Summary
PRRES20192035
Building Permit - Residential
Certificate of Occupancy
SILVERSTONE DEVELOPMENT LLC
NEW SINGLE FAMILY
NEW HOUSE - UNFINISHED BASEMENT - COVERED PATIO STOP WORK ORDER removed on 01/14/2020 12:00 AM by username 'Khanh Nguyen'.
07/29/2019
08/01/2019
08/12/2021
Locations
Contacts
SILVERSTONE DEVELOPMENT LLC, Address:PO BOX 346  
MCBEE CUSTOM HOMES, Address:520 N MO 7 HWY, Phone:(816) 650-5038 Ext:223  
BLUE VALLEY HEATING & COOLING LLC, Address:P O BOX 241, Phone:(816) 867-5122  
SHAKER ELECTRIC , Address:P O BOX 300795, Phone:(816) 309-3702  
ACCU-PLUMBING INC, Address:PO BOX 683, Phone:(816) 229-4776  
KPERRIN@MCBEECUSTOMHOMES.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Residential Plan Review Approved 07/31/2019 08/01/2019
Kim Brennan
05 Provide square footage of living area, garage area, unfinished basement
Corrective Action Required
07/29/2019

Provide square footage of living area, garage area, unfinished basement area, etc (IRC Section R304) The square footage for the unfinished basement do not match what is on the application and there is no square footage shown for the garage. Please clarify
Misc
Corrective Action Required
07/29/2019

The plans make reference to the 2012 code book and it should refererence the 2018 code book.
Plot Plan Review Approved 07/31/2019 07/31/2019
Steve Conrick
Right-of-way
Corrective Action Required
07/29/2019

The right-of-way with dimensions must be provided on the plot plan.
Deck location
Corrective Action Required
07/30/2019

Deck location, with dimensions to property lines must be provided on the plot plan.
Monticello Landscaping
Corrective Action Required
07/30/2019

Per Ordinance 7690, Section 3.10 The builders are required to put in a minimum of three Evergreen trees, two ornamental trees and three shrubs, on each lot adjacent to the Lake Ridge Meadows and Dalton's Ridge subdivisions, acknowledging that the goal is to provide a visual buffer for the property to the north. No final certificate of occupancy shall be issued for an individually affected lot until such time as the required number of trees and shrubs are planted on said lot. The required landscaping shall be planted within 20 feet of the rear proerty line. The required landscaping shall meet the minimum size requirements of the UDO at the time of planting (i.e. 8' for Evergreen trees, 3" caliper for ornamental trees and 2-gallon container for shrubs).
Basement egress
Corrective Action Required
07/31/2019

Basement egress location(s) and elevation of the lowest adjacent grade must be provided on the plot plan.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,496.49 $1,496.49 Paid 08/01/2019
Right of Way Permit Fee $80.00 $80.00 Paid 08/01/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 08/01/2019
8331507-Sewer Connection Fee $30.00 $30.00 Paid 08/01/2019
Water Tap Fee $3,477.00 $3,477.00 Paid 08/01/2019
Water Meter Fee $425.02 $425.02 Paid 08/01/2019
8331507-Sewer Connection Fee $570.00 $570.00 Paid 08/05/2019
$600.00
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Passed 8/5/2019 (1:45) 8/5/2019 08/05/2019
Misc
Corrective Action Required
08/05/2019
Erosion control will need to be in place for further inspections.
Erosion Control Inspection Residential Failed 9/10/2019 09/10/2019
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
09/10/2019
DEFICIENT EROSION CONTROL INSTALLATION. RESTORE EROSION CONTROL ALONG STREET AND CLEAN STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Underslab Plumbing Inspection - Residential Passed 9/10/2019 9/10/2019 at 8:55 AM 09/10/2019
Sewer Service Inspection - R Passed 9/17/2019 (10:45) 9/17/2019 at 11:00 AM 09/17/2019
Water Service Inspection - R Partial 9/18/2019 9/18/2019 09/17/2019
Erosion Control Inspection Residential Failed 9/18/2019 09/18/2019
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
09/10/2019
-DEFICIENT EROSION CONTROL INSTALLATION. RESTORE EROSION CONTROL ALONG STREET AND CLEAN STREET NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Water Service Inspection - R Passed 9/18/2019 at 10:00 AM 09/18/2019
Erosion Control Inspection Residential Failed - Stop Work 11/1/2019 at 2:50 PM 11/01/2019
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
09/18/2019
-DEFICIENT EROSION CONTROL INSTALLATION. RESTORE EROSION CONTROL ALONG STREET AND CLEAN STREET **THE EROSION CONTROL SIGN WAS POSTED ON 29-OCT BUT WAS TAKEN OFF. STOP-WORK ISSUED ON 1-NOV-19 **NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Erosion Control Inspection Residential Failed 1/14/2020 01/14/2020
DCM2 ESC DEFICIENT INSTALLATION
Corrective Action Required
11/01/2019
-DEFICIENT EROSION CONTROL INSTALLATION. RESTORE EROSION CONTROL ALONG STREET AND CLEAN STREET **NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Gas Service Inspection - Residential Passed 1/14/2020 1/14/2020 at 9:55 AM 01/14/2020
Electrical Service Inspection Passed 1/22/2020 01/22/2020
All Rough Inspection - Residential Failed 1/22/2020 01/22/2020
Misc
Corrective Action Required
01/22/2020
FRAMING: -Strap garage portal brace wall header per code, nail sheathing to sill plates with 8d@3” oc -Install ceiling joist hangers near garage portal wall -Provide attic access to roof space above garage -Install security blocking at garage exterior door per security code -Nail corner studs with 16d@12” oc, or equivalent nailing throughout -Insulate first, then solid block cantilevered joists above bearing wall -Fb wall from soffit above cooktop -Windows located within 24” of the rear exterior doors shall be safety tempered glass windows -Fb fireplace space from ceiling space; Fb two dead spaces and wall space behind refrigerator (in front office) from ceiling space; -Nail siding to studs at front bedroom -Have engineer address roof hip&ridge support above front bedroom -Install beam underneath to carry load above master bedroom door -Install stud support for (3)2x12 roof beam at laundry/bath wall. Solid block underneath point load -Install joist hangers at joist-lvl connections at basement stair wall -Add solid blocking (lvl or 2x lumber) under I beam point load below cooktop -Provide TJI floor plan PLUMBING: -Label radon piping MECHANICAL: -Fasten fireplace to framing -Move return air opening out of front office dead space ELECTRICAL: -Move fireplace switch out to wall surface; -Secure wiring within 12” of fireplace TV outlet box -Install a wall receptacle at master bedroom wall more than 24” in width **OK TO INSULATE
All Rough Inspection - Residential Failed 2/10/2020 at 10:00 AM 02/10/2020
Misc
Corrective Action Required
01/22/2020
FRAMING: -Install security blocking at garage exterior door per security code **Block 3 stud spaces out at strike plate height, not one stud space -Insulate first, then solid block cantilevered joists above bearing wall -Windows located within 24” of the rear exterior doors shall be safety tempered glass windows **Check later -Fb fireplace space from ceiling space; Fb two dead spaces and wall space behind refrigerator (in front office) from ceiling space -Have engineer address roof hip&ridge support above front bedroom **The back span above the closet is ~ 3 ft. The portion that support the hips is actually ~ 4 ft. Have the engineer take a look at this again -Add solid blocking (lvl or 2x lumber) under I beam point load below cooktop MECHANICAL: -Fasten fireplace to framing
All Rough Inspection - Residential Passed 2/14/2020 2/14/2020 02/14/2020
Misc
Informational
02/14/2020
-Windows located within 24” of the rear exterior doors shall be safety tempered glass windows **Check later COF
All Rough Inspection - Residential Failed 2/27/2020 2/27/2020 at 10:15 AM 02/27/2020
Misc
Corrective Action Required
02/27/2020
-THE RIDGE IS NOT STRAPPED DOWN TO THE LVL BEAM BELOW AS PER ENGINEER LETTER DATED FEB-26
All Rough Inspection - Residential Passed 2/28/2020 2/28/2020 at 9:20 AM 02/28/2020
Misc
Resolved
02/28/2020
-THE RIDGE IS NOT STRAPPED DOWN TO THE LVL BEAM BELOW AS PER ENGINEER LETTER DATED FEB-26
Piers/Caissons Inspection - Residential Passed 4/8/2020 4/8/2020 at 1:20 PM 04/08/2020
Driveway Inspection Passed 4/9/2020 (P.M.) 4/9/2020 04/10/2020
Misc
Informational
04/10/2020
On Friday, 4-10-2020, provided driveway inspection and found driveway meet all city specification and passes inspection.
Occupancy Inspection - Codes Residential Failed 5/20/2020 5/20/2020 at 2:00 PM 05/20/2020
Misc
Corrective Action Required
05/20/2020
-Provide rear landscaping per city ordinance 7690, section 3.10 -Clean street -Final grade, sod, downspout and sump pump extensions -Provide address near source of light per security code -Make sure that the sewer tracer wire and port are installed and available at grade level -Secure AC whips within 12” of disconnects -Seal exterior wall penetrations, seal above AC disconnect, meter, etc -Install tamper-proof caps at AC valves -Screw in the garage exterior door embedded brace into studs with 3” screws -Fire block garage wall penetration under sink -Remove all covers from smoke alarms -Secure cooktop whip within 12” of j-box and cooktop -Protect exposed TJI joists in basement per code -Install a gate valve and check valve for the grinder pump discharge pipe per code -Remove paper facing from insulation
Occupancy Inspection - Codes Residential Temporary C of O 5/28/2020 5/28/2020 at 11:15 AM 05/28/2020
Misc
Corrective Action Required
05/20/2020
**EXTERIOR WILL BE CHECKED LATER** -Provide rear landscaping per city ordinance 7690, section 3.10 -Final grade, sod, downspout and sump pump extensions -Make sure that the sewer tracer wire and port are installed and available at grade level -Secure AC whips within 12” of disconnects -Seal exterior wall penetrations, seal above AC disconnect, meter, etc -Install tamper-proof caps at AC valves -Screw in the garage exterior door embedded brace into studs with 3” screws **The door frame has 4 pre-dill holes, two behind the dead bolt strike plate and the other two are located 12" above and below the dead bolt strike plate. Install 3" screws through these holes -Protect exposed TJI joists in basement per code **Currently installing 1/2" gb board -Remove paper facing from insulation
Erosion Control Inspection Residential Passed 07/23/2020
DCM2 ESC DEFICIENT INSTALLATION
Resolved
05/20/2020
-DEFICIENT EROSION CONTROL INSTALLATION. RESTORE EROSION CONTROL ALONG STREET AND CLEAN STREET **NO FURTHER INSPECTIONS UNTIL ADEQUATE EROSION CONTROL PROVIDED.
Occupancy Inspection - Codes Residential Temporary C of O 11/20/2020 11/20/2020 11/20/2020
Misc
Corrective Action Required
05/28/2020
-Provide rear landscaping per city ordinance 7690, section 3.10 TO BE REVIEWED BY OTHERS
Occupancy Inspection - Codes Residential Full C of O 08/12/2021
Misc
Resolved
08/12/2021
-Provide rear landscaping per city ordinance 7690, section 3.10 TO BE REVIEWED BY OTHERS
Documents & Images
Date Uploaded File Type Document Name
07/29/2019 Letter Codes Residential Plan Review
07/31/2019 Letter Codes Residential Plan Review
08/01/2019 Receipt Receipt for transaction: 2019-005257
08/01/2019 Letter DS Building Permit
08/02/2019 Plot Plan DOC080219-08022019103831
08/05/2019 Letter INSPECTION SUMMARY
08/05/2019 Letter INSPECTION SUMMARY
08/05/2019 Receipt Receipt for transaction: 2019-005325
09/10/2019 Letter INSPECTION SUMMARY
09/10/2019 Letter INSPECTION SUMMARY
09/17/2019 Letter INSPECTION SUMMARY
09/17/2019 Letter INSPECTION SUMMARY
09/18/2019 Letter INSPECTION SUMMARY
11/01/2019 Letter Stop Work Order
01/14/2020 Letter INSPECTION SUMMARY
01/14/2020 Letter INSPECTION SUMMARY
01/22/2020 Letter INSPECTION SUMMARY
01/22/2020 Letter INSPECTION SUMMARY
02/04/2020 Letter 1105 NE Goshen Dr Letter from Engineer
02/10/2020 Letter INSPECTION SUMMARY
02/11/2020 Letter McBee 1105 NE Goshen Ct LSMO Roof Framing Report 2-11-20
02/14/2020 Letter INSPECTION SUMMARY
02/27/2020 Letter McBee 1105 NE Goshen Ct LSMO 3rd Party Roof Framing Inspection Report Calculations 2-26-20
02/27/2020 Letter INSPECTION SUMMARY
02/28/2020 Letter INSPECTION SUMMARY
04/08/2020 Letter INSPECTION SUMMARY
05/20/2020 Letter INSPECTION SUMMARY
05/28/2020 Letter Codes Temporary Certificate of Occupancy
10/29/2020 Letter Codes 10 Day Letter
11/20/2020 Letter Codes Temporary Certificate of Occupancy
11/20/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
08/12/2021 Letter Codes Final Certificate of Occupancy
08/12/2021 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home