Summary
PRRES20202961
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - COVERED DECK - UNFINISHED BASEMENT
09/14/2020
09/18/2020
07/15/2021
Locations
Contacts
IQ CONSTRUCTION, Address:P O BOX 6423, Phone:(816) 582-8100  
JENNIFER@IQHOMEBUILDERS.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
SAFEHOUSE ELECTRIC COMPANY, Address:P O BOX 1833, Phone:(816) 935-8113  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 09/16/2020 09/18/2020
Development Center
Basement elevation
Corrective Action Required
09/17/2020

The Basement floor elevation and basement type (e.g. full/standard, daylight, walk-out, etc.) The MDP shows a Standard basement and you are proposing a Daylight. Please attach an engineers letter ensuring this proposal is ok.
Residential Plan Review Approved 09/16/2020 09/17/2020
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $997.22 $997.22 Paid 09/18/2020
8331507-Sewer Connection Fee $390.00 $390.00 Paid 09/18/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 09/18/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 09/18/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 09/18/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 09/18/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 06/08/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 06/11/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 10/14/2020 (1:00) 10/14/2020 10/14/2020
Erosion Control Inspection Residential Passed 10/21/2020
Underslab Plumbing Inspection - Residential Passed 11/23/2020 11/23/2020 11/23/2020
All Rough Inspection - Residential Failed 1/13/2021 1/13/2021 01/13/2021
Misc
Corrective Action Required
01/13/2021
Portal frame -fasten top plate to header with two rows of 16d sinker nails 3” oc, see section view of detail
Sewer Service Inspection - R Passed 1/19/2021 (9:15) 1/19/2021 01/19/2021
Water Service Inspection - R Partial 1/21/2021 (8:00) 1/21/2021 01/19/2021
Misc
Corrective Action Required
01/19/2021
Partial approval from structure to metallic connection customer side of meter
All Rough Inspection - Residential Partial 01/19/2021
Misc
Resolved
01/19/2021
Portal frame -fasten top plate to header with two rows of 16d sinker nails 3” oc, see section view of detail
Misc
Informational
01/19/2021
Portal frame approved
Water Service Inspection - R Passed 1/20/2021 (1:00) 01/20/2021
Misc
Resolved
01/20/2021
Partial approval from structure to metallic connection customer side of meter
Miscellaneous Inspection Failed 01/20/2021
Misc
Corrective Action Required
01/20/2021
Post site address
Miscellaneous Inspection Passed 02/03/2021
Misc
Resolved
02/03/2021
Post site address
Erosion Control Inspection Residential Failed 02/03/2021
Misc
Corrective Action Required
02/03/2021
-Erosion control requires continuous maintenance. Repair damaged sections within two business days -immediate street cleanup required -provide and maintain gravel filter -no further inspections until issues are resolved
All Rough Inspection - Residential Failed 2/5/2021 2/5/2021 02/05/2021
Misc
Informational
01/19/2021
Portal frame approved
Misc
Corrective Action Required
02/05/2021
Inspection denied due to lack of compliance with recent erosion control inspection reports
Misc
Corrective Action Required
02/05/2021
Inspection denied due to lack of compliance with recent erosion control inspection reports
Erosion Control Inspection Residential Failed 02/10/2021
Misc
Partial Correction
02/10/2021
-Erosion control requires continuous maintenance. Repair required at northwest corner of lot at curb line -no further inspections until issues are resolved
All Rough Inspection - Residential Failed 2/10/2021 2/10/2021 02/10/2021
Misc
Corrective Action Required
02/10/2021
-deck not ready for rough inspection -Fireblock top & bottom plate penetrations throughout -Fireblock vertical to horizontal, penetrations in attic insulation block -Fireblock all through floor Penetrations -Provide support for clothes dryer exhaust vent in attic space -12” oc fastening, stud to stud and abutting studs at intersecting braced walls -Nail plate protection at conductor stud penetration, dining room -Collar ties at ridges per plan -Identify white insulated Conductors to be used as current carrying Conductors at both point of termination -Penetrations in floor joists shall not be closer than 2 inches to the top or bottom of the member, or to any other hole located in the member. Replace or provide engineered solution for repair -Replace damaged joist hangers at headered floor joist -Pressure test gas piping -Anchor bolt required within 12 inches of plate splices, basement
Misc
Resolved
02/10/2021
Inspection denied due to lack of compliance with recent erosion control inspection reports
Misc
Resolved
02/10/2021
Electrical Service Inspection Passed 2/5/2021 02/10/2021
Gas Piping Inspection - Residential Failed 2/5/2021 02/10/2021
Misc
Corrective Action Required
02/10/2021
Pressure test gas piping minimum 10psi for 15 minutes
Gas Service Inspection - Residential Failed 2/5/2021 02/10/2021
All Rough Inspection - Residential Failed 2/18/2021 2/18/2021 02/18/2021
Misc
Corrective Action Required
02/10/2021
-deck not ready for rough inspection -adequate Fireblock of top & bottom plate penetrations throughout -Fireblock vertical to horizontal, penetrations in attic insulation block -Fireblock all through floor Penetrations -Provide support for clothes dryer exhaust vent in attic space -12” oc fastening, stud to stud and abutting studs at intersecting braced walls -Nail plate protection at conductor stud penetration, dining -Identify white insulated Conductors to be used as current carrying Conductors at both point of termination -Penetrations in floor joists shall not be closer than 2 inches to the top or bottom of the member, or to any other hole located in the member. Replace or provide engineered solution for repair -Pressure test gas piping -Anchor bolt required within 12 inches of plate splices, basement left of panel
Gas Piping Inspection - Residential Failed 2/18/2021 2/18/2021 02/18/2021
Misc
Corrective Action Required
02/10/2021
Pressure test gas piping minimum 10psi for 15 minutes
Gas Service Inspection - Residential Failed 2/18/2021 2/18/2021 02/18/2021
Erosion Control Inspection Residential Passed 02/18/2021
Misc
Resolved
02/18/2021
-Erosion control requires continuous maintenance. Repair required at northwest corner of lot at curb line -no further inspections until issues are resolved
All Rough Inspection - Residential Not Ready 2/22/2021 2/22/2021 02/22/2021
Misc
Corrective Action Required
02/18/2021
-deck not ready for rough inspection -Fireblock all through floor Penetrations -Penetrations in floor joists shall not be closer than 2 inches to the top or bottom of the member, or to any other hole located in the member. Replace or provide engineered solution for repair
Gas Piping Inspection - Residential Passed 2/22/2021 2/22/2021 02/22/2021
Misc
Resolved
02/22/2021
Pressure test gas piping minimum 10psi for 15 minutes
Gas Service Inspection - Residential Passed 2/22/2021 2/22/2021 02/22/2021
All Rough Inspection - Residential Passed 2/25/2021 2/25/2021 02/25/2021
Misc
Resolved
02/25/2021
-Penetrations in floor joists shall not be closer than 2 inches to the top or bottom of the member, or to any other hole located in the member. Replace or provide engineered solution for repair
Piers/Caissons Inspection - Residential Passed 2/25/2021 (9:45) 2/25/2021 02/25/2021
Driveway Inspection Passed 5/12/2021 5/12/2021 05/14/2021
Sidewalk Inspection Passed 5/12/2021 5/12/2021 05/14/2021
Occupancy Inspection - Codes Residential Failed 6/1/2021 6/1/2021 06/01/2021
Misc
Corrective Action Required
06/01/2021
-Outstanding fees to be paid in full -Maintenance of erosion control methods is required until sod is in place -Provide permanent building address -Final grade and sod -Install gutters and downspouts -Downspouts to discharge minimum 36 inches from foundation -Seal top and sides of AC disconnect -install attic access lid -provide self closing/latching garage/dwelling separation door -complete kitchen island plumbing -complete kitchen hood installation -install handrail to Basement -Remove pressure gauge from gas piping at furnace -Provide properly sized OCPD, condensing unit circuit maximum 45A -Remove debris and provide cap at open DWV in basement, by furnace
Occupancy Inspection - Codes Residential Failed 6/9/2021 6/9/2021 06/09/2021
Misc
Corrective Action Required
06/01/2021
-Maintenance of erosion control methods is required until sod is in place -Final grade and sod -Downspouts to discharge minimum 36 inches from foundation -complete kitchen island plumbing -Remove pressure gauge from gas piping at furnace -Remove debris and provide cap at open DWV in basement, by furnace
Erosion Control Inspection Residential Not Ready 06/11/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/09/2021
6-11-21 EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Occupancy Inspection - Codes Residential Failed 6/11/2021 6/11/2021 06/11/2021
Misc
Corrective Action Required
06/09/2021
-Maintenance of erosion control methods is required until sod is in place-(6-11-21) this has not been addressed through repeated inspections and a fee has been added. Provide erosion control or sod before any further inspections -Pay fees due before final occupancy -Final grade and sod -Downspouts to discharge minimum 36 inches from foundation -complete kitchen island plumbing-Provide hammer arrestor at kitchen sink
Occupancy Inspection - Codes Residential Temporary C of O 6/14/2021 6/14/2021 06/14/2021
Misc
Corrective Action Required
06/11/2021
-Final grade and sod -Downspouts to discharge minimum 36 inches from foundation -Lawn irrigation permit required TCO VALID THROUGH 7/14/21
Plot Plan Inspection Passed 7/15/2021 7/15/2021 07/15/2021
Erosion Control Inspection Residential Passed 7/15/2021 7/15/2021 07/15/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
07/15/2021
.
Erosion Control Inspection Residential Passed 7/15/2021 7/15/2021 07/15/2021
Occupancy Inspection - Codes Residential Full C of O 7/15/2021 7/15/2021 07/15/2021
Misc
Resolved
07/15/2021
Documents & Images
Date Uploaded File Type Document Name
09/14/2020 2758_001
09/14/2020 LOT 708 FINAL PLOT PLAN
09/14/2020 EGC708 Spec - Sealed Plans (September 10, 2020)
09/17/2020 Letter Codes Temporary Certificate of Occupancy
09/17/2020 Plans APPROVED HOUSE PLAN
09/18/2020 Engineer Letter - 2366 SW River Trail Rd - Lot 708
09/18/2020 Plot Plan APPROVED PLOT PLAN
09/18/2020 Receipt Receipt for transaction:2020-006344
09/18/2020 Letter DS Building Permit
10/14/2020 Letter INSPECTION SUMMARY
10/21/2020 Letter INSPECTION SUMMARY
11/23/2020 Letter INSPECTION SUMMARY
01/13/2021 Letter INSPECTION SUMMARY
01/19/2021 Letter INSPECTION SUMMARY
01/19/2021 Letter INSPECTION SUMMARY
01/19/2021 Letter INSPECTION SUMMARY
01/20/2021 Letter INSPECTION SUMMARY
01/20/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
02/05/2021 Letter INSPECTION SUMMARY
02/10/2021 Letter INSPECTION SUMMARY
02/10/2021 Letter INSPECTION SUMMARY
02/10/2021 Letter INSPECTION SUMMARY
02/10/2021 Letter INSPECTION SUMMARY
02/10/2021 Letter INSPECTION SUMMARY
02/18/2021 Letter INSPECTION SUMMARY
02/18/2021 Letter INSPECTION SUMMARY
02/18/2021 Letter INSPECTION SUMMARY
02/18/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/25/2021 Engineer Letter - 2366 SW River Trail Rd - Lot 708
02/25/2021 Letter INSPECTION SUMMARY
02/25/2021 Letter INSPECTION SUMMARY
05/14/2021 Letter INSPECTION SUMMARY
05/14/2021 Letter INSPECTION SUMMARY
06/01/2021 Letter INSPECTION SUMMARY
06/08/2021 Receipt Receipt for transaction:2021-004141
06/09/2021 Letter INSPECTION SUMMARY
06/09/2021 Letter INSPECTION SUMMARY
06/09/2021 Letter INSPECTION SUMMARY
06/11/2021 Letter INSPECTION SUMMARY
06/11/2021 Letter INSPECTION SUMMARY
06/11/2021 Receipt Receipt for transaction:2021-004326
06/14/2021 Letter Codes Temporary Certificate of Occupancy
07/15/2021 Letter INSPECTION SUMMARY
07/15/2021 Letter INSPECTION SUMMARY
07/15/2021 Letter INSPECTION SUMMARY
07/15/2021 Letter Field Certificate of Occupancy
07/15/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home