Permit Application Status

PRCOMCOM20220491


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOMCOM20220491
Building Permit - Commercial
Certificate of Occupancy
CP DEER BROOK PLAZA LLC
CHANGE OF TENANT
TENANT FINISH FOR PHYSICAL THERAPY CLINIC
02/09/2022
07/11/2022
12/14/2022
09/22/2022
Locations
Contacts
HAREN CONTRACTING, Address:8035 NIEMAN RD, Phone:(913) 495-9558  
MEastland@harencompanies.com, Address:MEastland@harencompanies.com, Phone:(816) 810-6755  
MIDWEST HEATING COOLING & PLUMBING, Address:13228 HOLMES RD, Phone:(816) 943-8513  
ELECTRIC ONE LLC, Address:7312 N ANTIOCH RD, Phone:(816) 437-9312  
HENRY MILLER MECHANICAL LLC, Address:6609 ROYAL ST, SUITE 104, Phone:(816) 883-8818  
Justin Bae, Address:15362 S Constance St, Phone:(816) 267-1869  
CP DEER BROOK PLAZA LLC, Address:3400 COLLEGE BLVD STE 195  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 08/18/2022
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
08/18/2022

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Plans received August 18, 2022.
Installation acceptance testing
Corrective Action Required
08/18/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule a test. Preferrably before regular business hours.
Fire Plan Review Approved with Conditions 07/08/2022 07/06/2022
Jim Eden
Miscellaneous Correction
Resolved
07/06/2022

Provide remote test/ reset/annunciators for the duct detectors.
Construction documents - Fire protection systems
Resolved
07/07/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for the fire sprinkler system for any modifications to maintain coverage.
Misc
Informational
07/06/2022

All other existing conditions verified at time of inspection.
Building Plan Review Approved with Conditions 07/08/2022 07/01/2022
Joe Frogge
Project cost
Resolved
06/30/2022

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes.
IPC 403.1 Minimum number of fixtures
Resolved
07/01/2022

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved alternate.
IBC 1209.2 Finish materials
Resolved
07/01/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish material at janitor's sink. If paint it must be epoxy based.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
06/30/2022

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle near new condensing units. 7/1/22 - addressed in note. field verify
IBC 1606.2 Design dead load - structural
Resolved
07/01/2022

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify roof structure will support additional load at new ceiling hung furnaces. Or provide design to strengthen.
NEC Article 517.13 Grounding of receptacles patient care
Resolved
07/01/2022

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system.
Licensed Contractors Approved 07/08/2022 06/30/2022
Joe Frogge
LC - General Contractor
Resolved
06/30/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Resolved
06/30/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Sprinkler Plan Review Released for Construction 06/27/2022
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
06/27/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Plans received 6/27/2022.
Installation acceptance testing
Corrective Action Required
06/27/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. A visual inspection will be completed at the occupancy inspection.
IFGC - Inspection, testing and maintenance - alarm and extinguishing systems 901.6
Corrective Action Required
06/27/2022

2018 IFC 901.6- Inspection, testing and maintenance. Fire detection, alarm and extinguishing systems shall be maintained in an operative condition at all times, and shall be replaced or repaired where defective. Not required fire protection systems and equipment shall be inspected, tested and maintained or removed. The existing building shall have documentation of a current annual inspection.
Fire Plan Review Rejected 06/17/2022 06/17/2022
Jim Eden
Miscellaneous Correction
Corrective Action Required
06/17/2022

Provide remote test/ reset/annunciators for the duct detectors.
Construction documents - Fire protection systems
Corrective Action Required
06/17/2022

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action required- Provide shop drawings for the fire sprinkler system for any modifications to maintain coverage.
Misc
Corrective Action Required
06/17/2022

All other existing conditions verified at time of inspection.
Building Plan Review Rejected 06/17/2022 06/10/2022
Joe Frogge
Project cost
Corrective Action Required
06/09/2022

The project cost, which is used to establish the permit fee, has not been provided. Action required: Comment is for informational purposes.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
06/10/2022

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide drinking fountain or approved alternate.
IBC 1209.2 Finish materials
Corrective Action Required
06/10/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) Action required: Specify compliant wall finish material at janitor's sink. If paint it must be epoxy based.
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
06/10/2022

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle near new condensing units.
IBC 1606.2 Design dead load - structural
Corrective Action Required
06/10/2022

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Action required: Provide engineer’s report to verify roof structure will support additional load at new ceiling hung furnaces. Or provide design to strengthen.
NEC Article 517.13 Grounding of receptacles patient care
Corrective Action Required
06/10/2022

2017 NEC Article 517.13 Grounding of Receptacles and Fixed Electrical Equipment in Patient Care Spaces. Wiring in patient care spaces shall comply with 517.13(A) and (B). (A) Wiring methods. All branch circuits serving patient care spaces shall be provided with an effective ground-fault current path by installation in a metal raceway system, or a cable having a metallic armor or sheath assembly. The metal raceway system, metallic cable armor, or sheath assembly shall itself qualify as an equipment grounding conductor in accordance with 250.118. (B) Insulated Equipment Grounding Conductors and Insulated Equipment Bonding Jumpers. (1) General. The following shall be directly connected to an insulated copper equipment grounding conductor that is clearly identified along its entire length by green insulation and installed with the branch circuit conductors in the wiring methods as provided in 517.13(A). 1. The grounding terminals of all receptacles other than isolated ground receptacles. 2. Metal outlet boxes, metal device boxes, or metal enclosures. 3. All non-current-carrying conductive surfaces of fixed electrical equipment likely to become energized that are subject to personal contact, operating at over 100 volts. (see code for exceptions) (2) Sizing. Equipment grounding conductors and equipment bonding jumpers shall be sized in accordance with 250.122. Action required: Modify drawings to show that all circuits in patient care areas will have redundant ground system.
Licensed Contractors Rejected 06/07/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
06/07/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide an email address & phone number for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
06/07/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $522.33 $522.33 Paid 07/07/2022
$13,950.00
8331507-Sewer Connection Fee $180.00 $180.00 Paid 07/07/2022
7232302-Commercial Excise Tax Fee $4,650.00 $4,650.00 Paid 06/07/2022
$4,650.00
9110078-Temporary Occupancy Fee $50.00 $50.00 Paid 09/09/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Passed 7/12/2022 7/12/2022 07/12/2022
Informational
07/12/2022
UNDERSLAB PLUMBING OK; HOWEVER, ADDRESS CANNOT BE 1153, WHICH BELONGS TO A DIFFERENT TENANT. PLEASE CHANGE THE ADDRESS OF PERMIT TO A CORRECT ONE
In-wall Inspection Failed 7/19/2022 7/19/2022 07/19/2022
Misc
Corrective Action Required
07/19/2022
-PROVIDE BACKINGS FOR THE 18" VERTICAL GRAB BARS IN RESTROOMS -PROTECT PLUMBING IN LAUNDRY ROOM -CIRCUITS TO SWITCHES AND LIGHTS IN PATIENT CARE AREA SHALL BE COMPLIANT WITH 517.13(A). ALSO PER REQUIREMENT OF 517.13(B), SHALL USE THE INSULATED EQUIPMENT GROUNDING CONDUCTOR WITHIN THE HCF-SG MC TO BOND ALL BOXES/EQUIPMENT ENCLOSURE, RECEPTACLES, AND SWITCHES, EXCEPT FOR LIGHTS MORE THAN 7.5 FT ABOVE FLOOR
In-wall Inspection Failed 7/21/2022 7/21/2022 07/20/2022
Misc
Corrective Action Required
07/19/2022
-PROTECT PLUMBING IN LAUNDRY ROOM
Above Ceiling Inspection Failed 8/19/2022 08/19/2022
Misc
Corrective Action Required
08/19/2022
-Color/tag/ ID MC support wires -Secure MC within 12” of j-boxes, except where the MC directly go to the ceiling lights -Circuits to ceiling lights above patient care area must meet NEC 517.13 -Support ceiling grid at max 4 ft interval. Twist wire min 3 times
In-wall Inspection Passed 08/23/2022
Above Ceiling Inspection Passed 8/23/2022 8/23/2022 08/23/2022
Misc
Resolved
08/23/2022
-Color/tag/ ID MC support wires -Secure MC within 12” of j-boxes, except where the MC directly go to the ceiling lights -Circuits to ceiling lights above patient care area must meet NEC 517.13 -Support ceiling grid at max 4 ft interval. Twist wire min 3 times
Alarm Test Passed 9/1/2022 09/01/2022
Occupancy Inspection - Codes Commercial Ready for Temp CO 9/8/2022 9/8/2022 09/08/2022
Misc
Corrective Action Required
09/08/2022
-Provide restroom signage per ADA -Lower restroom mirror to max 40” above floor
Occupancy Inspection - Fire Passed 9/8/2022 9/8/2022 09/08/2022
Corrective Action Required
09/08/2022
All life safety was appropriate. Okay to occupy with approval from codes.
Occupancy Inspection - Codes Commercial Temporary C of O 09/09/2022
Misc
Corrective Action Required
09/08/2022
-Provide restroom signage per ADA -Lower restroom mirror to max 40” above floor
Occupancy Inspection - Codes Commercial Full C of O 9/22/2022 9/22/2022 09/22/2022
Misc
Resolved
09/22/2022
-Provide restroom signage per ADA -Lower restroom mirror to max 40” above floor
Documents & Images
Date Uploaded File Type Document Name
02/09/2022 Application Form Prime Physical Therapy - Commercial Permit Application
02/15/2022 Plans 20220215 Physical Therapy Clinic Set
06/07/2022 Drawing Sheet Index
06/07/2022 Plans Architectural Drawings
06/07/2022 Plans Mechanical Drawings
06/07/2022 Plans Electrical Drawings
06/07/2022 Plans Plumbing Drawings
06/17/2022 Letter DS P/R Corrections Document
06/27/2022 Letter Fire (Sprinkler) Plan Review
06/30/2022 Engineer Report/Study 2022_06_28_Structural Report
06/30/2022 Plans Prime Physical Therapy Permit Set_Rev_1
07/07/2022 Approved Plans approved - Prime Physical Therapy Permit Set_Rev_1
07/07/2022 Letter License Tax Bill
07/07/2022 Receipt Receipt for transaction:2022-005584
07/11/2022 Letter DS Building Permit
07/12/2022 Letter INSPECTION SUMMARY
07/19/2022 Letter INSPECTION SUMMARY
07/20/2022 Letter Fire Building Plan Review
07/20/2022 Letter INSPECTION SUMMARY
07/28/2022 Letter DS Building Permit
08/18/2022 KCFS_FA_HAREN_PRIME_PT_NICET_III
08/18/2022 KCFS_EQ_PRIME_PT
08/18/2022 Letter Fire (Alarm) Plan Review Notice
08/19/2022 Letter INSPECTION SUMMARY
08/23/2022 Letter INSPECTION SUMMARY
09/08/2022 Letter INSPECTION SUMMARY
09/08/2022 Letter Fire Loss Reduction Form
09/09/2022 Receipt Receipt for transaction:2022-007431
09/09/2022 Letter Codes Temporary Certificate of Occupancy
09/22/2022 Letter Field Certificate of Occupancy
09/22/2022 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home