Permit Application Status

PRRES20183809


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRRES20183809
Building Permit - Residential
Certificate of Occupancy
NEW SINGLE FAMILY
NEW HOUSE - FINISHED BASEMENT - COVERED DECK
11/06/2018
11/13/2018
09/22/2021
Locations
Contacts
LANDROCK SIGNATURE HOMES LLC, Address:4335 MCGEE ST, Phone:(816) 863-5588  
EVEN TEMP LLC, Address:748 N 100 RD, Phone:(785) 248-8756  
PREMIER ELECTRIC & LIGHTING DESIGN, Address:PO BOX 1311, Phone:(816) 564-7660  
CENTURY PLUMBING, Address:14001 CENTURY LN, Phone:(816) 765-6066  
JP@LANDROCKKC.COM  
Reviews
Review Type Outcome Est. Completion Date Completed
Plot Plan Review Approved 11/08/2018 11/09/2018
Kim Brennan
Sidewalks
Corrective Action Required
11/07/2018

Sidewalks with dimensions must be provided on the plot plan. ***Missing sidewalk that is shown on plat***
City infrustructure
Corrective Action Required
11/07/2018

Show all manholes, water valve boxes, fire hydrants, and stormwater structures. ***Missing FH and valve***
100-year floodplain
Corrective Action Required
11/07/2018

100-year floodplain, where applicable, must be shown on the plot plan. (Foundation elevation certificate required prior to occupancy) ***The floodplain is not called out***
Lot elevations
Corrective Action Required
11/07/2018

Existing and finish elevations at all property corners must be provided on the plot plan. ***The MDP shows elevations where the lot lines meet the SS easment. Please call those out***
Residential Plan Review Approved 11/08/2018 11/09/2018
Kim Brennan
08 Designate locations of smoke detectors and carbon monoxide detectors
Corrective Action Required
11/06/2018

Designate locations of smoke detectors and carbon monoxide detectors. (IRC Section R314 and R315) no smoke detector shown in loft area
37 Provide details for any walls over 10 feet in height.
Corrective Action Required
11/06/2018

Provide details for any walls over 10 feet in height. Include stud grade, size, spacing and actual, uninterrupted height. (IRC Section 602.3.1 and Table 602.3(5) & 602.3.1) does not sepcify uninterrupted height.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee New Single Family $1,421.89 $1,421.89 Paid 11/13/2018
9110073-Right of Way Permit Fee $80.00 $80.00 Paid Not payable online 11/13/2018
8331507-Sewer Connection Fee $360.00 $360.00 Paid 11/13/2018
8331401-Water Tap Fee $3,409.00 $3,409.00 Paid 11/13/2018
8350015-Water Meter Fee $408.37 $408.37 Paid 11/13/2018
Outstanding Fees Amount Paid Owing Date Paid
9110080-Not Ready Inspection Fee $50.00 $0.00 $50.00 Not Paid


$50.00    Add Fees to My Cart
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Residential Partial 12/21/2018 12/21/2018 12/21/2018
Misc
Corrective Action Required
12/21/2018
send in engineers report for file ok to pour
Underslab Plumbing Inspection - Residential Passed 2/5/2019 at 7:30 AM 02/05/2019
Erosion Control Inspection Residential Failed 3/7/2019 03/07/2019
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/07/2019
John DiMauro 03/07/2019 11:56 AM EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. EROSION CONTROL DEVICES NEED TO BE INSTALLED ALONG THE BACK SIDE OF THE PROPERTY TO PROTECT THE CREEK FROM FURTHER SILTATION.
Erosion Control Inspection Residential Passed 3/14/2019 03/14/2019
DCM1 ESC REQUIRED NO FURTHER INSP
Corrective Action Required
03/07/2019
John DiMauro 03/07/2019 11:56 AM EROSION CONTROL REQUIRED. NO FURTHER INSPECTIONS WILL BE PERFORMED UNTIL EROSION CONTROL IS INSTALLED AND IN COMPLIANCE. EROSION CONTROL DEVICES NEED TO BE INSTALLED ALONG THE BACK SIDE OF THE PROPERTY TO PROTECT THE CREEK FROM FURTHER SILTATION.
Sewer Service Inspection - R Passed 4/26/2019 (1:00) 4/26/2019 at 1:20 PM 04/26/2019
All Rough Inspection - Residential Failed 4/29/2019 4/29/2019 at 9:30 AM 04/29/2019
Misc
Corrective Action Required
04/29/2019
1.Install anchors within 12” of bottom plate ends and splices on north and south walls in garage. 2.Fire stop all electrical penetrations through top and bottom plates 1st,2nd, and basement. 3.Fire block above fireplace. 4.fire stop gas line penetration at fireplace. 5.fire stop all plumbing penetrations all floors throughout house. 6.nail corner stud master closet. 7.fire stop at dryer vent pan (floor sheathing). 8.complete fire blocking at heat flue at top and dead space between flue and supply duct. 9.fire block dead space at double wall above refrigerator location. 10.provide attic access for garage and adjoining attic spaces. 11.provide attic access for s 2nd fl loft attic space. 12.provide attic access for space above covered deck. 13.Install four studs on first fl under studs supporting steel beam in loft and solid block underneath. 14.fire block top of double wall and from end of fir down on north side of family room in basement. 15.fire block top of north and west wall in room next to stairs in basement, start vertical fire blocking at stairs and repeat at 10’ intervals until the point of furnace rm wall. 16.Fire block top of west wall in family rm in basement. 17.Fir down for duct work in middle bedroom in basement northeast corner. 18.Complete fire blocking at closet top plate in south bedroom in basement and nail off vertical blocking 19.Install egress door in basement. 20.Install door to deck.
Electrical Service Inspection Passed 4/29/2019 4/29/2019 04/29/2019
Gas Piping Inspection - Residential Passed 4/29/2019 04/29/2019
Gas Service Inspection - Residential Passed 4/29/2019 4/29/2019 04/29/2019
Water Service Inspection - R Passed 5/1/2019 5/1/2019 at 3:30 PM 05/01/2019
All Rough Inspection - Residential Partial 5/6/2019 5/6/2019 at 10:00 AM 05/06/2019
Misc
Resolved
05/06/2019
1.Install anchors within 12” of bottom plate ends and splices on north and south walls in garage. 2.Fire stop all electrical penetrations through top and bottom plates 1st,2nd, and basement. 3.Fire block above fireplace. 4.fire stop gas line penetration at fireplace. 5.fire stop all plumbing penetrations all floors throughout house. 6.nail corner stud master closet. 7.fire stop at dryer vent pan (floor sheathing). 8.complete fire blocking at heat flue at top and dead space between flue and supply duct. 9.fire block dead space at double wall above refrigerator location. 10.provide attic access for garage and adjoining attic spaces. 11.provide attic access for s 2nd fl loft attic space. 12.provide attic access for space above covered deck. 13.Install four studs on first fl under studs supporting steel beam in loft and solid block underneath. 14.fire block top of double wall and from end of fir down on north side of family room in basement. 15.fire block top of north and west wall in room next to stairs in basement, start vertical fire blocking at stairs and repeat at 10’ intervals until the point of furnace rm wall. 16.Fire block top of west wall in family rm in basement. 17.Fir down for duct work in middle bedroom in basement northeast corner. 18.Complete fire blocking at closet top plate in south bedroom in basement and nail off vertical blocking 19.Install egress door in basement. 20.Install door to deck.
Misc
Corrective Action Required
05/06/2019
1. fire stop electrical penetrations at top plate above garage entry door. 2. where 4 studs were added to support steel beam in great rm. studs were notched for electrical. protect electical wiring with plates from side to side. OK TO INSULATE
Driveway Inspection Partial 6/20/2019 (P.M.) 6/20/2019 06/20/2019
Misc
Informational
06/20/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Driveway Inspection Passed 6/21/2019 07/02/2019
Misc
Informational
06/20/2019
PRE POUR INSPECTION The forms are set and there appears to be sufficient compacted aggregate.
Occupancy Inspection - Codes Residential Failed 8/15/2019 8/15/2019 08/15/2019
Misc
Corrective Action Required
08/15/2019
sod, final grade, splash blocks -install toilet master bath -install light at main entry door -install cook top -install dishwasher -back deck outlet is loose, needs to be tightened -back sliding door needs second locking device -powder room sink and toilet needs installed -construction debris needs cleaned out of garage -handrail going up to loft and down to basement needs to be installed -sump pump needs to be installed along with all other plumbing in unfinished area of basement -not allowed to move anything in before TCO, stuff in suspended slab area -fire protection needed for I joists in unfinished basement area -hot water heater needs installed -install shower head, toilet, sink/faucets in down stairs bathroom -all exterior light fixtures, A/c disconnect, outlet by a/c, need to be sealed -windows in loft area need to be tempered -irrigation permit needed
Occupancy Inspection - Codes Residential Failed 8/19/2019 08/19/2019
Misc
Corrective Action Required
08/15/2019
sod, final grade, splash blocks -back deck outlet is loose, needs to be tightened -back sliding door needs second locking device -powder room sink needs to be installed -construction debris needs cleaned out of garage -sump pump needs to be installed along with all other plumbing in unfinished area of basement, anti syphon devise needed for spicket, water line needs to be secured mid way -not allowed to move anything in before TCO, stuff in suspended slab area -fire protection needed for I joists in unfinished basement area -install sink/faucets in down stairs bathroom -all exterior light fixtures, A/c disconnect, outlet by a/c, need to be sealed -windows in loft area need to be tempered -irrigation permit needed and back flow test needs to be submitted to water department
Occupancy Inspection - Codes Residential Not Ready 8/21/2019 08/21/2019
Misc
Corrective Action Required
08/15/2019
Outcome: not ready Date: Monday, August 19, 2019 Comments: sod, final grade, splash blocks -back deck outlet is loose, needs to be tightened -back sliding door needs second locking device -powder room sink needs to be installed -construction debris needs cleaned out of garage -sump pump needs to be installed along with all other plumbing in unfinished area of basement, anti syphon devise needed for spicket, water line needs to be secured mid way -not allowed to move anything in before TCO, stuff in suspended slab area -fire protection needed for I joists in unfinished basement area -install sink/faucets in down stairs bathroom -all exterior light fixtures, A/c disconnect, outlet by a/c, need to be sealed -windows in loft area need to be tempered -irrigation permit needed and back flow test needs to be submitted to water department *moving company unloading home owners stuff into garage and house without builder present. Builder will need to be present for any furhter inspections. Not ready fee will need to be paid before CofO
Occupancy Inspection - Codes Residential Temporary C of O 8/22/2019 8/22/2019 08/22/2019
Misc
Corrective Action Required
08/22/2019
sod, final grade, splash blocks - anti syphon devise needed for spicket in basement, water line needs to be secured mid way -irrigation permit needed and back flow test needs to be submitted to water department
Occupancy Inspection - Codes Residential Failed 9/23/2019 09/23/2019
Miscellaneous Correction
Resolved
09/22/2021
No access to structure sod, final grade, splash blocks - anti syphon devise needed for spicket in basement, water line needs to be secured mid way -irrigation permit needed and back flow test needs to be submitted to water department
Occupancy Inspection - Codes Residential Full C of O 09/22/2021
Documents & Images
Date Uploaded File Type Document Name
11/06/2018 Letter Codes Residential Plan Review
11/07/2018 Letter Codes Residential Plan Review
11/13/2018 Receipt Receipt for transaction: 2018-007205
11/13/2018 Letter Codes Building Permit
11/15/2018 Plot Plan DOC111518-003
12/21/2018 Letter INSPECTION SUMMARY
02/05/2019 Letter INSPECTION SUMMARY
03/07/2019 Letter DE-Daily Inspection Summary
03/14/2019 Letter INSPECTION SUMMARY
04/19/2019 Engineer Report/Study Final_2019.04.11_Susp GSlab Stoop_Pat Cochran
04/26/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
04/29/2019 Letter INSPECTION SUMMARY
05/01/2019 Letter INSPECTION SUMMARY
05/06/2019 Letter INSPECTION SUMMARY
06/20/2019 Letter INSPECTION SUMMARY
06/20/2019 Letter INSPECTION SUMMARY
06/20/2019 Letter INSPECTION SUMMARY
07/02/2019 Letter INSPECTION SUMMARY
08/15/2019 Letter INSPECTION SUMMARY
08/19/2019 Letter INSPECTION SUMMARY
08/21/2019 Letter INSPECTION SUMMARY
08/22/2019 Letter Codes Temporary Certificate of Occupancy
09/23/2019 Letter INSPECTION SUMMARY
09/22/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home