Permit Application Status

PRRES20200839


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20200839
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO
04/01/2020
06/09/2020
05/13/2021
Locations
Contacts
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
DUSTIN@SUMMITHOMESKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 04/03/2020 04/03/2020
Kim Brennan
37 Provide details for any walls over 10 feet in height.
Corrective Action Required
04/01/2020

Provide details for any walls over 10 feet in height. Include stud grade, size, spacing and actual, uninterrupted height. (IRC Section 602.3.1 and Table 602.3(5) & 602.3.1)
Plot Plan Review Approved 04/03/2020 04/02/2020
Kim Brennan
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,405.51 $1,405.51 Paid 06/09/2020
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 06/09/2020
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 06/09/2020
8331504-EFHB Middle Big Creek, Full $669.60 $669.60 Paid 06/09/2020
8331507-Sewer Connection Fee $600.00 $600.00 Paid 06/09/2020
8331401-Water Tap Fee $3,477.00 $3,477.00 Paid 06/09/2020
8350015-Water Meter Fee $425.02 $425.02 Paid 06/09/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/19/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 04/19/2021
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 04/19/2021
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 04/19/2021
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 04/19/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Failed 07/24/2020
Misc
Corrective Action Required
07/24/2020
- Footing poured without inspection, submit third party inspection report
Footing Inspection - Residential Passed 7/30/2020 7/30/2020 07/30/2020
Misc
Resolved
07/30/2020
All Rough Inspection - Residential Not Ready 8/10/2020 8/10/2020 08/10/2020
Misc
Corrective Action Required
08/10/2020
NO INSPECTION PERFORMED, NOT READY FOR ROUGH IN INSPECTION, ONLY FOOTING POURED
Erosion Control Inspection Residential Failed 9/8/2020 9/8/2020 09/08/2020
Misc
Corrective Action Required
09/08/2020
Erosion control requires continuous maintenance. Repair damage section at curbside and remove debris from street
Underslab Plumbing Inspection - Residential Passed 9/8/2020 9/8/2020 09/08/2020
Sewer Service Inspection - R Passed 12/8/2020 (1:30) 12/8/2020 12/08/2020
Water Service Inspection - R Passed 12/10/2020 (9:45) 12/10/2020 12/10/2020
Electrical Service Inspection Passed 12/18/2020 12/18/2020 12/18/2020
Gas Piping Inspection - Residential Failed 12/18/2020 12/18/2020 12/18/2020
Misc
Corrective Action Required
12/18/2020
-SECURE GAS FLEX LINE AT FIREPLACE
Gas Service Inspection - Residential Failed 12/18/2020 12/18/2020 12/18/2020
Misc
Corrective Action Required
12/18/2020
-GAS PRESSURE AT 7 PSI, MUST MAINTAIN 10 PSI FOR TEST
All Rough Inspection - Residential Failed 12/18/2020 12/18/2020 12/18/2020
Misc
Corrective Action Required
08/10/2020
-H2.5 straps at all trusses- garage, 2nd floor -Seal all top plate and bottom plate penetrations -pan off cantilever in garage -Fireblock all tub and shower traps -Fireblock vertical to horizontal at furred down in garage -Fireblock HVAC chase garage -H2.5 straps at all hip trusses -12” oc nailing at all abutting and intersecting wall corners (braced wall panels) -Fireblock deadspace kitchen -Stud shoes at kitchen exterior wall for DWV -Secure gas flex line at fireplace -Fireblock HVAC chase living room -EC#2 per plans -Attic access per plans -Truss hangers per plans -Remove lid at front porch to allow for inspection of trusses and truss hangers -connect 2x6 to 2x4 top plates at 2nd floor stairs -Nail all dbl truss girders together per plans -nail all H2.5 truss straps and truss hangers - 2nd floor -solid blocking between joists every 48” oc for kitchen island per plans -Flashing at dbl garage door -Nail sheathing per plans- 6” edge, 12” field
Gas Piping Inspection - Residential Failed 12/28/2020 12/28/2020 12/28/2020
Misc
Corrective Action Required
12/18/2020
-SECURE GAS FLEX LINE AT FIREPLACE
Gas Service Inspection - Residential Failed 12/28/2020 12/28/2020 12/28/2020
Misc
Corrective Action Required
12/18/2020
-GAS PRESSURE AT 7 PSI, MUST MAINTAIN 10 PSI FOR TEST
All Rough Inspection - Residential Not Ready 12/28/2020 12/28/2020 12/28/2020
Misc
Corrective Action Required
12/18/2020
-H2.5 straps at all trusses- garage, 2nd floor -Seal all top plate and bottom plate penetrations -pan off cantilever in garage -Fireblock all tub and shower traps -Fireblock vertical to horizontal at furred down in garage -Fireblock HVAC chase garage -H2.5 straps at all hip trusses -12” oc nailing at all abutting and intersecting wall corners (braced wall panels) -Fireblock deadspace kitchen -Stud shoes at kitchen exterior wall for DWV -Secure gas flex line at fireplace -Fireblock HVAC chase living room -EC#2 per plans -Attic access per plans -Truss hangers per plans -Remove lid at front porch to allow for inspection of trusses and truss hangers -connect 2x6 to 2x4 top plates at 2nd floor stairs -Nail all dbl truss girders together per plans -nail all H2.5 truss straps and truss hangers - 2nd floor -solid blocking between joists every 48” oc for kitchen island per plans -Flashing at dbl garage door -Nail sheathing per plans- 6” edge, 12” field
Gas Service Inspection - Residential Passed 1/8/2021 1/8/2021 01/08/2021
Misc
Resolved
01/08/2021
Gas Piping Inspection - Residential Failed 1/8/2021 1/8/2021 01/08/2021
Misc
Corrective Action Required
12/28/2020
-SECURE GAS FLEX LINE AT FIREPLACE
All Rough Inspection - Residential Failed 1/8/2021 1/8/2021 01/08/2021
Misc
Corrective Action Required
12/28/2020
-H2.5 straps at all trusses- 2nd floor -Seal all top plate and bottom plate penetrations -Fireblock HVAC chase garage -H2.5 straps at all hip trusses -1st floor bed -12” oc nailing at all abutting and intersecting wall corners (braced wall panels) -Fireblock deadspace kitchen -Stud shoes at kitchen exterior wall for DWV -Secure gas flex line at fireplace -EC#2 per plans -Attic access per plans -2nd floor -Truss hangers per plans -connect 2x6 to 2x4 top plates at 2nd floor stairs -Nail all dbl truss girders together per plans -nail all H2.5 truss straps and truss hangers - 2nd floor -Flashing at dbl garage door -Nail sheathing per plans- 6” edge, 12” field
All Rough Inspection - Residential Failed 1/12/2021 1/12/2021 01/12/2021
Misc
Corrective Action Required
01/08/2021
-Reestablish silt fence at front of lot and clean mud and gravel from street, correct issues before scheduling reinspection -Fireblock HVAC chase garage -seal gaps in Fireblock around HVAC, DWV -Truss hangers per plans- patio, front porch, garage -EC#2 per plans OK to Insulate
Erosion Control Inspection Residential Failed 1/12/2021 1/12/2021 01/12/2021
Misc
Resolved
01/12/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/12/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. MAINTAIN SILT FENCE AT FRONT OF LOT, CLEAN MUD AND GRAVEL FROM STREET BEFORE SCHEDULING REINSPECTION
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/12/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. MAINTAIN SILT FENCE AT FRONT OF LOT, CLEAN MUD AND GRAVEL FROM STREET BEFORE SCHEDULING REINSPECTION
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/12/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE.
Gas Piping Inspection - Residential Passed 1/12/2021 1/12/2021 01/12/2021
Misc
Resolved
01/12/2021
All Rough Inspection - Residential Failed 1/14/2021 1/14/2021 01/14/2021
Misc
Corrective Action Required
01/12/2021
-Truss hangers per plans- garage C7 truss OK to Insulate
All Rough Inspection - Residential Passed 1/15/2021 1/15/2021 01/15/2021
Misc
Resolved
01/15/2021
Erosion Control Inspection Residential Failed 01/25/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/25/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. MAINTAIN SILT FENCE AT FRONT OF LOT, CLEAN MUD AND GRAVEL FROM STREET BEFORE SCHEDULING REINSPECTION
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
01/25/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. MAINTAIN SILT FENCE AT FRONT OF LOT, CLEAN MUD AND GRAVEL FROM STREET BEFORE SCHEDULING REINSPECTION
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
01/25/2021
EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. -MAINTAIN SILT FENCE AT FRONT OF LOT, -CLEAN MUD AND GRAVEL FROM STREET
Driveway Inspection Partial 2/3/2021 (P.M.) 2/3/2021 02/03/2021
Misc
Informational
02/03/2021
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Partial 2/3/2021 (P.M.) 2/3/2021 02/03/2021
Misc
Informational
02/03/2021
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Passed 2/10/2021 2/10/2021 02/22/2021
Misc
Informational
02/03/2021
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Passed 2/10/2021 2/10/2021 02/22/2021
Misc
Informational
02/03/2021
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Partial 3/11/2021 3/11/2021 03/11/2021
Misc
Informational
03/11/2021
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Passed 3/18/2021 3/18/2021 03/22/2021
Misc
Informational
03/11/2021
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Occupancy Inspection - Codes Residential Failed 4/21/2021 4/21/2021 04/21/2021
Misc
Corrective Action Required
04/21/2021
-provide security screws at back door, (2) 3” screws at each hinge and strike plate -Handrail required at garage stairs, 4 rises -pan off bottom of chase in garage -lighting control switch required at bottom basement stair, more than 6 rises between floor levels -AFCI protection required at washer circuit -Hot water heater discharge pipe shall terminate not more than 6” and not less than two times pipe diameter above the floor -Ensure grade has fall not fewer than 6” within the first 10’ or foundation at rear of house -Locate and uncover water meter lid
Plot Plan Inspection Passed 5/13/2021 5/13/2021 05/13/2021
Erosion Control Inspection Residential Passed 05/13/2021
DCM1 ESC REQUIRED NO FURTHER INSP
Resolved
05/13/2021
Occupancy Inspection - Codes Residential Full C of O 5/13/2021 5/13/2021 05/13/2021
Misc
Resolved
05/13/2021
Documents & Images
Date Uploaded File Type Document Name
04/01/2020 Letter Permit Application
04/02/2020 Letter Codes Residential Plan Review
04/02/2020 Plot Plan RR #62 - FINAL PLOT PLAN
04/02/2020 Plans 62 RESERVE AT STONEY CREEK 1ST FLOOR LAYOUT- signed
04/02/2020 Plans 62 RESERVE AT STONEY CREEK 2ND FLOOR LAYOUT- signed
04/02/2020 Plans Roof Truss Package
04/06/2020 Plans Approved Plans
06/09/2020 Receipt Receipt for transaction:2020-002810
06/09/2020 Letter DS Building Permit
07/24/2020 Letter INSPECTION SUMMARY
07/30/2020 Lot 62 Reserve at Stoney Creek - Footing Inspection
07/30/2020 Letter INSPECTION SUMMARY
08/10/2020 Letter INSPECTION SUMMARY
08/14/2020 62 Reserve at Stoney Creek wall
09/08/2020 Letter INSPECTION SUMMARY
09/08/2020 Letter INSPECTION SUMMARY
12/08/2020 Letter INSPECTION SUMMARY
12/10/2020 Letter INSPECTION SUMMARY
12/18/2020 Letter INSPECTION SUMMARY
12/18/2020 Letter INSPECTION SUMMARY
12/18/2020 Letter INSPECTION SUMMARY
12/18/2020 Letter INSPECTION SUMMARY
12/28/2020 Letter INSPECTION SUMMARY
12/28/2020 Letter INSPECTION SUMMARY
12/28/2020 Letter INSPECTION SUMMARY
01/08/2021 Letter INSPECTION SUMMARY
01/08/2021 Letter INSPECTION SUMMARY
01/08/2021 Letter INSPECTION SUMMARY
01/12/2021 Letter INSPECTION SUMMARY
01/12/2021 Letter INSPECTION SUMMARY
01/12/2021 Letter INSPECTION SUMMARY
01/14/2021 Letter INSPECTION SUMMARY
01/15/2021 Letter INSPECTION SUMMARY
01/25/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
02/03/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
02/22/2021 Letter INSPECTION SUMMARY
03/11/2021 Letter INSPECTION SUMMARY
03/22/2021 Letter INSPECTION SUMMARY
04/19/2021 Receipt Receipt for transaction:2021-002052
04/21/2021 Letter INSPECTION SUMMARY
05/13/2021 Letter INSPECTION SUMMARY
05/13/2021 Letter INSPECTION SUMMARY
05/13/2021 Letter Field Certificate of Occupancy
05/13/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home