Permit Application Status

PRRES20203583


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20203583
Building Permit - Residential
Certificate of Occupancy
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO - ADDING GAS FIRE PLACE TO BACK DECK Brandon Kalwei 10/21/2021 2:28 PM
10/07/2020
10/28/2020
04/24/2021
05/31/2022
Locations
Contacts
SUMMIT VIEW FARMS DEVELOPMENT GROUP LLC, Address:13450 E STATE ROUTE 150  
WOOD BROTHERS CONSTRUCTION INC, Address:PO BOX 553, Phone:(816) 564-5024  
A & D HEATING AND COOLING INC, Address:2006 W MAIN ST, Phone:(816) 537-7952  
BMW ELECTRIC CO, Address:1238 W 31ST, Phone:(816) 289-3474  
PREFERRED PLUMBING INC, Address:1664 NW 415TH RD, Phone:(816) 828-1680  
WOODBROTHERSINC.GMAILCOM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 10/30/2020 10/28/2020
Kim Brennan
Deck location
Corrective Action Required
10/28/2020

Deck location, with dimensions to property lines must be provided on the plot plan. The drawings show this as a covered patio, not a covered deck.
As-graded plot plan
Corrective Action Required
10/28/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Residential Plan Review Approved 10/30/2020 10/28/2020
Kim Brennan
Residential Plan Review Approved 10/12/2020 10/27/2020
Kim Brennan
Misc
Corrective Action Required
10/08/2020

The address, lot number and subdivision is wrong on the drawings
09 Identify furnace and water heater locations
Corrective Action Required
10/08/2020

Identify furnace and water heater location(s). (IRC Section G2406)
04 Two (2) copies of construction drawings
Corrective Action Required
10/08/2020

Two (2) copies of construction drawings. (Plans to be signed and sealed by an architect or engineer registered in the State of Missouri.) The stamp on these drawings is from November 2019. Please have engineer update stamped drawings
Plot Plan Review Rejected 10/12/2020 10/08/2020
Kim Brennan
Deck location
Corrective Action Required
10/08/2020

Deck location, with dimensions to property lines must be provided on the plot plan. The drawings show this as a covered patio, not a covered deck.
As-graded plot plan
Corrective Action Required
10/08/2020

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,704.19 $1,704.19 Paid 10/28/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 10/28/2020
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 10/28/2020
8331507-Sewer Connection Fee $600.00 $600.00 Paid 10/28/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 10/28/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 10/28/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 11/19/2020 (3:30) 11/19/2020 11/19/2020
Underslab Plumbing Inspection - Residential Failed 12/15/2020 12/15/2020 12/15/2020
Misc
Corrective Action Required
12/15/2020
- POST ADDRESS - MAINTAIN EROSION CONTROL SILT FENCE AT FRONT OF LOT, CLEAN MUD AND GRAVEL FROM STREET
Erosion Control Inspection Residential Failed 12/15/2020 12/15/2020 12/15/2020
Misc
Corrective Action Required
12/15/2020
-MAINTAIN EROSION CONTROL SILT FENCE AT FRONT OF LOT, CLEAN MUD AND GRAVEL FROM STREET
Underslab Plumbing Inspection - Residential Passed 12/21/2020 12/21/2020 12/21/2020
Misc
Resolved
12/21/2020
Piers/Caissons Inspection - Residential Passed 3/4/2021 (8:00) 3/4/2021 03/04/2021
Electrical Service Inspection Passed 5/11/2021 5/11/2021 05/11/2021
Gas Service Inspection - Residential Passed 5/11/2021 5/11/2021 05/11/2021
All Rough Inspection - Residential Failed 5/11/2021 5/11/2021 05/11/2021
Misc
Corrective Action Required
05/11/2021
-Jack straps at garage PFH per plans - R602.10.6.2 see detail on page S2.0 in plans -Fasten sheathing to header at garage portal PFH with 8D nails in 3" grid pattern -R602.10.6.2 see detail on page S2.0 in plans -Garage PFH portal min dbl bottom plate with (1) 5/8" diameter anchor bolt with 2"x2"x3/16" plate washer - R602.10.6.2 see detail on page S2.0 in plans -Fireblock DWV bump out next to garage entry -Fireblock all tub and shower traps -Protect NM at floor penetration for kitchen island, 6” above finished floor -Nail protection plates at all NM within 1 1/4” end of stud- see kitchen, living room,2nd floor loft, 2nd floor bed#3 -Seal top plate and bottom plate penetrations -see: kitchen, master closet , 2nd floor bonus room, 2nd floor hall bath, bed#4 closet -Add tripl joist hanger to tpl joist near living room windows/kitchen, must bear on top plate minimum 1 1/2” -Complete bath exhaust fan duct 1st floor and 2nd floor hall bath - Add Dbl and sgl joist hangers above front entry, over 4’ -seal all penetrations through air returns -R502.8.1, Bores in floor joists for NM less than 2” from bottom of joists at several locations throughout - see master bath at vanity, 1st floor hall bath, kitchen -replace or submit engineer letter -(3) 2x6 studs each end continuous floor to ceiling at front entry per plans -Joist hanger at joists to lvl and (2) 2x10 connection at 2nd floor loft, over 4’ -Joist hangers at joists to (2) lvl connection at 2nd floor bed#2, over 4’ -(2) 1 3/4” x 11 7/8” lvl at bonus room 2nd floor per plans -Joist hangers at tail joists to header connection 2nd floor bonus room -(3) 2x4 stud pack at bath/bed #3 desk wall at lvl per plans -(2) 1 3/4” x 9 1/4” lvl at 2nd floor bed#3 per plans -(2) 1 3/4” x 11 7/8” lvl at 2nd floor bed #4 per plans -Land NM to box at attic near attic access -Joist hangers at joists to dbl lvl connect 2nd floor bed#2 -Purlin struts not less than 45 degree angle -Joist hanger at tail joist to header connection covered deck, over 4’ -Land NM to boxes at covered deck -Insulate first and solid block between joists at cantilevers -Anchor bolts required within 12” of bottom plate breaks at basement -secure SER cable within 12” of service panel entrance -3” SCH steel column at pier location “A” at 8x15 steel beam at basement stairs per plans
Water Service Inspection - R Passed 5/14/2021 5/14/2021 05/14/2021
All Rough Inspection - Residential Failed 5/19/2021 5/19/2021 05/19/2021
Misc
Corrective Action Required
05/11/2021
-Garage PFH portal min dbl bottom plate with (1) 5/8" diameter anchor bolt with 2"x2"x3/16" plate washer - R602.10.6.2 see detail on page S2.0 in plans -Add sgl joist hangers above front entry, over 4’ -R502.8.1, Bores in floor joists for NM less than 2” from bottom of joists at several locations throughout - see master bath at vanity, 1st floor hall bath, kitchen -replace or submit engineer letter -(2) 1 3/4” x 11 7/8” lvl at bonus room 2nd floor per plans -2) 1 3/4” x 9 1/4” lvl at 2nd floor bed#3 per plans -(2) 1 3/4” x 11 7/8” lvl at 2nd floor bed #4 per plans **OK TO INSULATE**
Erosion Control Inspection Residential Failed 5/24/2021 5/24/2021 05/24/2021
Misc
Corrective Action Required
12/15/2020
-MAINTAIN EROSION CONTROL SILT FENCE AT FRONT OF LOT, CLEAN ALL MUD AND GRAVEL FROM STREET
All Rough Inspection - Residential Failed 5/24/2021 5/24/2021 05/24/2021
Misc
Corrective Action Required
05/19/2021
-Garage PFH portal min dbl bottom plate with (1) 5/8" diameter anchor bolt with 2"x2"x3/16" plate washer - R602.10.6.2 see detail on page S2.0 in plans -R502.8.1, Bores in floor joists for NM less than 2” from bottom of joists at several locations throughout - see master bath at vanity, 1st floor hall bath, kitchen -replace or submit engineer letter -(2) 1 3/4” x 11 7/8” lvl at bonus room 2nd floor per plans -2) 1 3/4” x 9 1/4” lvl at 2nd floor bed#3 per plans -(2) 1 3/4” x 11 7/8” lvl at 2nd floor bed #4 per plans **OK TO INSULATE**
Sewer Service Inspection - R Partial 5/26/2021 (3:00) 5/26/2021 05/26/2021
Misc
Informational
05/26/2021
-PARTIAL INSPECTION ON LINE FROM HOUSE 30' E TOWARDS STUB
Sewer Service Inspection - R Partial 6/10/2021 (11:30) 6/10/2021 06/10/2021
Misc
Informational
05/26/2021
-PARTIAL INSPECTION ON LINE FROM HOUSE 40' E TOWARDS STUB
Sewer Service Inspection - R Passed 6/14/2021 (1:00) 6/14/2021 06/14/2021
Misc
Resolved
06/14/2021
-PARTIAL INSPECTION ON LINE FROM HOUSE 40' E TOWARDS STUB
Driveway Inspection Passed 7/19/2021 7/19/2021 07/19/2021
Plot Plan Inspection Passed 10/12/2021 10/12/2021 10/12/2021
All Rough Inspection - Residential Passed 10/12/2021 10/12/2021 10/12/2021
Misc
Resolved
10/12/2021
**OK TO INSULATE**
Erosion Control Inspection Residential Failed 10/12/2021 10/12/2021 10/12/2021
Misc
Resolved
10/12/2021
-MAINTAIN EROSION CONTROL SILT FENCE AT FRONT OF LOT, CLEAN ALL MUD AND GRAVEL FROM STREET
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/12/2021
EROSION CONTROL REQUIRED UNTIL SOD IS PLACED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. CLEAN ALL MUD AT FRONT OF LOT ON CHASE CIR FROM LOT
Erosion Control Inspection Residential Failed 10/18/2021 10/18/2021 10/18/2021
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/12/2021
EROSION CONTROL REQUIRED UNTIL SOD IS PLACED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. CLEAN ALL MUD AT FRONT OF LOT ON CHASE CIR FROM LOT
Sidewalk Inspection Passed 10/25/2021 10/25/2021 10/25/2021
Misc
Informational
10/25/2021
On 10/25/2021 I performed a sidewalk inspection and pass the sub-grade to pour concrete.
Occupancy Inspection - Codes Residential Failed 10/28/2021 10/28/2021 10/28/2021
Misc
Corrective Action Required
10/28/2021
pay all fees -self closing door at garage -label all non GFCI protected outlets in unfinished spaces -handrail at stairs to basement -open ground in master bathroom receptacle’s and entry bathroom receptacle -guard rail at deck must comply with code section R312.1.3 -deck beams must comply with code section R507.5.2 -house numbers -sod/final grade -splash blocks and sump pump discharge 36” from foundation
Occupancy Inspection - Codes Residential Temporary C of O 10/29/2021 10/29/2021 10/29/2021
Misc
Corrective Action Required
10/28/2021
TCO UNTIL 11/29/21 -deck beams must comply with code section R507.5.2 -sod/final grade -splash blocks and sump pump discharge 36” from foundation -install deck fire place
Occupancy Inspection - Codes Residential Temporary C of O 1/12/2022 01/12/2022
Misc
Corrective Action Required
10/29/2021
TCO UNTIL 11/29/21 -deck beams must comply with code section R507.5.2 -sod/final grade -splash blocks and sump pump discharge 36” from foundation -install deck fire place
Misc
Informational
01/12/2022
TCO extention requested 1/11/22 per E-mail with Jud TCO UNTIL 2/11/22
Erosion Control Inspection Residential Passed 1/11/2022 01/12/2022
DCM3 ESC REQUIRED 2 DAY
Corrective Action Required
10/18/2021
EROSION CONTROL REQUIRED UNTIL SOD IS PLACED. EROSION CONTROL SHALL BE IN COMPLIANCE WITHIN TWO BUSINESS DAYS. CLEAN ALL MUD AT FRONT OF LOT ON CHASE CIR FROM LOT
Occupancy Inspection - Codes Residential Failed 5/5/2022 5/5/2022 05/05/2022
Misc
Corrective Action Required
01/12/2022
-install deck fire place, exposed electrical, plywood
Misc
Informational
01/12/2022
TCO extention requested 1/11/22 per E-mail with Jud TCO UNTIL 2/11/22
Occupancy Inspection - Codes Residential Full C of O 5/31/2022 05/31/2022
Misc
Resolved
05/31/2022
-install deck fire place, exposed electrical, plywood
Misc
Resolved
05/31/2022
TCO extention requested 1/11/22 per E-mail with Jud TCO UNTIL 2/11/22
Documents & Images
Date Uploaded File Type Document Name
10/07/2020 Application Form Permit Application
10/07/2020 Application Form License Tax Application
10/07/2020 Permit Plans The Durango 2 colorado front
10/08/2020 Letter Codes Residential Plan Review
10/26/2020 Approved Plans Approved Drawings
10/28/2020 Plot Plan Approved Plot Plan
10/28/2020 Receipt Receipt for transaction:2020-007239
10/28/2020 Letter DS Building Permit
11/19/2020 Letter INSPECTION SUMMARY
12/15/2020 Letter INSPECTION SUMMARY
12/15/2020 Letter INSPECTION SUMMARY
12/21/2020 Letter INSPECTION SUMMARY
03/04/2021 Letter INSPECTION SUMMARY
05/11/2021 Letter INSPECTION SUMMARY
05/11/2021 Letter INSPECTION SUMMARY
05/11/2021 Letter INSPECTION SUMMARY
05/14/2021 Letter INSPECTION SUMMARY
05/19/2021 Letter INSPECTION SUMMARY
05/24/2021 Letter INSPECTION SUMMARY
05/24/2021 Letter INSPECTION SUMMARY
05/26/2021 Letter INSPECTION SUMMARY
06/10/2021 Letter INSPECTION SUMMARY
06/14/2021 Letter INSPECTION SUMMARY
07/19/2021 Letter INSPECTION SUMMARY
07/21/2021 Structural Framing Letter 2304 SW Chase Circle
10/08/2021 Plot Plan Approved As Graded Plot Plan
10/12/2021 Letter INSPECTION SUMMARY
10/12/2021 Letter INSPECTION SUMMARY
10/12/2021 Letter INSPECTION SUMMARY
10/18/2021 Letter INSPECTION SUMMARY
10/25/2021 Letter INSPECTION SUMMARY
10/27/2021 2304irrigationpermit
10/28/2021 Letter INSPECTION SUMMARY
10/29/2021 Letter Codes Temporary Certificate of Occupancy
01/12/2022 Letter INSPECTION SUMMARY
01/31/2022 Letter Codes Temporary Certificate of Occupancy
05/05/2022 Letter INSPECTION SUMMARY
05/31/2022 Letter Codes Final Certificate of Occupancy
05/31/2022 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: