Summary
PRRES20210630
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO TILE ROOF SWALE BETWEEN THE LOTS TO DRAIN TO THE STREET
02/16/2021
02/18/2021
06/17/2022
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
Reliable Mechanical Services, Inc. , Address:1025 W Couchman Dr.  
MIKE@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review (RES) Approved 02/22/2021 02/18/2021
Shannon McGuire
Plot Plan Review Approved 02/19/2021 02/18/2021
Kim Brennan
Residential Plan Review Approved 02/19/2021 02/18/2021
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $901.33 $901.33 Paid 02/18/2021
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 02/18/2021
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 02/18/2021
8350015-Water Meter Fee $455.54 $455.54 Paid 02/18/2021
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 02/18/2021
8331507-Sewer Connection Fee $360.00 $360.00 Paid 02/18/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 01/11/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 01/11/2022
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 01/11/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 01/11/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 3/30/2021 03/30/2021
Misc
Corrective Action Required
03/30/2021
- PROVIDE (2) #4 BARS CONTINUOUS PER PLAN OR PROVIDE HELIX OPTION DETAIL -
Footing Inspection - Residential Passed 4/2/2021 04/02/2021
Misc
Resolved
04/02/2021
- 3rd party footing by derek perez @ res signed & sealed by bradley huxol - - UFER LOCATED IN CENTER OF NORTH (REAR) GARAGE FOUNDATION WALL -
Underslab Plumbing Inspection - Residential Passed 5/21/2021 5/21/2021 05/21/2021
All Rough Inspection - Residential Failed 8/12/2021 8/12/2021 08/12/2021
Miscellaneous Correction
Corrective Action Required
08/12/2021
-Seal all top and bottom plate penetrations and all through floor penetrations -Seal all gaps in dead space fireblocking -Tighten all anchor bolts -Seal garage foundation wall at beam pocket -Attic access required at single car bay -Attic access in 2 car bay requires 30" of clearance -Strap top plates at garage/ entry wall where plates overlap less than 24" -Provide stud shoes at studs bored over 40% at great room window -Fireblock tub traps -Have engineer address field repaired broken trusses B3 and B5 at garage -Missing LIB 3 locations circled on plans -Complete braced wall detail blocking at top, bottom, and midpoint of windows at dining and great room -Unable to verify WSP nailing pattern thoughout -Address walls closer than 5' fire separation requiring 1 hour fire resistance rating per R302
Gas Service Inspection - Residential Passed 8/23/2021 8/23/2021 08/23/2021
Electrical Service Inspection Passed 8/23/2021 8/23/2021 08/23/2021
Sewer Service Inspection - R Passed 9/14/2021 09/14/2021
All Rough Inspection - Residential Failed 9/15/2021 9/15/2021 09/15/2021
Miscellaneous Correction
Corrective Action Required
08/12/2021
-Tighten all anchor bolts **one in the 1-car garage not tighten down -Attic access required at single car bay **Does not have the required 30" of headroom clearance from the 2-car attic access to the 1-car roof space -Have engineer address field repaired broken trusses B3 and B5 at garage **not only the truss members were broken, the gusset at joint was torn out as well. Have engineer address fix for this truss -Missing LIB 3 locations circled on plans **not done per plan -Complete braced wall detail blocking at top, bottom, and midpoint of windows at dining and great room **at rear dining, you must install a stud at end of the CSPF corner-to-corner lvl in order for the braced wall to work as the code prescribes -Nail exterior wall sheathing per code. The sheathing is not nailed to sill plates. Check throughout for proper nailing -Address walls closer than 5' fire separation requiring 1 hour fire resistance rating per R302 **Fb excessive gap at roof soffit solid-blocking to meet the intent of the code
Water Service Inspection - R Passed 9/16/2021 (8:45) 9/16/2021 09/16/2021
All Rough Inspection - Residential Not Ready 9/23/2021 9/23/2021 09/23/2021
Miscellaneous Correction
Corrective Action Required
09/15/2021
-Attic access required at single car bay **Does not have the required 30" of headroom clearance from the 2-car attic access to the 1-car roof space -Have engineer address field repaired broken trusses B3 and B5 at garage **not only the truss members were broken, the gusset at joint was torn out as well. Have engineer address fix for this truss ( B5 REPAIR COMPLETE, B3 & 2 TRUSSES NEED WORK ) -Missing LIB 3 locations circled on plans **not done per plan ( no plans on site or in curb box ) -Nail exterior wall sheathing per code. The sheathing is not nailed to sill plates. Check throughout for proper nailing -Address walls closer than 5' fire separation requiring 1 hour fire resistance rating per R302 **Fb excessive gap at roof soffit solid-blocking to meet the intent of the code ( PYRO GUARD AT SUMP DISCHARGE )
All Rough Inspection - Residential Not Ready 9/27/2021 9/27/2021 09/27/2021
Miscellaneous Correction
Corrective Action Required
09/23/2021
-Attic access required at single car bay **Does not have the required 30" of headroom clearance from the 2-car attic access to the 1-car roof space -Have engineer address field repaired broken trusses B3 and B5 at garage **not only the truss members were broken, the gusset at joint was torn out as well. Have engineer address fix for this truss ( B5 REPAIR COMPLETE, B3 & 2 TRUSSES NEED WORK ) -Missing LIB 3 locations circled on plans **not done per plan ( no plans on site or in curb box ) -Nail exterior wall sheathing per code. The sheathing is not nailed to sill plates. Check throughout for proper nailing -Address walls closer than 5' fire separation requiring 1 hour fire resistance rating per R302 **Fb excessive gap at roof soffit solid-blocking to meet the intent of the code ( PYRO GUARD AT SUMP DISCHARGE )
Misc
Corrective Action Required
09/27/2021
NO ACCESS SHOWED JOSH PYRO GUARD ISSUES ON EAST SIDE
Erosion Control Inspection Residential Failed 10/7/2021 10/07/2021
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
10/07/2021
STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
All Rough Inspection - Residential Not Ready 10/7/2021 10/7/2021 10/07/2021
Miscellaneous Correction
Corrective Action Required
09/27/2021
ATE OP PL-Attic access required at single car bay **Does not have the required 30" of headroom clearance from the 2-car attic access to the 1-car roof space -Have engineer address field repaired broken trusses B3 and B5 at garage **not only the truss members were broken, the gusset at joint was torn out as well. Have engineer address fix for this truss ( B5 REPAIR COMPLETE, B3 & 2 TRUSSES NEED WORK ) -Missing LIB 3 locations circled on plans **not done per plan ( NAIL LIBs THROUGHOUT ) -Nail exterior wall sheathing per code. The sheathing is not nailed to sill plates. Check throughout for proper nailing -Address walls closer than 5' fire separation requiring 1 hour fire resistance rating per R302 **Fb excessive gap at roof soffit solid-blocking to meet the intent of the code ( FIRE CAULK BLOCKING TOP PLATE TO ROOF DECK ) - COMPLETE EXHAUST FANS LAUNDRY ROOM -
Misc
Resolved
10/07/2021
NO ACCESS SHOWED JOSH PYRO GUARD ISSUES ON EAST SIDE
All Rough Inspection - Residential Passed 10/27/2021 10/27/2021 10/27/2021
Miscellaneous Correction
Resolved
10/27/2021
Driveway Inspection Partial 11/12/2021 11/12/2021 11/12/2021
Misc
Informational
11/12/2021
Driveway is framed up with aggregate in place and compacted. Needs one section of curb replaced in front of drive. 11/12 ES
Erosion Control Inspection Residential Failed 01/12/2022
DCM6 ESC INSP DENIED STREET CLEAN UP
Resolved
01/12/2022
STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED.
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
01/12/2022
**1-12-22 DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. -RESTORE EROSION CONTROL METHODS AT PERIMETER AND CLEAN MUD AND DEBRIS FROM STREET
Occupancy Inspection - Codes Residential Failed 1/12/2022 1/12/2022 01/12/2022
Misc
Corrective Action Required
01/12/2022
-Restore erosion control at perimeter and clean mud and debris from street before any further inspections -Obtain irrigation permit and backflow certification -Driveway inspection pending -Final grade and sod -Gutters, downspouts and downspout and sump extensions -Complete discharge line at dishwasher -Complete spindles at stairway -Complete DWV for master shower drain
Occupancy Inspection - Codes Residential Temporary C of O 1/21/2022 1/21/2022 01/21/2022
Misc
Corrective Action Required
01/12/2022
TCO UNTIL 3-25-22 -Maintain erosion control until sod is in place -Obtain irrigation permit and backflow certification -Driveway inspection pending -Final grade and sod -Gutters, downspouts and downspout and sump extensions
Erosion Control Inspection Residential Partial 01/21/2022
DCM2 ESC DEFICIENT INSTALLATION
Resolved
01/21/2022
Misc
Corrective Action Required
01/21/2022
-MAINTAIN EROSION CONTROL UNTIL SOD IS IN PLACE
Erosion Control Inspection Residential Passed 05/26/2022
Misc
Resolved
05/26/2022
Plot Plan Inspection Passed 5/27/2022 05/26/2022
Occupancy Inspection - Codes Residential Failed 5/26/2022 5/26/2022 05/26/2022
Misc
Corrective Action Required
01/21/2022
TCO UNTIL 3-25-22 -Driveway inspection pending , I have sent emails to set this up, but please follow up
Driveway Inspection Partial 05/26/2022
Misc
Informational
11/12/2021
Driveway is framed up with aggregate in place and compacted. Needs one section of curb replaced in front of drive. 11/12 ES
Misc
Corrective Action Required
05/26/2022
Section of curb on the east side of driveway was never replaced. Section will need to be removed and a new section poured. 5/26/22 ES
Driveway Inspection Failed 6/6/2022 6/6/2022 06/06/2022
Misc
Informational
05/26/2022
Driveway is framed up with aggregate in place and compacted. Needs one section of curb replaced in front of drive. 11/12 ES
Misc
Corrective Action Required
05/26/2022
Section of curb on the east side of driveway was never replaced. Section will need to be removed and a new section poured. 5/26/22 ES Curb still hasn’t been replaced. 6/6/22 ES
Driveway Inspection Passed 6/13/2022 6/13/2022 06/17/2022
Misc
Informational
06/06/2022
Driveway is framed up with aggregate in place and compacted. Needs one section of curb replaced in front of drive. 11/12 ES
Misc
Corrective Action Required
06/06/2022
Section of curb on the east side of driveway was never replaced. Section will need to be removed and a new section poured. 5/26/22 ES Curb still hasn’t been replaced. 6/6/22 ES
Misc
Informational
06/17/2022
Wes with Pat Cochran patched the concern areas to a satisfactory condition. 6/17/22 ES
Occupancy Inspection - Codes Residential Full C of O 6/15/2022 6/20/2022 06/17/2022
Misc
Resolved
06/17/2022
TCO UNTIL 3-25-22 -Driveway inspection pending , I have sent emails to set this up, but please follow up
Documents & Images
Date Uploaded File Type Document Name
02/16/2021 Application Form Permit Application and License Tax Form
02/18/2021 Approved Plans Approved Drawings
02/18/2021 Approved Plans Approved Truss Layout
02/18/2021 Approved Plans Approved Truss Package
02/18/2021 Plot Plan Approved Plot Plan
02/18/2021 Receipt Receipt for transaction:2021-000785
02/18/2021 Letter DS Building Permit
03/01/2021 Scope of Work Statement - W1 #43
03/01/2021 W1 #43 - Revised Torino - Mediterranean - Sheets- signed
03/01/2021 Approved Plans APPROVED PLANS
03/30/2021 Letter INSPECTION SUMMARY
04/01/2021 Lot 43 Woodside Ridge Footing Inspection
04/02/2021 Letter INSPECTION SUMMARY
05/21/2021 Letter INSPECTION SUMMARY
08/12/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
09/14/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/16/2021 Letter INSPECTION SUMMARY
09/20/2021 W1-43 Truss- SEALED REPAIRS 08262021
09/23/2021 Letter INSPECTION SUMMARY
09/27/2021 Letter INSPECTION SUMMARY
10/06/2021 Approved Plans Approved Truss Repair
10/07/2021 Letter INSPECTION SUMMARY
10/14/2021 Letter INSPECTION SUMMARY
10/22/2021 W1-43-- B2, B3, B5, B7 FULL REPAIR
10/27/2021 Letter INSPECTION SUMMARY
11/12/2021 Letter INSPECTION SUMMARY
01/11/2022 Receipt Receipt for transaction:2022-000191
01/12/2022 Letter INSPECTION SUMMARY
01/12/2022 Letter INSPECTION SUMMARY
01/21/2022 Letter Codes Temporary Certificate of Occupancy
01/21/2022 Letter INSPECTION SUMMARY
05/26/2022 APPROVED RETAINING WALL PLAN
05/26/2022 Plot Plan Approved As Graded Plot Plan
05/26/2022 Letter INSPECTION SUMMARY
05/26/2022 Letter INSPECTION SUMMARY
05/26/2022 Letter INSPECTION SUMMARY
05/26/2022 Letter INSPECTION SUMMARY
06/06/2022 Letter INSPECTION SUMMARY
06/17/2022 Letter INSPECTION SUMMARY
06/17/2022 Letter Field Certificate of Occupancy
06/17/2022 Letter Codes Final Certificate of Occupancy
07/21/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home