Permit Application Status

PRRES20201796


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20201796
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - COVERED PATIO - FINISHED BASEMENT
07/01/2020
07/13/2020
03/28/2023
Locations
Contacts
WYSS HOME BUILDING LLC, Address:PO BOX 6620, Phone:(816) 820-0142  
MIKE BRYANT HEATING & COOLING , Address:1711 E 123RD , Phone:(913) 441-7807  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
ROBERTSON PLUMBING LLC, Address:PO BOX 165, Phone:(816) 781-9340  
MCRWYSS@HOTMAIL.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 07/06/2020 07/10/2020
Kim Brennan
Misc
Corrective Action Required
07/01/2020

Property address must be listed on all pages of the drawings
Miscellaneous Correction
Corrective Action Required
07/01/2020

Mechanical and Electrical contractors do not have a valid business license
Plot Plan Review Approved 07/06/2020 07/02/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $943.68 $943.68 Paid 07/13/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 07/13/2020
7232302-Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 07/13/2020
8331507-Sewer Connection Fee $390.00 $390.00 Paid 07/13/2020
8331401-Water Tap Fee $3,581.00 $3,581.00 Paid 07/13/2020
8350015-Water Meter Fee $455.54 $455.54 Paid 07/13/2020
9110078-Valuation Fee New Single Family $82.37 $82.37 Paid 09/09/2021
$1,026.05
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 12/29/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 8/20/2020 (9:00) 8/20/2020 08/20/2020
Misc
Corrective Action Required
08/20/2020
- WRONG PLAN SET ON SITE, DOESNT MATCH FORMS SET. - PLAN SET ON SITE IS NOT CITY STAMPED APPROVED SET NO INSPECTION PERFORMED
Footing Inspection - Residential Failed 8/21/2020 (8:30) 8/21/2020 08/21/2020
Misc
Corrective Action Required
08/20/2020
- CITY APPROVED PLANS ON SITE DO NOT MATCH LAYOUT AND FORMS SET FOR FOOTINGS
Footing Inspection - Residential Passed 8/24/2020 (8:00) 8/24/2020 08/21/2020
Misc
Informational
08/21/2020
- contractor to submit revised plans, footing is mirrored from drawings. OK to proceed
Foundation Inspection - Residential Passed 9/9/2020 (1:30) 9/9/2020 09/09/2020
Sewer Service Inspection - R Passed 11/9/2020 (8:45) 11/9/2020 11/09/2020
Water Service Inspection - R Partial 11/9/2020 (8:45) 11/9/2020 11/09/2020
Misc
Informational
11/09/2020
- PARTIAL INSPECTION ON PEX ENTRANCE THROUGH HOUSE AND THROUGH FRONT YARD. METER, TAP, COPPER YET TO BE INSPECTED. OK TO COVER PORTION INSPECTED
Water Service Inspection - R Passed 11/10/2020 11/10/2020
Misc
Resolved
11/10/2020
Underslab Plumbing Inspection - Residential Failed 11/12/2020 11/12/2020 11/12/2020
Misc
Corrective Action Required
11/12/2020
INSPECTION DENIED - EROSION CONTROL REQUIRED AT FRONT OF LOT, MAINTAIN SILT FENCE - CLEAN MUD AND GRAVEL FROM STREET
Erosion Control Inspection Residential Failed 11/12/2020 11/12/2020 11/12/2020
Misc
Corrective Action Required
11/12/2020
- EROSION CONTROL REQUIRED AT FRONT OF LOT, MAINTAIN SILT FENCE - CLEAN MUD AND GRAVEL FROM STREET
Underslab Plumbing Inspection - Residential Passed 11/16/2020 11/16/2020 11/16/2020
Misc
Resolved
11/16/2020
Erosion Control Inspection Residential Failed 6/4/2021 6/4/2021 06/04/2021
Misc
Resolved
06/04/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
06/04/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. - EROSION CONTROL REQUIRED AT FRONT OF LOT, MAINTAIN SILT FENCE - CLEAN MUD AND GRAVEL FROM STREET
Electrical Service Inspection Passed 8/27/2021 08/27/2021
Gas Service Inspection - Residential Passed 8/27/2021 08/27/2021
All Rough Inspection - Residential Failed 8/27/2021 08/27/2021
Misc
Corrective Action Required
08/27/2021
-submit revised plans for approval and have on site at reinspect, finished basement add to permit covered deck, revise plot plan to include deck, no pier inspection performed -Add joist hanger to tail joist connection at attic access, over 4’ -Fireblock between top plates at dbl wall, garage wall -secure all vertical DWV 2” or less at mid point -Nail all joist hangers throughout -seal low volt/data top plate penetration west side 1st floor bed and NM penetration at closet -security blocking at deck door -Install sgd at deck -Add ceiling joist to sgl joist to header connection, 1st floor great room near sgd -Fireblock fireplace at area open to attic on master bed wall and both sides of entertainment bookcases -secure gas flex line at fireplace and protect gas line at fireplace entrance -add joist hangers at sgl to dbl joist connection at front foyer and front East bath 1st floor -strap dbl top plates with plate breaks less than 24” - see 1st floor front East and west bathrooms -unable to inspect covered porch and covered deck framing with cover, remove a few panels to allow for inspection of construction -fireblock vertical to horizontal at furred down and soffit ends basement -fireblock beam pockets at basement -secure/support NM every 4.5’ through furred downs -Fireblock deadspace at column/beam chase, basement den west wall -Nail all exterior sheathing per plans
Piers/Caissons Inspection - Residential Failed 9/10/2021 9/10/2021 09/10/2021
Misc
Corrective Action Required
09/10/2021
DECK PIERS POURED WITHOUT INSPECTION, SUBMIT ENGINEER REPORT
Occupancy Inspection - Codes Residential Failed 9/10/2021 9/10/2021 09/10/2021
Misc
Corrective Action Required
09/10/2021
REVISED PLOT PLAN REQUIRED BEFORE C OF O FOR DECK THAT HAS BEEN EXPANDED FROM APPROVED PLANS, DECK INCOMPLETE AT ROUGH INSPECTION, DECK PIERS POURED WITHOUT INSPECTION, ENGINEER REPORT REQUIRED
Gas Piping Inspection - Residential Passed 9/10/2021 9/10/2021 09/10/2021
All Rough Inspection - Residential Passed 9/10/2021 9/10/2021 09/10/2021
Sidewalk Inspection Passed 11/22/2021 11/22/2021 11/24/2021
Misc
Informational
11/22/2021
On 11/22/2021 I performed a sidewalk inspection and pass the subgrade to pour concrete
Driveway Inspection Passed 11/19/2021 11/19/2021 11/24/2021
Misc
Informational
11/19/2021
On 11/19/2021 We meet with contractor, Dan Dusseliner Concrete Finishing to discuss concrete forming for driveway, sidewalk, and handicap ramp. The layout was approved for sub-grade compaction. Inspector Tommy Taylor was onsite. 11/22/2021 I performed a driveway inspection and pass the sub-grade to pour concrete.
Occupancy Inspection - Codes Residential Failed 12/28/2021 12/28/2021 12/28/2021
Misc
Corrective Action Required
09/10/2021
REVISED PLOT PLAN REQUIRED BEFORE C OF O FOR DECK THAT HAS BEEN EXPANDED FROM APPROVED PLANS, DECK INCOMPLETE AT ROUGH INSPECTION, DECK PIERS POURED WITHOUT INSPECTION, ENGINEER REPORT REQUIRED
Miscellaneous Correction
Corrective Action Required
12/28/2021
- final grading and sod - splash blocks - sump discharge 36” from foundation - Secondary lock on basement slider - Provide 2 , 1/2” through bolts or equivalent at post to beam connections at deck
Occupancy Inspection - Codes Residential Temporary C of O 12/28/2021 12/28/2021
Misc
Corrective Action Required
12/28/2021
REVISED PLOT PLAN REQUIRED BEFORE C OF O FOR DECK THAT HAS BEEN EXPANDED FROM APPROVED PLANS, DECK INCOMPLETE AT ROUGH INSPECTION, DECK PIERS POURED WITHOUT INSPECTION, ENGINEER REPORT REQUIRED
Miscellaneous Correction
Corrective Action Required
12/28/2021
- final grading and sod - splash blocks - sump discharge 36” from foundation - Sidewalk and driveway inspection pending - Provide 2 , 1/2” through bolts or equivalent at post to beam connections at deck
Driveway Inspection Passed 11/22/2021 11/22/2021 04/28/2022
Misc
Informational
11/19/2021
On 11/19/2021 We meet with contractor, Dan Dusseliner Concrete Finishing to discuss concrete forming for driveway, sidewalk, and handicap ramp. The layout was approved for sub-grade compaction. Inspector Tommy Taylor was onsite.
Occupancy Inspection - Codes Residential Failed 11/9/2022 11/09/2022
Misc
Corrective Action Required
12/28/2021
REVISED PLOT PLAN REQUIRED BEFORE C OF O FOR DECK THAT HAS BEEN EXPANDED FROM APPROVED PLANS, DECK INCOMPLETE AT ROUGH INSPECTION, DECK PIERS POURED WITHOUT INSPECTION, ENGINEER REPORT REQUIRED
Miscellaneous Correction
Corrective Action Required
12/28/2021
-sidwalk inspection still pending - Provide 2 , 1/2” through bolts or equivalent at post to beam connections at deck
Miscellaneous Inspection Passed 11/9/2022 11/09/2022
Misc
Informational
11/09/2022
spoke with Mike the builder who is going to get with engineer for items needed.
Sidewalk Inspection Failed 11/9/2022 11/09/2022
Misc
Informational
11/22/2021
On 11/22/2021 I performed a sidewalk inspection and pass the subgrade to pour concrete 11-9-22 RH. Two panels were cracked and will need replaced before passing.
Plot Plan Inspection Passed 11/18/2022 11/18/2022
Sidewalk Inspection Partial 11/21/2022 11/21/2022 11/21/2022
Misc
Informational
11/09/2022
On 11/22/2021 I performed a sidewalk inspection and pass the subgrade to pour concrete 11-9-22 RH. Two panels were cracked and will need replaced before passing. 11-21-22 RH. Sidewalk is formed up and aggregate is placed and compacted.
Sidewalk Inspection Passed 11/23/2022 11/23/2022 11/23/2022
Misc
Informational
11/21/2022
On 11/22/2021 I performed a sidewalk inspection and pass the subgrade to pour concrete 11-9-22 RH. Two panels were cracked and will need replaced before passing. 11-21-22 RH. Sidewalk is formed up and aggregate is placed and compacted. 11-23-22 RH. Sidewalk passed LS and ADA specification.
Occupancy Inspection - Codes Residential Full C of O 03/28/2023
Misc
Resolved
03/28/2023
REVISED PLANS/ PLOT PLAN REQUIRED BEFORE C OF O FOR DECK THAT HAS BEEN EXPANDED FROM APPROVED PLANS, DECK INCOMPLETE AT ROUGH INSPECTION
Miscellaneous Correction
Resolved
03/28/2023
-sidwalk inspection still pending - Provide 2 , 1/2” through bolts or equivalent at post to beam connections at deck
Documents & Images
Date Uploaded File Type Document Name
07/01/2020 Letter Permit Application
07/01/2020 License_Tax_Application
07/02/2020 Plot Plan Approved Plot Plan
07/02/2020 Letter Codes Residential Plan Review
07/10/2020 Drawing Approved Drawings
07/13/2020 Receipt Receipt for transaction:2020-004396
07/13/2020 Letter DS Building Permit
08/20/2020 Letter INSPECTION SUMMARY
08/21/2020 Letter INSPECTION SUMMARY
08/21/2020 Letter INSPECTION SUMMARY
09/09/2020 Letter INSPECTION SUMMARY
11/09/2020 Letter INSPECTION SUMMARY
11/09/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/12/2020 Letter INSPECTION SUMMARY
11/12/2020 Letter INSPECTION SUMMARY
11/16/2020 Letter INSPECTION SUMMARY
06/04/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter INSPECTION SUMMARY
09/08/2021 Approved Plans APPROVED DRAWINGS
09/08/2021 Scope of Work SCOPE OF WORK
09/09/2021 Receipt Receipt for transaction:2021-007240
09/10/2021 Letter INSPECTION SUMMARY
09/10/2021 Letter INSPECTION SUMMARY
09/10/2021 Letter INSPECTION SUMMARY
09/10/2021 Letter INSPECTION SUMMARY
11/19/2021 Letter INSPECTION SUMMARY
11/22/2021 Letter INSPECTION SUMMARY
11/22/2021 Letter INSPECTION SUMMARY
11/22/2021 Letter INSPECTION SUMMARY
11/24/2021 Letter INSPECTION SUMMARY
11/24/2021 Letter INSPECTION SUMMARY
11/24/2021 Letter INSPECTION SUMMARY
11/24/2021 Letter INSPECTION SUMMARY
12/13/2021 Letter INSPECTION SUMMARY
12/28/2021 Letter INSPECTION SUMMARY
12/28/2021 Letter Codes Temporary Certificate of Occupancy
12/29/2021 Receipt Receipt for transaction: 2021-009541
04/28/2022 Letter INSPECTION SUMMARY
05/17/2022 Letter Codes 140 Day Letter
06/01/2022 Letter Codes 140 Day Letter
09/15/2022 Letter Codes 140 Day Letter
09/15/2022 Letter 10-Day Notice of Violation
11/09/2022 Letter INSPECTION SUMMARY
11/09/2022 Letter INSPECTION SUMMARY
11/17/2022 Plot Plan Approved As-Graded Plot Plan
11/21/2022 Letter INSPECTION SUMMARY
11/23/2022 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home