Summary
PRRES20193315
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW SINGLE FAMILY PARTIALLY FINISHED BASEMENT COVERED DECK ROOF AND FLOOR PACKAGES DEFERRED FLOOD PLAIN FOUNDATION ELEVATION CERTIFICATE REQUIRED AFTER FOUNDATION IS POURED
11/08/2019
11/26/2019
05/11/2020
10/22/2020
Locations
Contacts
LANDROCK SIGNATURE HOMES LLC, Address:4335 MCGEE ST, Phone:(816) 863-5588  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD, Phone:(816) 943-8513  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 11/22/2019 11/20/2019
Steve Conrick
Side yard dimensions
Corrective Action Required
11/20/2019

The side yard dimensions must be provided on the plot plan. The dimensions are provides and meet the setback, but the s/y/s reads 6.96' rather than 7.5
100-year floodplain
Corrective Action Required
11/20/2019

100-year floodplain, where applicable, must be shown on the plot plan. (Foundation elevation certificate required prior to occupancy)
As-graded plot plan
Corrective Action Required
11/20/2019

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy. All rear corners must be verified
Residential Plan Review Approved 11/22/2019 11/20/2019
Steve Conrick
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
11/20/2019

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304)
10 Combustion air
Corrective Action Required
11/20/2019

Provide combustion air calculations and specify transfer air grilles for fuel burning appliances located in confined space(s). (IRC Chapter 17 and Section G2407) Where is this shown?
37 Provide details for any walls over 10 feet in height.
Corrective Action Required
11/20/2019

Provide details for any walls over 10 feet in height. Include stud grade, size, spacing and actual, uninterrupted height. (IRC Section 602.3.1 and Table 602.3(5) & 602.3.1) Where is this shown?
Plot Plan Review Rejected 11/13/2019 11/13/2019
Steve Conrick
Side yard dimensions
Corrective Action Required
11/12/2019

The side yard dimensions must be provided on the plot plan. The dimensions are provides and meet the setback, but the s/y/s reads 6.96' rather than 7.5
100-year floodplain
Corrective Action Required
11/13/2019

100-year floodplain, where applicable, must be shown on the plot plan. (Foundation elevation certificate required prior to occupancy)
As-graded plot plan
Corrective Action Required
11/13/2019

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy. All rear corners must be verified
Residential Plan Review Rejected 11/12/2019 11/12/2019
Steve Conrick
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
11/12/2019

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304)
10 Combustion air
Corrective Action Required
11/12/2019

Provide combustion air calculations and specify transfer air grilles for fuel burning appliances located in confined space(s). (IRC Chapter 17 and Section G2407) Where is this shown?
37 Provide details for any walls over 10 feet in height.
Corrective Action Required
11/12/2019

Provide details for any walls over 10 feet in height. Include stud grade, size, spacing and actual, uninterrupted height. (IRC Section 602.3.1 and Table 602.3(5) & 602.3.1) Where is this shown?
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,224.34 $1,224.34 Paid 11/26/2019
Right of Way Permit Fee $80.00 $80.00 Paid 11/26/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 11/26/2019
8331507-Sewer Connection Fee $480.00 $480.00 Paid 11/26/2019
Water Tap Fee $3,477.00 $3,477.00 Paid 11/26/2019
Water Meter Fee $425.02 $425.02 Paid 11/26/2019
Not Ready Inspection Fee $50.00 $50.00 Paid 10/16/2020
Not Ready Inspection Fee $50.00 $50.00 Paid 10/16/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 12/19/2019 12/19/2019 12/19/2019
Misc
Informational
12/19/2019
Ok to pour, engineering letter is uploaded into documents and images
Underslab Plumbing Inspection - Residential Passed 1/17/2020 1/17/2020 01/17/2020
Sewer Service Inspection - R Passed 1/31/2020 1/31/2020 01/31/2020
Water Service Inspection - R Partial 1/31/2020 1/31/2020 01/31/2020
Water Service Inspection - R Passed 2/3/2020 2/3/2020 02/03/2020
All Rough Inspection - Residential Not Ready 5/22/2020 5/22/2020 05/22/2020
Misc
Corrective Action Required
05/22/2020
- NO CITY STAMPED PLANS ON SITE - - NO CITY STAMPED TRUSS PLANS ON SITE - - HOUSE NOT READY FOR ROUGH IN -
All Rough Inspection - Residential Not Ready 5/27/2020 5/27/2020 05/27/2020
Misc
Corrective Action Required
05/22/2020
- NO CITY STAMPED PLANS ON SITE - - NO CITY STAMPED TRUSS PLANS ON SITE - - HOUSE NOT READY FOR ROUGH IN, PLUMBING TRADE ON SITE INSTALLING PLUMBING AT TIME OF INSPECTION, ALL TRADES SHOULD BE COMPLETE AT TIME OF ALL ROUGH INSPECTION -
All Rough Inspection - Residential Failed 5/28/2020 5/28/2020 05/28/2020
Misc
Corrective Action Required
05/27/2020
- Seal all upward and downward penetrations - Fur out at HVAC in garage - Truss hangers per plans - Properly nail all truss hangers - Fireblock deadspace between master bedroom and master bath - Fireblock and seal deadspace at laundry - Install gas fireplace, 1st floor and basement - fireplaces are currently backordered from manufacturer, will need to install both and connect to gas line to release gas service. Gas pressure will need to be rechecked after installation - Tighten all sill plate anchor bolts in basement - Fireblock vertical every 10’ in basement - Fireblock between top plate and foundation wall basement - Fireblock vertical to horizontal in basement - Cap or complete open DWV in basement
Misc
Informational
05/28/2020
Protect I-Joists in unfinished mechanical portion of basement per code, R302.13 fire protection of floors. Protection needs to be in place at occupancy
Gas Service Inspection - Residential Failed 05/28/2020
Misc
Corrective Action Required
05/28/2020
- Install gas fireplace, 1st floor and basement - fireplaces are currently backordered from manufacturer, will need to install both and connect to gas line to release gas service. Gas pressure will need to be rechecked after installation
Electrical Service Inspection Passed 05/28/2020
All Rough Inspection - Residential Failed 6/2/2020 6/2/2020 06/02/2020
Misc
Corrective Action Required
05/28/2020
- INSTALL GAS FIREPLACES, 1ST FLOOR AND BASEMENT PER CONTRACTOR FIREPLACES ARE ON BACKORDER FROM MANUFACTURER. OK TO INSULATE AND ROCK ALL OTHER AREAS OF HOME EXCEPT FOR THE FIREPLACES. FIREPLACES WILL NEED TO BE INSPECTED AFTER INSTALLATION, KEEP FIREPLACE SYSTEM AVAILABLE FOR COMPLETE INSPECTION OF SYSTEM AND ALL FLUES. GAS SERVICE CANNOT BE RELEASED UNTIL AFTER FIREPLACES ARE INSTALLED AND SYSTEM PRESSURE CHECKED.
Misc
Informational
05/28/2020
Protect I-Joists in unfinished mechanical portion of basement per code, R302.13 fire protection of floors. Protection needs to be in place at occupancy
Driveway Inspection Partial 6/29/2020 (P.M.) 6/29/2020 06/29/2020
Misc
Informational
06/29/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Gas Piping Inspection - Residential Passed 6/30/2020 6/30/2020 06/30/2020
All Rough Inspection - Residential Failed 6/30/2020 6/30/2020 06/30/2020
Misc
Corrective Action Required
06/02/2020
- INSTALL GAS FIREPLACES, 1ST FLOOR AND BASEMENT PER CONTRACTOR FIREPLACES ARE ON BACKORDER FROM MANUFACTURER. OK TO INSULATE AND ROCK ALL OTHER AREAS OF HOME EXCEPT FOR THE FIREPLACES. FIREPLACES WILL NEED TO BE INSPECTED AFTER INSTALLATION, KEEP FIREPLACE SYSTEM AVAILABLE FOR COMPLETE INSPECTION OF SYSTEM AND ALL FLUES. GAS SERVICE CANNOT BE RELEASED UNTIL AFTER FIREPLACES ARE INSTALLED AND SYSTEM PRESSURE CHECKED.
Misc
Resolved
06/30/2020
Protect I-Joists in unfinished mechanical portion of basement per code, R302.13 fire protection of floors. Protection needs to be in place at occupancy
Misc
Corrective Action Required
06/30/2020
- 1ST FLOOR FIREPLACE CANNOT INSPECT ENTIRE FLUE VENT ASSEMBLY EXITING THROUGH ROOF. REMOVE ENOUGH ROCK FROM CEILING THAT WILL ALLOW FOR VIEWING OF VENT SYSTEM THROUGH ROOF - BASEMENT FIREPLACE, COMPLETE FRAMING OF BULK HEAD THAT WILL ENCLOSE FLUE VENT THROUGH EXTERIOR WALL TO ALLOW INSPECTION. - ADDRESS ROMEX ABOVE FLUE VENT THROUGH EXTERIOR WALL IN BASEMENT - GAS SYSTEM WILL NEED TO BE PRESSURIZED FOR INSPECTION BEFORE GAS SERVICE CAN BE RELEASED
Driveway Inspection Passed 7/2/2020 7/2/2020 07/06/2020
Misc
Informational
06/29/2020
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Gas Service Inspection - Residential Failed 8/31/2020 8/31/2020 08/31/2020
Misc
Corrective Action Required
05/28/2020
- Install gas fireplace, 1st floor and basement - fireplaces are currently backordered from manufacturer, will need to install both and connect to gas line to release gas service. Gas pressure will need to be rechecked after installation 8/31 - fireplaces installed, rock cover at 1st floor ceiling/fireplace vicinity preventing inspection of vent through roof, rock covering furred out at basement vent through exterior wall preventing inspection of furred out framing and romex behind vent through exterior wall. Remove rock to allow inspections. Provide gauge at gas line for pressure test.
All Rough Inspection - Residential Failed 8/31/2020 8/31/2020 08/31/2020
Misc
Corrective Action Required
06/30/2020
- INSTALL GAS FIREPLACES, 1ST FLOOR AND BASEMENT PER CONTRACTOR FIREPLACES ARE ON BACKORDER FROM MANUFACTURER. OK TO INSULATE AND ROCK ALL OTHER AREAS OF HOME EXCEPT FOR THE FIREPLACES. FIREPLACES WILL NEED TO BE INSPECTED AFTER INSTALLATION, KEEP FIREPLACE SYSTEM AVAILABLE FOR COMPLETE INSPECTION OF SYSTEM AND ALL FLUES. GAS SERVICE CANNOT BE RELEASED UNTIL AFTER FIREPLACES ARE INSTALLED AND SYSTEM PRESSURE CHECKED.
Misc
Corrective Action Required
06/30/2020
- 1ST FLOOR FIREPLACE CANNOT INSPECT ENTIRE FLUE VENT ASSEMBLY EXITING THROUGH ROOF. REMOVE ENOUGH ROCK FROM CEILING THAT WILL ALLOW FOR VIEWING OF VENT SYSTEM THROUGH ROOF - BASEMENT FIREPLACE, COMPLETE FRAMING OF FURRED OUT THAT WILL ENCLOSE FLUE VENT THROUGH EXTERIOR WALL TO ALLOW INSPECTION. - ADDRESS ROMEX ABOVE FLUE VENT THROUGH EXTERIOR WALL IN BASEMENT - GAS SYSTEM WILL NEED TO BE PRESSURIZED FOR INSPECTION BEFORE GAS SERVICE CAN BE RELEASED 8/31 - CANNOT INSPECT ENTIRE FLUE VENT ASSEMBLY EXITING THROUGH ROOF DUE TO ROCK COVER IN THIS AREA. FURRED OUT AT BASEMENT HAS BEEN FRAMED AND COVERED WITH ROCK PREVENTING INSPECTION OF FURRED OUT FRAMING AND THAT ROMEX AT FLUE VENT THROUGH EXTERIOR HAS BEEN ADDRESSED. REMOVE ROCK TO ALLOW INSPECTION OF THESE ISSUES.
Gas Service Inspection - Residential Failed 9/2/2020 9/2/2020 09/02/2020
Misc
Corrective Action Required
08/31/2020
- INSTALL INSULATION SHIELD ON B VENT 1ST FLOOR FIREPLACE IN ATTIC - PRESSURIZE GAS LINE FOR TEST, GAUGE AT 0 PSI, MUST MAINTAIN 10 PSI FOR 15 MINUTES
Gas Service Inspection - Residential Passed 9/22/2020 9/22/2020 09/22/2020
Misc
Resolved
09/22/2020
All Rough Inspection - Residential Passed 9/22/2020 9/22/2020 09/22/2020
Misc
Resolved
09/22/2020
Misc
Resolved
09/22/2020
Erosion Control Inspection Residential Passed 10/16/2020
Deck Final Inspection - Residential Passed 10/16/2020 10/16/2020 10/16/2020
Occupancy Inspection - Codes Residential Temporary C of O 10/16/2020 10/16/2020 10/16/2020
Miscellaneous Correction
Resolved
10/16/2020
Miscellaneous Correction
Resolved
10/16/2020
-PAY ALL FEES BEFORE FINAL OCCUPANCY -OBTAIN LAWN SPRINKLER PERMIT AND BACKFLOW CERTIFICATE -PROVIDE AS GRADED PLOT PLAN
Miscellaneous Correction
Corrective Action Required
10/16/2020
-PAY ALL FEES BEFORE FINAL OCCUPANCY -OBTAIN LAWN SPRINKLER PERMIT AND BACKFLOW CERTIFICATE -PROVIDE AS GRADED PLOT PLAN
Miscellaneous Correction
Corrective Action Required
10/16/2020
TCO GOOD UNTIL 11-2-20 -PAY ALL FEES BEFORE FINAL OCCUPANCY -OBTAIN LAWN SPRINKLER PERMIT AND BACKFLOW CERTIFICATE -PROVIDE AS GRADED PLOT PLAN -SEAL AROUND METER CAN -PROVIDE ILLUMINATED PERMANENT ADDRESS
Occupancy Inspection - Codes Residential Failed 10/21/2020 10/21/2020 10/21/2020
Miscellaneous Correction
Resolved
10/21/2020
Miscellaneous Correction
Corrective Action Required
10/16/2020
TCO GOOD UNTIL 11-2-20 -OBTAIN LAWN SPRINKLER PERMIT AND BACKFLOW CERTIFICATE -PROVIDE AS GRADED PLOT PLAN -PROVIDE ILLUMINATED PERMANENT ADDRESS - MUST BE ATTACHED TO HOUSE
Plot Plan Inspection Passed 10/22/2020 10/22/2020
Occupancy Inspection - Codes Residential Full C of O 10/22/2020 10/22/2020 10/22/2020
Miscellaneous Correction
Resolved
10/22/2020
Documents & Images
Date Uploaded File Type Document Name
11/13/2019 Letter Codes Residential Plan Review
11/26/2019 Receipt Receipt for transaction: 2019-007489
11/26/2019 Plot Plan DOC112619
11/26/2019 Letter DS Building Permit
12/19/2019 Letter INSPECTION SUMMARY
12/19/2019 Engineer report for footing E5454EBE-E942-4F5F-9588-F9FB5E5A12EA
12/19/2019 Engineer report for footing A6872243-3DD0-4936-A970-3DD16BFFBDA7
12/19/2019 Engineer report for footing DB1AD7DE-A83C-4136-9D02-7CF83A6FF6F6
01/17/2020 Letter INSPECTION SUMMARY
01/31/2020 Letter INSPECTION SUMMARY
01/31/2020 Letter INSPECTION SUMMARY
02/03/2020 Letter INSPECTION SUMMARY
05/22/2020 Letter INSPECTION SUMMARY
05/27/2020 Letter INSPECTION SUMMARY
05/28/2020 Letter INSPECTION SUMMARY
05/28/2020 Letter INSPECTION SUMMARY
05/28/2020 Letter INSPECTION SUMMARY
06/02/2020 Letter INSPECTION SUMMARY
06/29/2020 Letter INSPECTION SUMMARY
06/30/2020 Letter INSPECTION SUMMARY
06/30/2020 Letter INSPECTION SUMMARY
07/06/2020 Letter INSPECTION SUMMARY
08/31/2020 Letter INSPECTION SUMMARY
08/31/2020 Letter INSPECTION SUMMARY
09/02/2020 Letter INSPECTION SUMMARY
09/22/2020 Letter INSPECTION SUMMARY
09/22/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter INSPECTION SUMMARY
10/16/2020 Letter Codes Temporary Certificate of Occupancy
10/16/2020 Receipt Receipt for transaction: 2020-007001
10/21/2020 Plot Plan APPROVED AS-BUILT
10/21/2020 Letter INSPECTION SUMMARY
10/22/2020 Letter INSPECTION SUMMARY
10/22/2020 Letter Field Certificate of Occupancy
10/22/2020 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home