Summary
PRRES20204445
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSS - FINISHED BASEMENT - COVERED DECK
11/23/2020
12/21/2020
06/15/2021
08/26/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 12/23/2020 12/21/2020
Dylan Eppert
Easements
Corrective Action Required
12/21/2020

All easements with dimensions must be provided on the plot plan. MISSING 7.5' UE ON NORTH SIDE OF PROPERTY PER PLAT.
Spot elevations
Corrective Action Required
12/21/2020

Spot elevations and/or drainage flow arrows shall be provided throughout the lot. CAN'T CONFIRM UNTIL PROPERTY CORNER HAS BEEN CORRECTED.
Lot elevations
Corrective Action Required
12/21/2020

Existing and finish elevations at all property corners must be provided on the plot plan. NORTHWEST PROPERTY CORNER DOESN'T MAKE SENSE WITH THE REST OF THE LOT PLEASE CLARIFY.
Residential Plan Review Approved 12/23/2020 12/21/2020
Dylan Eppert
Plot Plan Review Rejected 11/30/2020 12/17/2020
Dylan Eppert
Easements
Corrective Action Required
12/17/2020

All easements with dimensions must be provided on the plot plan. MISSING 7.5' UE ON NORTH SIDE OF PROPERTY PER PLAT.
Spot elevations
Corrective Action Required
12/17/2020

Spot elevations and/or drainage flow arrows shall be provided throughout the lot. CAN'T CONFIRM UNTIL PROPERTY CORNER HAS BEEN CORRECTED.
Lot elevations
Corrective Action Required
12/17/2020

Existing and finish elevations at all property corners must be provided on the plot plan. NORTHWEST PROPERTY CORNER DOESN'T MAKE SENSE WITH THE REST OF THE LOT PLEASE CLARIFY.
Planning Review (RES) Approved 12/18/2020 12/16/2020
Shannon McGuire
Residential Plan Review Approved 11/30/2020 11/30/2020
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $994.54 $994.54 Paid 12/21/2020
8331507-Sewer Connection Fee $390.00 $390.00 Paid 12/21/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 12/21/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 12/21/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 12/21/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/21/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 08/12/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 08/12/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Sewer Service Inspection - R Passed 3/3/2021 (1:00) 3/3/2021 03/03/2021
Footing Inspection - Residential Failed 3/3/2021 03/03/2021
Misc
Corrective Action Required
03/03/2021
NO FOOTING INSPECTION ON RECORD SUBMIT 3RD PARTY INSPECTIONS WITHIN 48 HOURS OF POUR
Water Service Inspection - R Passed 3/5/2021 (8:00) 3/4/2021 03/04/2021
Underslab Plumbing Inspection - Residential Passed 3/11/2021 3/11/2021 03/11/2021
Erosion Control Inspection Residential Failed 3/18/2021 03/18/2021
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
03/18/2021
- MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER - - STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. -
Piers/Caissons Inspection - Residential Passed 4/12/2021 (11:30) 4/12/2021 04/12/2021
Footing Inspection - Residential Passed 5/11/2021 05/11/2021
Misc
Informational
05/11/2021
3RD PARTY FOOTING BY DEREK PEREZ @ RES SIGNED & SEALED BY BRADLEY HUXOL UFER LOCATED CENTER OF WEST (REAR) GARAGE FOUNDATION WALL
All Rough Inspection - Residential Failed 5/11/2021 5/11/2021 05/11/2021
Misc
Corrective Action Required
05/11/2021
Provide flashing above exterior horizontal trim Unable to verify PFH portal frame nailing Provide 5/8 anchor bolts w/ SQ washers PFH portal frame Address broken trusses over stairway A-5, A-6, A-7 Address trusses with cut tails A-2, A-3 Provide 4 soffit vents per plan Provide full height continuous 6x6 cedar post @ covered deck Solid block and nail sheathing at top plate per code braced wall panel rear wall Seal upward penetration top plate stairway out side master bed Seal dead space pantry/ shower Seal top plate/ fire block bath # 2 Rear wall basement north & south corners provide 3 studs nail intersecting wall corners at braced wall panels Tighten anchor bolts basement Provide anchor bolt within 12" of plate break bed #4 closet Seal hose bib pex penetration at top of furr out bed #3 Provide anchor bolts SCH 40 columns
Erosion Control Inspection Residential Failed 5/20/2021 05/20/2021
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
03/18/2021
- MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER - - STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. -
DCM6 ESC INSP DENIED STREET CLEAN UP
Corrective Action Required
05/20/2021
- MAINTAIN SILT FENCE - - MAINTAIN GRAVEL FILTER - - STREET CLEAN UP REQUIRED IMMEDIATELY, AND SHALL BE COMPLETED PRIOR TO REQUESTED INSPECTION(S) BEING PERFORMED. -
All Rough Inspection - Residential Failed 5/25/2021 5/25/2021 05/25/2021
Misc
Corrective Action Required
05/11/2021
Tyvek tape nail penetrations at garage door Address trusses with cut tails A-2, A-3 Provide 4 soffit vents per plan Provide full height continuous 6x6 cedar post @ covered deck Rear wall basement north & south corners provide 3 studs nail intersecting wall corners at braced wall panels Seal hose bib pex penetration at top of furr out bed #3
Electrical Service Inspection Passed 5/25/2021 5/25/2021 05/25/2021
Gas Service Inspection - Residential Passed 5/25/2021 5/25/2021 05/25/2021
All Rough Inspection - Residential Passed 6/3/2021 6/3/2021 06/03/2021
Misc
Resolved
06/03/2021
Driveway Inspection Partial 6/4/2021 6/4/2021 06/04/2021
Misc
Corrective Action Required
06/04/2021
Forms were placed and aggregate was present, but not compacted. RP 6-4-21
Driveway Inspection Passed 6/11/2021 6/11/2021 06/11/2021
Misc
Corrective Action Required
06/04/2021
Forms were placed and aggregate was present, but not compacted. RP 6-4-21
Misc
Informational
06/11/2021
Finished driveway meets LS and ADA specs. RP 6-11-21
Sidewalk Inspection Not Ready 7/8/2021 7/8/2021 07/08/2021
Misc
Corrective Action Required
07/08/2021
Forms not set and aggregate not compacted yet. RP 7-8-21
Sidewalk Inspection Not Ready 7/9/2021 7/9/2021 07/09/2021
Misc
Corrective Action Required
07/08/2021
Forms not set and aggregate not compacted yet. RP 7-8-21
Misc
Corrective Action Required
07/09/2021
Forms were placed and aggregate was present, but not at the required depth. RP 7-9-21
Sidewalk Inspection Failed 7/15/2021 7/15/2021 07/15/2021
Misc
Corrective Action Required
07/09/2021
Forms not set and aggregate not compacted yet. RP 7-8-21
Misc
Corrective Action Required
07/09/2021
Forms were placed and aggregate was present, but not at the required depth. RP 7-9-21
Misc
Corrective Action Required
07/15/2021
Sidewalk was poured, but not protected by white cure. Need to remove and replace sidewalk. RP 7-15-21
Sidewalk Inspection Partial 7/21/2021 7/21/2021 07/21/2021
Misc
Informational
07/21/2021
Forms were placed and aggregate was present and compacted. RP 7-21-21
Sidewalk Inspection Passed 7/30/2021 7/30/2021 07/30/2021
Misc
Informational
07/21/2021
Forms were placed and aggregate was present and compacted. RP 7-21-21
Misc
Informational
07/30/2021
Finished sidewalk meets LS and ADA specs. RP 7-30-21
Plot Plan Inspection Passed 8/6/2021 08/06/2021
Occupancy Inspection - Codes Residential Failed 8/6/2021 8/6/2021 08/06/2021
Miscellaneous Correction
Corrective Action Required
08/06/2021
Pay ourtstanding fees Provide back flow certification for lawn irrigation Provide guard rail at front porch over 30" to grade Seal exterior light fixtures Provide access to GFCI receptacle at jacuzzi tub master Seal exterior penetrations irrigation & low volt near meter can, sump discharge Seal top of ac disconnect & meter can Sump shall discharge 36" from foundation Corner hangers at deck ledger
Deck Final Inspection - Residential Passed 8/26/2021 08/26/2021
Occupancy Inspection - Codes Residential Full C of O 8/26/2021 8/26/2021 08/26/2021
Miscellaneous Correction
Resolved
08/26/2021
Documents & Images
Date Uploaded File Type Document Name
11/23/2020 Application Form W2 #61 - Permit App
11/24/2020 61 WOODSIDE RIDGE ROOF LAYOUT
11/24/2020 2524433 RF SEAL 11162020
11/24/2020 LOT 61 FINAL
11/24/2020 W2 #61 - Jasmine - Mediterranean - Sheets- signed
11/30/2020 Drawing APPROVED TRUSS LAYOUT
11/30/2020 Specifications APPROVED TRUSS PACKAGE
12/10/2020 Plans APPROVED HOUSE PLAN
12/17/2020 Letter Codes Residential Plan Review
12/21/2020 Plot Plan APPROVED PLOT PLAN
12/21/2020 Receipt Receipt for transaction:2020-008140
12/21/2020 Letter DS Building Permit
03/03/2021 Letter INSPECTION SUMMARY
03/03/2021 Letter INSPECTION SUMMARY
03/03/2021 Letter INSPECTION SUMMARY
03/04/2021 Letter INSPECTION SUMMARY
03/11/2021 Letter INSPECTION SUMMARY
03/18/2021 Letter INSPECTION SUMMARY
03/18/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter INSPECTION SUMMARY
05/11/2021 Lot 61 Woodside Ridge Footing Inspection (002)
05/11/2021 Letter INSPECTION SUMMARY
05/11/2021 Letter INSPECTION SUMMARY
05/20/2021 Letter INSPECTION SUMMARY
05/25/2021 Truss fixes
05/25/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
05/25/2021 Letter INSPECTION SUMMARY
05/27/2021 61 Woodside Ridge Non-continuous deck post letter
05/28/2021 Truss fixes for cut tails
06/03/2021 Letter INSPECTION SUMMARY
06/04/2021 Letter INSPECTION SUMMARY
06/11/2021 Letter INSPECTION SUMMARY
07/06/2021 Plot Plan Approved As Graded Plot Plan
07/08/2021 Letter INSPECTION SUMMARY
07/08/2021 Letter INSPECTION SUMMARY
07/09/2021 Letter INSPECTION SUMMARY
07/09/2021 Letter INSPECTION SUMMARY
07/09/2021 Letter INSPECTION SUMMARY
07/15/2021 Letter INSPECTION SUMMARY
07/15/2021 Letter INSPECTION SUMMARY
07/21/2021 Letter INSPECTION SUMMARY
07/30/2021 Letter INSPECTION SUMMARY
08/06/2021 Letter INSPECTION SUMMARY
08/06/2021 Letter INSPECTION SUMMARY
08/12/2021 Receipt Receipt for transaction:2021-006498
08/26/2021 Letter INSPECTION SUMMARY
08/26/2021 Letter Field Certificate of Occupancy
08/26/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home