Permit Application Status

PRRES20203953


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20203953
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSS - UNFINISHED BASEMENT
10/26/2020
10/30/2020
06/24/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 10/29/2020 10/29/2020
Dylan Eppert
Residential Plan Review Approved 10/29/2020 10/29/2020
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,073.80 $1,073.80 Paid 10/30/2020
8331504-EFHB Middle Big Creek, Full $502.20 $502.20 Paid 10/30/2020
8331507-Sewer Connection Fee $450.00 $450.00 Paid 10/30/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 10/30/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 10/30/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 10/30/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 10/30/2020
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 06/07/2021
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 06/07/2021
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 06/07/2021
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 06/07/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 11/12/2020 (1:30) 11/12/2020 11/12/2020
Underslab Plumbing Inspection - Residential Passed 12/9/2020 12/9/2020 12/09/2020
Piers/Caissons Inspection - Residential Passed 3/15/2021 (11:30) 3/15/2021 03/15/2021
All Rough Inspection - Residential Failed 3/25/2021 3/25/2021 03/25/2021
Misc
Corrective Action Required
03/25/2021
-Unable to determine nail pattern at garage portal framing PFH, cannot see all embedded garage portal straps due to siding cover -Anchor bolt required at bottom plate garage portal sgl car door south side -Anchor bolts required within 12” of plate break in garage -seal all top plate penetrations- see garage wall low volt -Address (6) floor joists above garage owner entry 1st floor, several bores for NM (romex) less than 2” apart -seal all penetrations through air returns and plenums -Nail joist hangers at header at HVAC box out owner entry 1st floor -joist hanger required at joist to header connection, HVAC box out owner entry 1st floor -Adress header overbored for DWV and bored less than 2” from bottom, HVAC box out owner entry 1st floor -Joist hanger required at sgl joist to beam connection above dining room 1st floor -H2.5 truss clips required at trusses above dining room -Fireblock chases at living room windows -Address (4) overbored sgl floor joists for DWV and pex bores less than 2” from end of joist at great room windows -Fireblock fireplace lid -Secure gas flex line at fireplace -Fireblock dead space at living room/front entry -Nail joist hangers at joist to lvl connection above front entry -(2) 2x4 at bearing end of (2) 2x10 joist above foyer 1st floor -Attic access garage per plans -LIB bracing all locations per plans -(2) 2x4 jack studs at owner entry door per plans -All truss hangers per plans -Fireblock HVAC chase 2nd floor laundry -strap top plate cut for dryer duct laundry 2nd floor -Truss lateral bracing all locations per plans -(4) 2x4 stud packs at girder truss bearing ends per plans -properly support stair landings -Nail exterior sheathing per plans, 6” edge 12” field -Color code/label GEC at service panel
Gas Service Inspection - Residential Passed 3/25/2021 3/25/2021 03/25/2021
Electrical Service Inspection Failed 3/25/2021 3/25/2021 03/25/2021
Misc
Corrective Action Required
03/25/2021
-COLOR CODE/LABEL GEC AT SERVICE PANEL
All Rough Inspection - Residential Failed 3/31/2021 3/31/2021 03/31/2021
Misc
Corrective Action Required
03/25/2021
-Unable to determine nail pattern at garage portal framing PFH, cannot see all embedded garage portal straps due to siding cover -Address (6) floor joists above garage owner entry 1st floor, several bores for NM (romex) less than 2” apart -seal all penetrations through air returns and plenums -Address header overbored for DWV and bored less than 2” from bottom, HVAC box out owner entry 1st floor -H2.5 truss clips required at trusses above dining room -Address (4) overbored sgl floor joists for DWV and pex bores less than 2” from end of joist at great room windows -Fireblock fireplace lid -Secure gas flex line at fireplace -Fireblock dead space at living room/front entry -(2) 2x4 at bearing end of (2) 2x10 joist above foyer 1st floor -LIB bracing all locations per plans -All truss hangers per plans -Fireblock HVAC chase 2nd floor laundry -Truss lateral bracing all locations per plans
Electrical Service Inspection Passed 4/1/2021 4/1/2021 04/01/2021
Misc
Resolved
04/01/2021
All Rough Inspection - Residential Failed 4/5/2021 4/5/2021 04/05/2021
Misc
Corrective Action Required
03/31/2021
-Garage PFH requires 3” nailing pattern at sheathing to header, see plan detail on S2.0 -Address (6) floor joists above garage owner entry 1st floor, several bores for NM (romex) less than 2” apart -nail all holes in LSTA18 straps -Address header overbored for DWV and bored less than 2” from bottom, HVAC box out owner entry 1st floor -seal all penetrations through air returns and plenums -see ceiling joist penetrations in air return above kitchen -Address (4) overbored sgl floor joists for DWV and pex bores less than 2” from end of joist at great room windows - engineer letter does not address all issues with overbore of floor joist for DWV, LSTA18 straps not nailed off -Fireblock dead space at living room/front entry -seal edge gaps at plywood Fireblock -Fireblock HVAC chase 2nd floor laundry - seal gaps around HVAC duct -All truss hangers per plans - see garage -Truss lateral bracing all locations per plans
All Rough Inspection - Residential Failed 4/8/2021 4/8/2021 04/08/2021
Misc
Corrective Action Required
04/05/2021
-Garage PFH requires 3” nailing pattern at sheathing to header, see plan detail on S2.0 -Address (4) overbored sgl floor joists for DWV and pex bores less than 2” from end of joist at great room windows - engineer letter does not address all issues with overbore of (2) Floor joists for DWV -All truss hangers per plans - see garage
All Rough Inspection - Residential Failed 4/12/2021 4/12/2021 04/12/2021
Misc
Corrective Action Required
04/08/2021
-Address (4) overbored sgl floor joists for DWV and pex bores less than 2” from end of joist at great room windows - engineer letter does not address all issues with overbore of (2) Floor joists for DWV -All truss hangers per plans - see garage - remove insulation from between trusses in ceiling to allow for all truss hangers to be seen in garage **HOUSE INSULATED WITHOUT APPROVAL**
All Rough Inspection - Residential Passed 4/13/2021 4/13/2021 04/13/2021
Misc
Resolved
04/13/2021
Sewer Service Inspection - R Passed 5/13/2021 (10:45) 5/13/2021 05/13/2021
Water Service Inspection - R Passed 5/17/2021 (9:45) 5/17/2021 05/17/2021
Driveway Inspection Failed 5/19/2021 05/20/2021
Misc
Informational
05/20/2021
Everything is ready to pour except it is raining and has a wet subgrade. Please call in a new inspection when subgrade is dried out.
Driveway Inspection Passed 5/21/2021 5/21/2021 05/21/2021
Misc
Informational
05/20/2021
Everything is ready to pour except it is raining and has a wet subgrade. Please call in a new inspection when subgrade is dried out.
Occupancy Inspection - Codes Residential Failed 6/2/2021 6/2/2021 06/02/2021
Misc
Corrective Action Required
06/02/2021
-Final sidewalk inspection required, contact development services to schedule -Resolve all outstanding inspection fee(s) before final c of o -Final grade and sod -complete stone/siding front of house -Gutter and downspouts required -Splash blocks at all downspout and sump pump discharge locations, min 36” from foundation -Guardrail at front porch -Install countertop at kitchen island, install faucet and complete plumbing -Seal all penetrations at garage ceiling for garage door brackets -security screws at back door, install (2) 3” screws at each hinge and at strike -Install non combustible attic access cover 2nd floor -Clip off set screw head on anti siphon device at spigot, main water line basement -Hot water heater must be operational
Sidewalk Inspection Passed 6/8/2021 6/8/2021 06/08/2021
Occupancy Inspection - Codes Residential Temporary C of O 6/11/2021 6/11/2021 06/11/2021
Misc
Corrective Action Required
06/02/2021
**TCO UNTIL 7-2 -MAINTAIN EROSION CONTROL UNTIL SOD IS IN PLACE-CLEAN STREETS AND SIDEWALK OF DEBRIS, PROVIDE EROSION CONTROL TO PROTET SIDEWALK -Final grade and sod -Splash blocks at all downspout and sump pump discharge locations, min 36” from foundation
Erosion Control Inspection Residential Passed 06/24/2021
Plot Plan Inspection Passed 06/24/2021
Occupancy Inspection - Codes Residential Full C of O 6/24/2021 6/24/2021 06/24/2021
Misc
Resolved
06/24/2021
Documents & Images
Date Uploaded File Type Document Name
10/26/2020 Application Form MN #108 - PERMIT APPLICATION
10/27/2020 LOT 108 FINAL 10-19-20
10/27/2020 MN #108 - TRUSS LAYOUT
10/27/2020 400686
10/27/2020 MN #108 - Palmer - Craftsman - Sheets- signed
10/29/2020 Specifications ROOF TRUSS PACKAGE
10/29/2020 Drawing APPROVED TRUSS LAYOUT
10/29/2020 Plans APPROVED HOUSE PLANS
10/29/2020 Plot Plan APPROVED PLOT PLAN
10/30/2020 Receipt Receipt for transaction:2020-007284
10/30/2020 Letter DS Building Permit
11/12/2020 Letter INSPECTION SUMMARY
12/09/2020 Letter INSPECTION SUMMARY
03/15/2021 Letter INSPECTION SUMMARY
03/25/2021 Letter INSPECTION SUMMARY
03/25/2021 Letter INSPECTION SUMMARY
03/25/2021 Letter INSPECTION SUMMARY
03/31/2021 Letter INSPECTION SUMMARY
04/01/2021 Letter INSPECTION SUMMARY
04/02/2021 Lot 108 Structural Inspection - Signed
04/05/2021 Letter INSPECTION SUMMARY
04/08/2021 Letter INSPECTION SUMMARY
04/12/2021 Letter INSPECTION SUMMARY
04/13/2021 Lot 108 Structural Inspection 04082021 -108MN (2).pdf
04/13/2021 Letter INSPECTION SUMMARY
05/13/2021 Letter INSPECTION SUMMARY
05/17/2021 Letter INSPECTION SUMMARY
05/20/2021 Letter INSPECTION SUMMARY
05/21/2021 Letter INSPECTION SUMMARY
06/02/2021 Letter INSPECTION SUMMARY
06/07/2021 Receipt Receipt for transaction:2021-004007
06/08/2021 Letter INSPECTION SUMMARY
06/11/2021 Letter Codes Temporary Certificate of Occupancy
06/24/2021 Letter INSPECTION SUMMARY
06/24/2021 Letter INSPECTION SUMMARY
06/24/2021 Letter Field Certificate of Occupancy
06/24/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home