Summary
PRRES20201012
Building Permit - Residential
Certificate of Occupancy
ACH DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW SINGLE FAMILY PARTIALLY FINISHED BASEMENT COVERED DECK
04/21/2020
04/29/2020
05/11/2021
Locations
Contacts
ACH DEVELOPMENT LLC, Address:3170 NE CARNEGIE DR STE 400  
CAPITAL CONSTRUCTION SERVICES LLC, Address:2642 NE HAGAN RD, Phone:(816) 875-0018  
DROTHFUSS@CAPITALCONST.COM  
INHOME SYSTEMS LLC, Address:510 MISSION RD SW, Phone:(816) 372-0483  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
A BRIGHT PLUMBING LLC, Address:18107 E 18TH TER N, Phone:(816) 215-0730  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 04/24/2020 04/24/2020
Steve Conrick
Residential Plan Review Approved 04/24/2020 04/24/2020
Steve Conrick
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,190.92 $1,190.92 Paid 04/29/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 04/29/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 04/29/2020
8331507-Sewer Connection Fee $540.00 $540.00 Paid 04/29/2020
8331401-Water Tap Fee $3,477.00 $3,477.00 Paid 04/29/2020
8350015-Water Meter Fee $425.02 $425.02 Paid 04/29/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 5/21/2020 (1:00) 5/21/2020 at 1:15 PM 05/21/2020
Underslab Plumbing Inspection - Residential Passed 6/11/2020 6/11/2020 at 8:25 AM 06/11/2020
Sewer Service Inspection - R Passed 6/17/2020 6/16/2020 at 1:45 PM 06/16/2020
Water Service Inspection - R Passed 7/2/2020 (10:45) 7/2/2020 07/02/2020
Erosion Control Inspection Residential Failed 7/2/2020 07/02/2020
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
07/02/2020
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. **CLEAN THE STREET AND REESTABLISH THE EROSION CONTROL
Misc
Corrective Action Required
09/08/2020
Large amounts of sediment on NE Park Ridge Dr. from failed erosion control silt fence. Existing silt fencing needs to be re-stake and street needs sediment needs to be removed from street. 9/8/20 9:00AM It appears that Capital Construction is correcting the issue of sediment in the street.
All Rough Inspection - Residential Failed 9/29/2020 9/29/2020 09/29/2020
Misc
Corrective Action Required
09/29/2020
FRAMING: -Fb spaces from roof: spaces at fireplace shelves; all wall spaces around master shower -Some hangers missing nails at lvl beam connections above great room -Nail wall corner studs inside foyer closet -Fb wall space at stair both vertically every ten ft or less and at top per code; Fb basement wall per code -Add more support studs for I beam at basement stair -Install (3)2x4 support for ridge at front bedroom rear wall PLUMBING: -Complete gas piping -Protect plumbing at foyer closet -Support vent above master bedroom walkway MECHANICAL: -Seal gap at top of return air space at master bedroom/shower wall -Provide combustion air openings per code ELECTRICAL: -Flood light -Protect wiring at front bedroom wall near door -Make sure the light have proper clearance from closet shelf of basement bedrooms **OK TO INSULATE
Electrical Service Inspection Failed 9/29/2020 9/29/2020 09/29/2020
Misc
Corrective Action Required
09/29/2020
-Isolate grounded conductors from grounding conductors at sub panel -Install a #4 Cu or #2 Al jumper from lower grounding bus bar to upper grounded bus bar where the service grounded conductor is connected to -Bond the metal connector between meter and disconnect enclosure per 250.92 -Install a missing bonding leg. Don’t violate equipment UL listing
Gas Service Inspection - Residential Failed 9/29/2020 9/29/2020 09/29/2020
Misc
Corrective Action Required
09/29/2020
-Not ready
All Rough Inspection - Residential Passed 9/30/2020 9/30/2020 09/30/2020
Misc
Resolved
09/30/2020
FRAMING: -Fb spaces from roof: spaces at fireplace shelves; all wall spaces around master shower -Some hangers missing nails at lvl beam connections above great room -Nail wall corner studs inside foyer closet -Fb wall space at stair both vertically every ten ft or less and at top per code; Fb basement wall per code -Add more support studs for I beam at basement stair -Install (3)2x4 support for ridge at front bedroom rear wall PLUMBING: -Complete gas piping -Protect plumbing at foyer closet -Support vent above master bedroom walkway MECHANICAL: -Seal gap at top of return air space at master bedroom/shower wall -Provide combustion air openings per code ELECTRICAL: -Flood light -Protect wiring at front bedroom wall near door -Make sure the light have proper clearance from closet shelf of basement bedrooms **OK TO INSULATE
Electrical Service Inspection Passed 9/30/2020 9/30/2020 09/30/2020
Misc
Resolved
09/30/2020
-Isolate grounded conductors from grounding conductors at sub panel -Install a #4 Cu or #2 Al jumper from lower grounding bus bar to upper grounded bus bar where the service grounded conductor is connected to -Bond the metal connector between meter and disconnect enclosure per 250.92 -Install a missing bonding leg. Don’t violate equipment UL listing
Gas Service Inspection - Residential Passed 9/30/2020 9/30/2020 09/30/2020
Misc
Resolved
09/30/2020
-Not ready
Driveway Inspection Partial 10/14/2020 (P.M.) 10/14/2020 10/15/2020
Misc
Informational
10/15/2020
Driveway - forms and materials passed pre- inspection.
Sidewalk Inspection Partial 10/16/2020 (P.M.) 10/16/2020 10/15/2020
Misc
Informational
10/15/2020
Sidewalk - forms and materials passed pre-inspection.
Driveway Inspection Passed 10/19/2020 10/19/2020 10/19/2020
Misc
Informational
10/15/2020
Driveway - forms and materials passed pre- inspection.
Misc
Informational
10/19/2020
Driveway - passed final inspection.
Sidewalk Inspection Passed 10/19/2020 10/19/2020 10/19/2020
Misc
Informational
10/15/2020
Sidewalk - forms and materials passed pre-inspection.
Misc
Informational
10/19/2020
Sidewalk - passed final inspection.
Erosion Control Inspection Residential Passed 01/20/2021
DCM2 ESC DEFICIENT INSTALLATION
Resolved
01/20/2021
DEFICIENT EROSION CONTROL INSTALLATION. NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED. **CLEAN THE STREET AND REESTABLISH THE EROSION CONTROL
Occupancy Inspection - Codes Residential Temporary C of O 1/20/2021 1/20/2021 01/20/2021
Corrective Action Required
01/20/2021
-Obtain lawn irrigation permit and submit the backflow test report to city -Final grade, sod, downspout and sump pump extensions -Seal exterior wall penetrations, seal above AC disconnect, meter, etc -Support loose receptacle yoke at front entry -Install airtight plug for the sewer clean out -Provide min 100 sq inch combustion air openings
Occupancy Inspection - Codes Residential Temporary C of O 1/21/2021 1/21/2021 01/21/2021
Misc
Corrective Action Required
01/20/2021
-Obtain lawn irrigation permit and submit the backflow test report to city -Final grade, sod, downspout and sump pump extensions -Seal exterior wall penetrations, seal above AC disconnect, meter, etc -Support loose receptacle yoke at front entry -Sewer cleanout must be accessible
Occupancy Inspection - Codes Residential Full C of O 5/11/2021 5/11/2021 05/11/2021
Misc
Resolved
05/11/2021
-Final grade, sod, downspout and sump pump extensions -Seal exterior wall penetrations, seal above AC disconnect, meter, etc -Support loose receptacle yoke at front entry
Documents & Images
Date Uploaded File Type Document Name
04/21/2020 Sharp Copier_20200421_094946
04/22/2020 Plot Plan - LOT 293-FINAL
04/22/2020 Permit Set - Lot 293
04/24/2020 APPROVED Permit Set - Lot 293
04/24/2020 APPROVED PLOT PLAN
04/29/2020 Receipt Receipt for transaction:2020-001789
04/29/2020 Letter DS Building Permit
05/21/2020 Letter INSPECTION SUMMARY
06/11/2020 Letter INSPECTION SUMMARY
06/16/2020 Letter INSPECTION SUMMARY
07/02/2020 Letter INSPECTION SUMMARY
07/02/2020 Letter INSPECTION SUMMARY
09/08/2020 Letter INSPECTION SUMMARY
09/29/2020 Letter INSPECTION SUMMARY
09/29/2020 Letter INSPECTION SUMMARY
09/29/2020 Letter INSPECTION SUMMARY
09/30/2020 Letter INSPECTION SUMMARY
09/30/2020 Letter INSPECTION SUMMARY
09/30/2020 Letter INSPECTION SUMMARY
10/15/2020 Letter INSPECTION SUMMARY
10/15/2020 Letter INSPECTION SUMMARY
10/15/2020 Letter INSPECTION SUMMARY
10/19/2020 Letter INSPECTION SUMMARY
10/19/2020 Letter INSPECTION SUMMARY
01/20/2021 Letter INSPECTION SUMMARY
01/20/2021 Letter Codes Temporary Certificate of Occupancy
01/20/2021 Letter INSPECTION SUMMARY
01/21/2021 Letter INSPECTION SUMMARY
01/21/2021 Letter Codes Temporary Certificate of Occupancy
05/11/2021 Letter Codes Final Certificate of Occupancy
05/11/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home