Summary
PRRES20203606
Building Permit - Residential
Certificate of Occupancy
CMH PARKS INC
NEW SINGLE FAMILY
NEW HOUSE - ROOF TRUSS - COVERED DECK - FINISHED BASEMENT
10/08/2020
10/22/2020
04/20/2021
05/17/2021
Locations
Contacts
CMH PARKS INC, Address:5000 CLAYTON RD  
CLAYTON PROPERTIES GROUP, INC, Address:10450 Holmes Rd Suite 100, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 10/26/2020 10/22/2020
Dylan Eppert
Contours, spot elevations and arrows
Corrective Action Required
10/22/2020

Contours, spot elevations and drainage flow arrows (as required) shall be provided on the lot. MISSING DRAINAGE FLOW ARROWS.
Residential Plan Review Approved 10/26/2020 10/22/2020
Dylan Eppert
Plot Plan Review Rejected 10/12/2020 10/21/2020
Dylan Eppert
Contours, spot elevations and arrows
Corrective Action Required
10/12/2020

Contours, spot elevations and drainage flow arrows (as required) shall be provided on the lot. MISSING DRAINAGE FLOW ARROWS.
Planning Review (RES) Approved 10/12/2020 10/21/2020
Dylan Eppert
Residential Plan Review Approved 10/12/2020 10/12/2020
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,039.74 $1,039.74 Paid 10/22/2020
8331507-Sewer Connection Fee $360.00 $360.00 Paid 10/22/2020
Water Tap Fee $3,581.00 $3,581.00 Paid 10/22/2020
Water Meter Fee $455.54 $455.54 Paid 10/22/2020
Right of Way Permit Fee $80.00 $80.00 Paid 10/22/2020
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 10/22/2020
Not Ready Inspection Fee $50.00 $50.00 Paid 05/05/2021
3rd and Subsequent Inspection Fee (Per Hour) $100.00 $100.00 Paid 05/05/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 11/5/2020 11/5/2020 11/05/2020
Underslab Plumbing Inspection - Residential Passed 11/23/2020 11/23/2020 11/23/2020
Sewer Service Inspection - R Passed 1/27/2021 (11:30) 1/27/2021 01/27/2021
Water Service Inspection - R Passed 1/28/2021 (1:00) 1/28/2021 01/28/2021
All Rough Inspection - Residential Not Ready 2/5/2021 2/5/2021 02/05/2021
Misc
Corrective Action Required
02/05/2021
***NO CITY APPROVED PLANS OR CITY APPROVED TRUSS PLANS ON SITE***
Gas Service Inspection - Residential Failed 2/8/2021 2/8/2021 02/08/2021
Misc
Corrective Action Required
02/08/2021
-Complete gas line installation at fireplace -complete all gas lines, no gas lines present
Electrical Service Inspection Passed 2/8/2021 2/8/2021 02/08/2021
All Rough Inspection - Residential Failed 2/8/2021 2/8/2021 02/08/2021
Misc
Corrective Action Required
02/05/2021
-Complete gas line installation at fireplace -nail straps at great room windows -security blocking at backdoor, basement walkout -H2.5 clips required on hip trusses at covered deck, dining room -seal gap in Fireblock at top plate, between foyer and great room, N laundry wall -address all damaged trusses above bedroom #2 connected to E5 girder truss -Address damaged C7 truss above great room -truss bracing per plans -Nail all dbl girder truss together per plans -(2) 2x4 at owner entry per plans -Exterior bracing CS-PF at dining room windows and sliding door per plans R602.10.6.4 -complete all gas lines, no gas lines present -Fireblock vertical every 10’ between foundation wall/framing and studs, seal any gaps in Fireblock -Fireblock between top plate and foundation wall in basement, seal any gaps and penetrations in Fireblock -secure all vertical DWV 2” or less at mid point-see basement -1” clearance from combustibles at b vent in basement, move low volt wiring off vent -address cut floor joist for DWV, NW side basement -screw/tape HVAC duct above mech room door in basement -solid block between joists every 48” oc for kitchen island per plans -full height 6x6 cedar posts at deck per plans -Post/beam connection per code at deck
All Rough Inspection - Residential Failed 2/18/2021 2/18/2021 02/18/2021
Misc
Corrective Action Required
02/08/2021
-seal gap in Fireblock at top plate, between foyer and great room, N laundry wall -address all damaged trusses above bedroom #2 connected to E5 girder truss -Address damaged C7 truss above great room *Not all damage/repairs noted on uploaded engineer report* -Seal NM top plate penetrations bed#2 -truss bracing per plans -lateral bracing per plans -Nail all dbl girder truss together per plans -B2 girder truss -Fireblock vertical every 10’ between foundation wall/framing and studs, seal any gaps,penetrations in Fireblock -Fireblock between top plate and foundation wall in basement, seal any gaps and penetrations in Fireblock -Seal top penetration basement bed closet -secure all vertical DWV 2” or less at mid point-see basement -1” clearance from combustibles at b vent in basement, move low volt wiring off vent -secure NM along joists NW side if basement where new header was established for cut floor joist at DWV -screw/tape HVAC duct above mech room door in basement -full height 6x6 cedar posts at deck per plans -Post/beam connection per code at deck
Gas Service Inspection - Residential Passed 2/18/2021 2/18/2021 02/18/2021
Misc
Resolved
02/18/2021
All Rough Inspection - Residential Failed 2/25/2021 2/25/2021 02/25/2021
Misc
Corrective Action Required
02/18/2021
-Fireblock between top plate and foundation wall in basement, seal any gaps and penetrations in Fireblock -see gas flex line penetration for fireplace, see gaps in top plate Fireblock material at top plate southeast wall area above egress window -1” clearance from combustibles at b vent in basement near furnace, move low volt wiring off vent -secure NM along joists NW side if basement where new header was established for cut floor joist at DWV-Secure and support NM to code NEC 334.30 -Post/beam connection per code at deck
All Rough Inspection - Residential Passed 2/26/2021 2/26/2021 02/26/2021
Misc
Resolved
02/26/2021
Sidewalk Inspection Partial 3/26/2021 3/26/2021 03/26/2021
Misc
Informational
03/26/2021
3-26-21 1:37pm The forms are set and the aggregate is compacted.
Driveway Inspection Partial 3/26/2021 3/26/2021 03/26/2021
Misc
Informational
03/26/2021
3-26-21 1:37pm The forms are set and the aggregate is compacted. They will be pouring curb in front of the driveway.
Sidewalk Inspection Passed 3/30/2021 3/30/2021 03/30/2021
Misc
Informational
03/26/2021
3-26-21 1:37pm The forms are set and the aggregate is compacted.
Driveway Inspection Passed 3/30/2021 3/30/2021 03/30/2021
Misc
Informational
03/26/2021
3-26-21 1:37pm The forms are set and the aggregate is compacted. They will be pouring curb in front of the driveway.
Occupancy Inspection - Codes Residential Failed 5/4/2021 5/4/2021 05/04/2021
Misc
Corrective Action Required
05/04/2021
-Maintain erosion control on lot until sod is placed -Resolve outstanding inspection fee(s) before final c of o -Final grade and sod -splash blocks at all downspout and sump pump discharge locations, min 36” from foundation -seal all penetrations in siding -Clip off set screw on anti siphon on spigot at main water line in basement -Install non combustible attic access cover in garage -Breaker lockouts at all hardwired appliances -Defective GFCI receptacle, south side house exterior
Plot Plan Inspection Passed 05/17/2021
Erosion Control Inspection Residential Passed 05/17/2021
Occupancy Inspection - Codes Residential Full C of O 5/14/2021 5/17/2021 05/17/2021
Misc
Resolved
05/17/2021
Documents & Images
Date Uploaded File Type Document Name
10/08/2020 Application Form HT #19 - PERMIT APPLICATION
10/08/2020 19 HAWTHORNE RIDGE ROOF LAYOUT- signed
10/08/2020 LOT 19 FINAL
10/08/2020 HT #19 - Newhaven - Craftsman - Sheets- signed revised
10/08/2020 400675 -10-2-20
10/12/2020 Drawing APPROVED ROOF LAYOUT
10/12/2020 Specifications APPROVED ROOF TRUSS
10/12/2020 Plans APPROVED HOUSE PLAN
10/21/2020 Plans APPROVED ELEVATIONS
10/21/2020 Letter Codes Residential Plan Review
10/22/2020 Plot Plan APPROVED PLOT PLAN
10/22/2020 Receipt Receipt for transaction:2020-007093
10/22/2020 Letter DS Building Permit
11/02/2020 19 Hawthorne Ridge-Subgrade
11/04/2020 Lot 19 Hawthorne Ridge Footing Inspection
11/05/2020 Letter INSPECTION SUMMARY
11/06/2020 Lot 19 Hawthorne Ridge Wall Inspection
11/23/2020 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
01/28/2021 Letter INSPECTION SUMMARY
02/05/2021 Letter INSPECTION SUMMARY
02/08/2021 Letter INSPECTION SUMMARY
02/08/2021 Letter INSPECTION SUMMARY
02/08/2021 Letter INSPECTION SUMMARY
02/17/2021 HT-19 TRUSS REPAIR
02/18/2021 Letter INSPECTION SUMMARY
02/18/2021 Letter INSPECTION SUMMARY
02/24/2021 19 Hawthorne Ridge Non-continuous deck post letter- signed
02/25/2021 Approved Plans Approved Truss Package
02/25/2021 Letter INSPECTION SUMMARY
02/26/2021 Letter INSPECTION SUMMARY
03/26/2021 Letter INSPECTION SUMMARY
03/26/2021 Letter INSPECTION SUMMARY
03/30/2021 Letter INSPECTION SUMMARY
03/30/2021 Letter INSPECTION SUMMARY
05/04/2021 Letter INSPECTION SUMMARY
05/05/2021 Receipt Receipt for transaction:2021-002526
05/17/2021 Letter INSPECTION SUMMARY
05/17/2021 Letter INSPECTION SUMMARY
05/17/2021 Letter Field Certificate of Occupancy
05/17/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home