Summary
PRRES20191501
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - COVERED PATIO - PARTIAL FINISHED BASEMENT
06/11/2019
06/25/2019
03/30/2020
Locations
Contacts
D AND D BUILDING INC, Address:PO BOX 7014, Phone:(816) 491-2125  
DANDDBUILDING@GMAIL.COM  
APEX HEATING & AIR CONDITIONING INC, Address:1202 NW EAGLE RIDGE BLVD, Phone:(816) 228-2739  
TEAGUE ELECTRIC CONSTRUCTION LLC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
MILLER PLUMBING CO, Address:PO BOX 393 , Phone:(913) 851-1333  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 06/13/2019 06/13/2019
Steve Conrick
As-graded plot plan
Corrective Action Required
06/12/2019

A as-graded plot plan per Section 7-160, Code of Ordinances, is required prior to occupancy. *Please add, "AS-GRADED PLOT PLAN IS REQUIRED PRIOR TO SODDING." in a bubble.
Residential Plan Review Rejected 06/13/2019 06/11/2019
Dylan Eppert
Miscellaneous Correction
Corrective Action Required
06/11/2019

All notes in construction drawings must referance 2018 IRC as of April 1st 2019.
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee New Single Family $1,018.82 $1,018.82 Paid 06/25/2019
$1,023.82
8331507-Sewer Connection Fee $390.00 $390.00 Paid 06/25/2019
Water Tap Fee $3,409.00 $3,409.00 Paid 06/25/2019
Water Meter Fee $408.37 $408.37 Paid 06/25/2019
Right of Way Permit Fee $80.00 $80.00 Paid 06/25/2019
Residential Excise Tax Fee $1,077.12 $1,077.12 Paid 06/25/2019
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Erosion Control Inspection Residential Failed 7/1/2019 07/01/2019
Misc
Corrective Action Required
07/01/2019
EROSION CONTROL NOT INSTALLED PER CITY REQUIREMENT. NO FURTHER INSPECTION UNTIL EROSION CONTROL IS IN COMPLIANCE
Footing Inspection - Residential Passed 7/1/2019 7/1/2019 at 2:25 PM 07/01/2019
Erosion Control Inspection Residential Failed 7/26/2019 07/26/2019
Misc
Corrective Action Required
07/01/2019
-EROSION CONTROL NOT INSTALLED PER CITY REQUIREMENT ALONG THE SIDE OF LOT ON THE SOUTH SIDE. REPAIR EROSION CONTROL AT NE CORNER. -MUD AND DEBRIS SHALL BE CLEANED OFF STREET **NO FURTHER INSPECTION UNTIL EROSION CONTROL IS IN COMPLIANCE
Underslab Plumbing Inspection - Residential Passed 7/26/2019 7/26/2019 at 9:00 AM 07/26/2019
Sewer Service Inspection - R Passed 7/30/2019 (11:30) 7/30/2019 at 12:10 PM 07/30/2019
Water Service Inspection - R Passed 7/31/2019 (11:00) 7/31/2019 at 11:45 AM 07/31/2019
Erosion Control Inspection Residential Failed 9/12/2019 at 2:45 PM 09/12/2019
Misc
Corrective Action Required
07/26/2019
-EROSION CONTROL NOT INSTALLED PER CITY REQUIREMENT ALONG THE SIDE OF LOT ON THE SOUTH SIDE. -SHALL REPAIR EROSION CONTROL ALONG THE STREET -MUD AND DEBRIS SHALL BE CLEANED OFF STREET **STOP-WORK ORDER SHALL BE ISSUED IF STREET IS NOT CLEANED UP AND EROSION CONTROL IS NOT IN COMPLIANCE WITHIN TWO BUSINESS DAYS **NO FURTHER INSPECTION UNTIL EROSION CONTROL IS IN COMPLIANCE
Erosion Control Inspection Residential Failed - Stop Work 9/18/2019 at 9:45 AM 09/18/2019
Misc
Corrective Action Required
09/12/2019
-EROSION CONTROL NOT INSTALLED PER CITY REQUIREMENT ALONG THE SIDE OF LOT ON THE SOUTH SIDE. -SHALL REINSTALL EROSION CONTROL ALONG THE STREET **STOP-WORK ORDER ISSUED- 9/18 **NO FURTHER INSPECTION UNTIL EROSION CONTROL IS IN COMPLIANCE
Erosion Control Inspection Residential Passed 9/25/2019 09/25/2019
Misc
Resolved
09/25/2019
-EROSION CONTROL NOT INSTALLED PER CITY REQUIREMENT ALONG THE SIDE OF LOT ON THE SOUTH SIDE. -SHALL REINSTALL EROSION CONTROL ALONG THE STREET **STOP-WORK ORDER ISSUED- 9/18 **NO FURTHER INSPECTION UNTIL EROSION CONTROL IS IN COMPLIANCE
Informational
09/25/2019
-EROSION CONTROL IS IN COMPLIANCE. MAINTAIN EROSION CONTROL UNTIL SODDING
Gas Service Inspection - Residential Passed 9/30/2019 9/30/2019 at 9:50 AM 09/30/2019
Electrical Service Inspection Passed 10/17/2019 10/17/2019 10/17/2019
All Rough Inspection - Residential Failed 10/17/2019 10/17/2019 at 10:35 AM 10/17/2019
Misc
Corrective Action Required
10/17/2019
**REPAIR EROSION CONTROL AT SOUTH SIDE FRAMING: -Install column support for garage I beam per plan -Strap CSPF walls per plan detail -Install exterior door frames per security code -Roof gable framing is not per A/1 detail -Fb duct chase space from roof -Brace interior walls per plan -Solid block cantilevered joists in basement -Fb basement wall from ceiling furdown space PLUMBING: -Protect refrigerator water line -Slope vent pipe in attic toward drain ELECTRICAL: -Provide rear exterior receptacle readily accessible from and within 6.5 ft of grade level MECHANICAL: -Lower duct to ceiling level basement bedroom **OK TO INSULATE
Piers/Caissons Inspection - Residential Passed 11/4/2019 (1:45) 11/4/2019 at 2:35 PM 11/04/2019
Informational
11/04/2019
CLEAN OUT THE DEBRIS&LOOSE DIRT BEFORE POURING
All Rough Inspection - Residential Failed 11/5/2019 11/5/2019 at 10:20 AM 11/05/2019
Misc
Corrective Action Required
10/17/2019
FRAMING: -Install column support for garage I beam per plan **Weld the I beam at connection to existing I beam and columns per engineer letter -Install exterior door frames per security code **Install security blocking at strike plate side of rear door -Fb duct chase space from roof **Not done. Duct chase at master bath/closet is still open to the roof space -Fb basement wall from ceiling furdown space **Fb the wall space behind the basement bath tub from the ceiling furdown space PLUMBING: -Slope vent pipe in attic toward drain **Slope the 2" vent above the pantry/mud/half bath toward drain
All Rough Inspection - Residential Passed 11/13/2019 11/13/2019 at 10:05 AM 11/13/2019
Misc
Resolved
11/13/2019
FRAMING: -Install column support for garage I beam per plan **Weld the I beam at connection to existing I beam and columns per engineer letter -Install exterior door frames per security code **Install security blocking at strike plate side of rear door -Fb duct chase space from roof **Not done. Duct chase at master bath/closet is still open to the roof space -Fb basement wall from ceiling furdown space **Fb the wall space behind the basement bath tub from the ceiling furdown space PLUMBING: -Slope vent pipe in attic toward drain **Slope the 2" vent above the pantry/mud/half bath toward drain
Driveway Inspection Partial 1/7/2020 (A.M.) 1/7/2020 at 11:00 AM 01/08/2020
Misc
Informational
01/08/2020
The approach has been formed, rock installed and compacted. Ready to pour.
Occupancy Inspection - Codes Residential Failed 1/31/2020 1/31/2020 at 9:55 AM 01/31/2020
Misc
Corrective Action Required
01/31/2020
-Restore erosion control along street -Driveway not approved on record -Final grade, sod, downspout and sump pump extensions -Make sure that the sewer tracer wire and port are installed and available at grade level -Seal exterior wall penetrations, seal above AC disconnect, meter, etc -Secure AC whip -Screw in the embedded jamb brace into studs at rear exterior door -Window located within 24” of the rear exterior door must be tempered glass window. FYI: you can apply window film that meets the ANSI safety requirement -Provide AFCI protection per NEC 210.12. All outlets located in following areas shall be required to have AFCI protection: kitchen, Rec rm, closets, laundry area. Areas not required AFCI are: crawl space, unfinished basement, garage, bathrooms, attic space, outdoor. -Dish washer receptacle outlets must be gfci-protected -Provide fire protection (5/8” gypsum) for steel column in garage -Terminate wire inside box at garage heater
Driveway Inspection Passed 2/7/2020 at 2:45 PM 02/03/2020
Misc
Informational
01/08/2020
The approach has been formed, rock installed and compacted. Ready to pour.
Misc
Informational
02/03/2020
Driveway - passed inspection.
Occupancy Inspection - Codes Residential Temporary C of O 2/10/2020 2/10/2020 at 9:10 AM 02/10/2020
Misc
Corrective Action Required
01/31/2020
-Final grade, sod, downspout extensions -Make sure that the sewer tracer wire and port are installed and available at grade level -Provide AFCI protection per NEC 210.12. All outlets located in following areas shall be required to have AFCI protection: kitchen, Rec rm, closets, laundry area. Areas not requiring AFCI are: crawl space, unfinished basement, garage, bathrooms, attic space, outdoor, fire alarm. **Please read NEC 210.12. There are a bunch of breakers on the left side of the panel that are required to be afci. Also, the dish washer receptacle must also be gfci and afci-protected as well. You can install a dual purpose breaker (breaker providing both afci and gfci) for the dish washer -Dish washer receptacle outlets must be gfci-protected **NEC 210.8(D)
Occupancy Inspection - Codes Residential Temporary C of O 2/11/2020 2/11/2020 at 1:45 PM 02/11/2020
Misc
Corrective Action Required
02/10/2020
-Final grade, sod, downspout extensions
Occupancy Inspection - Codes Residential Full C of O 3/30/2020 03/30/2020
Misc
Resolved
03/30/2020
-Final grade, sod, downspout extensions
Documents & Images

No documents are currently available for viewing.

Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide: