(2) 1/2” through bolts required at each post/beam connection per code
Occupancy Inspection - Codes Residential Failed 8/12/2021 08/12/2021
Misc
Corrective Action Required
08/12/2021
CORRECTIONS BELOW MOVED FROM ALL ROUGH TO OCCUPANCY, CHECK WITH COMPLETED DECK -Deck ledger attachment per code -(2) 1/2” through bolts required at each post/beam connection per code
Sidewalk Inspection Passed 12/2/2021 12/2/2021 12/03/2021
Misc
Informational
12/02/2021
On Thursday 12/2/2021 I performed a sidewalk inspection and pass the subgrade to pour concrete
Driveway Inspection Passed 12/2/2021 12/2/2021 12/03/2021
Misc
Informational
12/02/2021
On Thursday 12/2/2021 I performed a driveway inspection and pass the subgrade to pour concrete
Plot Plan Inspection Passed 2/23/2022 02/23/2022
Erosion Control Inspection Residential Failed 2/23/2022 02/23/2022
Misc
Resolved
02/23/2022
-MAINTAIN EORSION CONTROL ON LOT
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
02/23/2022
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Failed 2/23/2022 2/23/2022 02/23/2022
Misc
Corrective Action Required
08/12/2021
NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS IN COMPLIANCE -seal top of meter can, A/c disconnect and all other exterior penetrations -splash blocks and sump pump discharge to be 36” from foundation -address deck post to beam connection (2) 1/2” through bolts required at each post/beam connection per code -sod -complete sidewalk &driveway inspections -guard rail at front stoop when more than 30” from ground 36” out -outlet required at counter space right and left of fireplace -handrail required at garage stairs -self closing door for garage owners entry -could not check all outlets in garage (to many items in the way) -handrail to basement installed -secure electrical water heater up and out of reach -security screws at back patio door hinges and strike plates -address guard rail not secured at deck near entry
Miscellaneous Inspection Passed 10/12/2022 10/12/2022
Misc
Informational
10/12/2022
spoke with wes who indicated he will be calling in for inspection soon. Mitchell Schwarz 10/12/2022 8:37 AM
Driveway Inspection Passed 1/9/2023 1/9/2023 01/09/2023
Misc
Informational
12/02/2021
On Thursday 12/2/2021 I performed a driveway inspection and pass the subgrade to pour concrete 1-9-22 RH. Driveway Meets LS and ADA specifcation.
Sidewalk Inspection Passed 1/9/2023 01/09/2023
Misc
Informational
01/09/2023
1-9-22 RH. Sidewalk meets LS and ADA specification.
Erosion Control Inspection Residential Passed 01/11/2023
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/11/2023
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Failed 1/11/2023 1/11/2023 01/11/2023
Misc
Corrective Action Required
02/23/2022
-address deck post to beam connection (2) 1/2” through bolts required at each post/beam connection per code -guard rail at front stoop when more than 30” from ground 36” out -security screws at back patio door hinges and strike plates
Occupancy Inspection - Codes Residential Failed 1/13/2023 1/13/2023 01/13/2023
Misc
Corrective Action Required
01/11/2023
-security screws at back patio door hinges and strike plates
Occupancy Inspection - Codes Residential Full C of O 01/13/2023
Misc
Resolved
01/13/2023
-security screws at back patio door hinges and strike plates
Documents & Images
Date Uploaded File Type Document Name
02/22/2021 Application Form APPLICATION
02/22/2021 Application Form excise tax
02/24/2021 Lot 52 2021-02-01
02/24/2021 3389
02/24/2021 Approved Plans APPROVED PLANS
02/25/2021 Plot Plan APPROVED PLOT PLAN
03/11/2021 Receipt Receipt for transaction: 2021-001230
03/13/2021 M L Crose 3109 Sw Blue Ribbon St LSMO Summit View Farms Lot 52 Zvacek P 2021-0699 Footing Inspection Report 3-10-21
03/15/2021 Letter INSPECTION SUMMARY
04/01/2021 Letter INSPECTION SUMMARY
04/01/2021 Letter INSPECTION SUMMARY
04/02/2021 Letter INSPECTION SUMMARY
04/02/2021 Letter DS Building Permit
04/02/2021 Letter INSPECTION SUMMARY
04/13/2021 Letter INSPECTION SUMMARY
06/25/2021 Letter INSPECTION SUMMARY
07/14/2021 Letter INSPECTION SUMMARY
07/14/2021 Letter INSPECTION SUMMARY
07/14/2021 Letter INSPECTION SUMMARY
07/28/2021 Letter INSPECTION SUMMARY
07/28/2021 Letter INSPECTION SUMMARY
08/12/2021 Letter INSPECTION SUMMARY
08/12/2021 Letter INSPECTION SUMMARY
08/12/2021 Letter INSPECTION SUMMARY
12/02/2021 Letter INSPECTION SUMMARY
12/02/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/03/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
02/23/2022 Letter INSPECTION SUMMARY
08/22/2022 Letter Codes 180 Day Letter
01/09/2023 Letter INSPECTION SUMMARY
01/09/2023 Letter INSPECTION SUMMARY
01/11/2023 Letter INSPECTION SUMMARY
01/11/2023 Letter INSPECTION SUMMARY
01/13/2023 Letter INSPECTION SUMMARY
01/13/2023 Letter INSPECTION SUMMARY
01/13/2023 Letter Field Certificate of Occupancy
01/13/2023 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home