Summary
PRRES20193476
Building Permit - Residential
Certificate of Occupancy
CLAYTON PROPERTIES GROUP INC
NEW SINGLE FAMILY
NEW HOUSE - PARTIAL FINISHED BASEMENT - COVERED DECK - ROOF TRUSS
11/26/2019
12/05/2019
10/09/2020
Locations
Contacts
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH ST  
CLAYTON PROPERTIES GROUP, INC, Address:120 SE 30TH ST, Phone:(816) 246-6700  
PERMITTING@SUMMITHOMESKC.COM  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
ARROW CIRCLE ELECTRIC, Address:1224 SE CENTURY DR, Phone:(816) 373-4888  
RELIABLE MECHANICAL SERVICES INC, Address:1025 W COUCHMAN DR, Phone:(816) 903-7674  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 12/02/2019 12/04/2019
Dylan Eppert
Spot elevations
Corrective Action Required
12/02/2019

Spot elevations and/or drainage flow arrows shall be provided throughout the lot. SE PROPERTY CORNER ELEVATION IS VERY DIFFERENT FROM FINISHED ELEVATIONS ON MDP PLEASE CLARIFY.
Residential Plan Review Approved 12/02/2019 11/27/2019
Dylan Eppert
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,300.54 $1,300.54 Paid 12/05/2019
8331507-Sewer Connection Fee $510.00 $510.00 Paid 12/05/2019
8331401-Water Tap Fee $3,477.00 $3,477.00 Paid 12/05/2019
8350015-Water Meter Fee $425.02 $425.02 Paid 12/05/2019
9110073-Right of Way Permit Fee $80.00 $80.00 Paid 12/05/2019
7232302-Residential License Tax Fee $1,077.12 $1,077.12 Paid 12/05/2019
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/29/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/29/2020
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 05/29/2020
9110080-3rd and Subsequent Inspection Fee (Per Hour) $50.00 $50.00 Paid 05/29/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/31/2019 12/31/2019 12/31/2019
Foundation Inspection - Residential Passed 1/7/2020 (3:00) 1/7/2020 01/07/2020
Underslab Plumbing Inspection - Residential Passed 2/6/2020 2/6/2020 02/06/2020
Sewer Service Inspection - R Passed 4/1/2020 (8:00) 4/1/2020 04/01/2020
Water Service Inspection - R Partial 4/7/2020 04/07/2020
Water Service Inspection - R Passed 4/8/2020 4/8/2020 04/08/2020
All Rough Inspection - Residential Failed 5/4/2020 5/4/2020 05/04/2020
Misc
Corrective Action Required
05/04/2020
- RE ESTABLISH EROSION CONTROL AT FRONT AND BACK OF LOT - ADDRESS MUD, GRAVEL, AND DEBRIS AT STREET - - PROVIDE APPROVED ACCESS TO HOUSE FOR INSPECTIONS - CORRECT ISSUES BEFORE INSPECTION
Erosion Control Inspection Residential Failed 5/4/2020 05/04/2020
Misc
Corrective Action Required
05/04/2020
- RE ESTABLISH EROSION CONTROL AT FRONT AND BACK OF LOT
Driveway Inspection Partial 5/5/2020 (Ready Now) 5/5/2020 05/05/2020
Misc
Informational
05/05/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Electrical Service Inspection Failed 5/4/2020 5/8/2020 05/08/2020
Misc
Corrective Action Required
05/08/2020
- Remove green bonding screw from sub panel-
Gas Service Inspection - Residential Failed 5/4/2020 5/8/2020 05/08/2020
Misc
Corrective Action Required
05/08/2020
- Protect and install gas flex line at deck fireplace
All Rough Inspection - Residential Failed 5/8/2020 5/8/2020 05/08/2020
Misc
Corrective Action Required
05/04/2020
• Anchor all steel columns to floor in basement • Seal low volt penetration through fire blocking at S basement by door • Tighten all bottom plate anchor nuts in basement • Gas line through joists at deck move down, 3” for penetration • Ledger locks at deck install per manufacturer listing • Column missing in basement by backdoor pier • Duct through double header at window by sliding door in basement • No electrical found below suspended slab in basement • Fireblock at beam S wall basement by door • Support joist at cutout below suspended slab stoop • Firestop DWV at top plate basement N • Protect pex at shower basement N • Seal pex penetration at top plate bathroom N basement • Firestop at basement bedroom N at dryer vent and DWV • Support DWV in basement every 4’ • Fireblock at 2x6 above fireplace • Complete all fire stopping throughout • Install truss bracing per plans • B vent flue within 1” combustible at truss bracing in attic • Portal framing hold down in garage • LVL corner to corner master bed, dining room, kitchen per plans • Protect and install gas flex line at deck fireplace • Remove green bonding screw from sub panel
Driveway Inspection Passed 5/8/2020 05/12/2020
Misc
Informational
05/05/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Gas Service Inspection - Residential Not Ready 5/15/2020 5/15/2020 05/15/2020
Misc
Corrective Action Required
05/08/2020
- Protect and install gas flex line at deck fireplace
Electrical Service Inspection Passed 5/15/2020 5/15/2020 05/15/2020
Misc
Resolved
05/15/2020
- Remove green bonding screw from sub panel-
All Rough Inspection - Residential Not Ready 5/15/2020 5/15/2020 05/15/2020
Misc
Corrective Action Required
05/08/2020
-SIGNIFICANT WORK STILL BEING DONE AT INSPECTION- • Anchor all steel columns to floor in basement • Seal low volt penetration through fire blocking at S basement by door • Tighten all bottom plate anchor nuts in basement • Gas line through joists at deck move down, 3” for penetration • Ledger locks at deck install per manufacturer listing • Column missing in basement by backdoor pier • Duct through double header at window by sliding door in basement • No electrical found below suspended slab in basement • Fireblock at beam S wall basement by door • Support joist at cutout below suspended slab stoop • Firestop DWV at top plate basement N • Protect pex at shower basement N • Seal pex penetration at top plate bathroom N basement • Firestop at basement bedroom N at dryer vent and DWV • Support DWV in basement every 4’ • Fireblock at 2x6 above fireplace • Complete all fire stopping throughout • Install truss bracing per plans • B vent flue within 1” combustible at truss bracing in attic • Portal framing hold down in garage • LVL corner to corner master bed, dining room, kitchen per plans • Protect and install gas flex line at deck fireplace • Remove green bonding screw from sub panel
All Rough Inspection - Residential Failed 5/19/2020 5/19/2020 05/19/2020
Misc
Corrective Action Required
05/15/2020
**DO NOT SHEET ROCK** • Tighten all bottom plate anchor nuts in basement • Ledger locks at deck install per manufacturer listing • Column missing in basement by backdoor pier BEDROOM 5 WALL • Duct through double header at window by sliding door in basement • No electrical found below suspended slab in basement • Fireblock at beam S wall basement by door • Support joist at cutout below suspended slab stoop • Protect pex at shower basement N • Seal pex penetration at top plate bathroom N basement bottom plate bath 2 • Fireblock at 2x6 above fireplace - SEAL ALL GAPS • Complete all fire stopping throughout - Seal penetrations in top plate great room • Install truss bracing per plans • B vent flue within 1” combustible at truss bracing in attic -PROVIDE VERTICAL FIRE STOP EVERY 10’ ON FURRED OUT EXTERIOR BASE
Gas Service Inspection - Residential Passed 5/19/2020 5/19/2020 05/19/2020
Misc
Corrective Action Required
05/15/2020
- Protect and install gas flex line at deck fireplace
All Rough Inspection - Residential Not Ready 5/21/2020 5/21/2020 05/21/2020
Misc
Corrective Action Required
05/19/2020
**DO NOT SHEET ROCK** • Tighten all bottom plate anchor nuts in basement • Ledger locks at deck install per manufacturer listing • No electrical found below suspended slab in basement • Fireblock at beam S wall basement by door • Support joist at cutout below suspended slab stoop • Protect pex at shower basement N • Seal pex penetration at bottom plate bath 2 • Complete all fire stopping throughout - Seal penetrations in top plate great room/entry way • Install truss bracing per plans • B vent flue within 1” combustible at truss bracing in attic -PROVIDE VERTICAL FIRE STOP EVERY 10’ ON FURRED OUT EXTERIOR BASEMENT-NORTH & EAST WALLS GREATER THAN 10’
All Rough Inspection - Residential Passed 5/26/2020 5/26/2020 05/26/2020
Misc
Resolved
05/26/2020
Occupancy Inspection - Codes Residential Failed 7/16/2020 7/16/2020 07/16/2020
Miscellaneous Correction
Corrective Action Required
05/26/2020
- Complete final grade and sod - Terminate and complete exterior lighting at front porch - Guardrails required at front porch, more than 30” from grade - Seal around all exterior light fixtures - Complete siding at exterior fireplace - Remove all paint covers from smokes - Terminate and complete ceiling light at front bedroom - Cover plates required at all switches and receptacles - Breaker lockouts at all hardwired appliances - Security screws, provide (2) 3” screws each exterior hinge and strike plate at back deck door and basement walkout - Complete spindles at stairs to basement - Anchor columns to floor in basement at suspended slab room
Occupancy Inspection - Codes Residential Temporary C of O 7/20/2020 7/20/2020 07/20/2020
Miscellaneous Correction
Corrective Action Required
07/16/2020
- Complete final grade and sod - Terminate and complete exterior lighting at front porch (Cover plates installed) OK for TCO
Sidewalk Inspection Partial 8/24/2020 (P.M.) 8/24/2020 08/24/2020
Misc
Informational
08/24/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Sidewalk Inspection Passed 8/31/2020 8/31/2020 09/04/2020
Misc
Informational
08/24/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Suspended Slab Inspection Passed 10/05/2020
Plot Plan Inspection Passed 10/5/2020 10/5/2020 10/05/2020
Occupancy Inspection - Codes Residential Failed 10/5/2020 10/5/2020 10/05/2020
Miscellaneous Correction
Corrective Action Required
07/20/2020
- No pier inspection performed for covered deck- submit report
Piers/Caissons Inspection - Residential Passed 10/09/2020
Occupancy Inspection - Codes Residential Full C of O 10/9/2020 10/9/2020 10/09/2020
Miscellaneous Correction
Resolved
10/09/2020
Documents & Images
Date Uploaded File Type Document Name
12/02/2019 Letter Codes Residential Plan Review
12/05/2019 Receipt Receipt for transaction: 2019-007596
12/05/2019 Letter DS Building Permit
12/05/2019 Plot Plan DOC120519-016
12/31/2019 Letter INSPECTION SUMMARY
01/07/2020 Letter INSPECTION SUMMARY
02/06/2020 Letter INSPECTION SUMMARY
03/11/2020 Engineer Report/Study 4413 SW Nautilius Pl_Lot 21 Creekside at Raintree Final_2020.03.04_SuspGSlab_LSMO_Pat Cochran Concrete
04/01/2020 Letter INSPECTION SUMMARY
04/01/2020 Letter INSPECTION SUMMARY
04/07/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
05/04/2020 Letter INSPECTION SUMMARY
05/04/2020 Letter INSPECTION SUMMARY
05/05/2020 Letter INSPECTION SUMMARY
05/05/2020 Letter INSPECTION SUMMARY
05/08/2020 Letter INSPECTION SUMMARY
05/08/2020 Letter INSPECTION SUMMARY
05/08/2020 Letter INSPECTION SUMMARY
05/12/2020 Engineer Report/Study Suspended Stoop Inspection - 4413 SW Nautilus Pl - Lot 21 Creekside at Raintree - PRRES20193476
05/12/2020 Letter INSPECTION SUMMARY
05/14/2020 Letter Suspended Stoop Inspection - 4413 SW Nautilus Pl - Lot 21 Creekside at Raintree - PRRES20193476
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/15/2020 Letter INSPECTION SUMMARY
05/19/2020 Letter INSPECTION SUMMARY
05/19/2020 Letter INSPECTION SUMMARY
05/21/2020 Letter INSPECTION SUMMARY
05/26/2020 Letter INSPECTION SUMMARY
05/29/2020 Receipt Receipt for transaction:2020-002480
07/16/2020 Letter INSPECTION SUMMARY
07/20/2020 Letter Codes Temporary Certificate of Occupancy
08/24/2020 Letter INSPECTION SUMMARY
09/04/2020 Letter INSPECTION SUMMARY
10/05/2020 Letter INSPECTION SUMMARY
10/05/2020 Letter INSPECTION SUMMARY
10/05/2020 Letter INSPECTION SUMMARY
10/08/2020 Lot 21 Creekside at Raintree - Final Pier Plan- signed
10/08/2020 21 Creekside at Raintree - Drilled Pier Inspection
10/09/2020 Letter INSPECTION SUMMARY
10/09/2020 Letter Field Certificate of Occupancy
10/09/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home