Permit Application Status

PRCOM20251957


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20251957
Building Permit - Commercial
Issued - Partial
OLDHAM INVESTORS LLC
NEW SHELL BUILDING
Q39 - NEW SHELL FOR FUTURE RESTAURANT -site work and foundation permit issued
05/12/2025
09/26/2025
11/19/2025
Locations
Contacts
CENTRIC CONSTRUCTION GROUP, Address:520 W PENNWAY STE 100, Phone:(816) 389-8300  
Nate Eubanks - Centric Construction, Phone:(816) 547-9160  
B & C MECHANICAL SERVICES LLC, Address:2008 E SPRUCE CIR STE B, Phone:(913) 681-0088  
TEAGUE ELECTRIC CONSTRUCTION LLC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
WHATEVER IT TAKES ELECTRICAL CONTRACTORS LLC, Address:9709 E 56TH STREET, Phone:(816) 743-0770  
BRR Architecture, Address:8131 Metcalf Ave, Phone:(913) 262-9095  
OLDHAM INVESTORS LLC, Address:1700 132ND ST STE 150  
Brad Wehde, Address:520 W. Pennway St, Phone:(816) 389-8300  
Jared Sloniker, Address:19621 S 2600 Rd, Phone:(816) 542-7243  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 10/23/2025 10/23/2025
Joe Frogge
Final Development Plan
Resolved
10/23/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 7/1/2025 - Acknowledged in letter.
Fire Plan Review Approved 10/23/2025 10/23/2025
Craig Hill
Licensed Contractors Approved 07/01/2025 08/15/2025
Joe Frogge
LC - MEP Subs
Resolved
08/15/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 7/1/2025 - Acknowledged in letter.
Final Development Plan Review Approved 08/08/2025 07/31/2025
Grant White
Building Plan Review Rejected 07/01/2025 07/01/2025
Joe Frogge
Final Development Plan
Corrective Action Required
06/24/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational. 7/1/2025 - Acknowledged in letter.
Planning - Screening of rooftop equipment
Resolved
07/01/2025

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (parapet is not tall enough)
IBC 1803.1 General - geotech
Resolved
07/01/2025

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (2,400psf cited on sheet S001)
IPC 708.1 Cleanouts required
Resolved
07/01/2025

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts to comply. 3 locations)
NEC Article 110.26 (C)(2) Large equipment
Resolved
07/01/2025

2017 NEC Article 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Provide panic device hardware at door 126 out of electrical room.
Fire Plan Review Approved 07/01/2025 06/30/2025
Craig Hill
Fire Plan Review Approved 05/27/2025 05/22/2025
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
05/22/2025

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
05/22/2025

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Rejected 05/27/2025 05/22/2025
Joe Frogge
Final Development Plan
Corrective Action Required
05/22/2025

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is informational.
Planning - Screening of rooftop equipment
Corrective Action Required
05/22/2025

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (parapet is not tall enough)
IBC 1803.1 General - geotech
Corrective Action Required
05/22/2025

2018 IBC 1803.1 General. Geotechnical investigations shall be conducted in accordance with Section 1803.2 and reported in accordance with Section 1803.6. Where required by the building official or where geotechnical investigations involve in-situ testing, laboratory testing or engineering calculations, such investigations shall be conducted by a registered design professional. Action required: Provide soils report to justify design assumption of soil bearing capacity greater than 2,000psf. (2,400psf cited on sheet S001)
IPC 708.1 Cleanouts required
Corrective Action Required
05/22/2025

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide cleanouts to comply. 3 locations)
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
05/22/2025

2017 NEC Article 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Provide panic device hardware at door 126 out of electrical room.
Licensed Contractors Rejected 05/27/2025 05/22/2025
Joe Frogge
LC - General Contractor
Resolved
05/23/2025

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
05/22/2025

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Fees
Paid Fees Amount Paid Owing Date Paid
Valuation Fee for New Commercial $8,000.00 $8,000.00 Paid 09/25/2025
Commercial Excise Tax Fee $34,963.50 $34,963.50 Paid 10/10/2025
Parks Impact Fee Non-Residential - Zone 4 $1,642.60 $1,642.60 Paid 09/25/2025
Right of Way Permit Fee $85.00 $85.00 Paid 09/23/2025
Site Grading Fee $252.56 $252.56 Paid 09/23/2025
Sanitary Sewer Insp Fees $540.60 $540.60 Paid 09/23/2025
Water Insp Fee $1,095.60 $1,095.60 Paid 09/23/2025
Paved Surface Inspection Fee $17,438.74 $17,438.74 Paid 09/23/2025
Storm Sewer Inspection Fee $2,969.40 $2,969.40 Paid 09/23/2025
Water Meter Fee $3,922.34 $3,922.34 Paid 10/10/2025
Water Tap Fee $27,200.00 $27,200.00 Paid 10/10/2025
Water Test Fee $200.00 $200.00 Paid 10/10/2025
Sanitary Sewer Development Fee $15,995.00 $15,995.00 Paid 10/10/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Hood/Duct Inspection Pending
Alternate Protection Systems Inspection Pending
Piers/Caissons Inspection - Commercial Pending
Underslab Plumbing Inspection - Commercial Pending
Water Service Inspection Pending
Electrical Service Inspection Pending
Gas Service Inspection - Commercial Pending
In-wall Inspection Pending
Grading/Excavation/Fill Inspection Pending
Sanitary Sewer Construction Inspection Pending
Sanitary Sewer - Air Test Pending
Sanitary Sewer - Mandrel Pending
Sanitary Sewer - Vacuum Pending
Pavement-Proof Roll Pending
Pavement-Surface Pending
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Pavement-Curb Construction Pending
Pavement-Stabilized Subgrade Pending
Storm Sewer Construction Inspection Pending
Hood/Duct Inspection Pending
Grading/Excavation/Fill Inspection Pending
Water Line - Construction Inspection Pending
Sanitary Sewer Construction Inspection Pending
Pavement-Proof Roll Pending
Install Street and Stop Signs Pending
Pavement-Aggregate Base Pending
Pavement-Curb Construction Pending
Pavement-Stabilized Subgrade Pending
Storm Sewer Construction Inspection Pending
Foundation Inspection - Commercial Pending
Underground Plumbing Inspection - Commercial Pending
Misc
Informational
10/28/2025
-Fireline entering into building and roughly 10’ out -stub out from foundation for grease interceptor -sanitary sewer stub out from foundation
Erosion Control Inspection Pending
Misc
Informational
10/31/2025
10-30-25 Dustin A, Erosion control is in place and maintained.
Footing Inspection - Commercial Pending
Misc
Informational
11/05/2025
Plans marked on site Following areas approved A-b/1 A/1-4 4/A-E E/4-2 1/c.1-d.1 A-ENorth side of Line 1 Complete perimeter footing. 3 interior footing pads 12 pad footings around building Exterior fireplace footings Perimeter footing stem walls Trash enclosure footings and pads
Site Visit Pending
Misc
Informational
11/07/2025
10-27-25 Dustin A, No work for dev, crews working on pad site 10-29-25 Dustin A, Rain off and on , pad site work 11-5-25 Dustin A, No work for Dev being done 11-7-25 Dustin A, Bair is on site doing some utility work. Needed to break concrete out to get to sewer
Above Ceiling Inspection Pending 12/24/2025
Footing Inspection - Commercial Partial 10/15/2025 10/15/2025 10/15/2025
Misc
Informational
10/15/2025
Following areas approved A-b/1 A/1-4 4/A-c.1
Footing Inspection - Commercial Partial 10/16/2025 10/16/2025 10/16/2025
Misc
Informational
10/15/2025
Plans marked on site Following areas approved A-b/1 A/1-4 4/A-E E/4-2
Erosion Control Inspection Partial 10/16/2025 10/16/2025 10/16/2025
Misc
Informational
10/16/2025
10-16-25 Dustin A, Erosion control is in place and there was a washout installed. They are getting me a swppp report
Footing Inspection - Commercial Partial 10/17/2025 10/17/2025 10/17/2025
Misc
Informational
10/16/2025
Plans marked on site Following areas approved A-b/1 A/1-4 4/A-E E/4-2 1/c.1-d.1 A-ENorth side of Line 1
Footing Inspection - Commercial Partial 10/21/2025 10/21/2025 10/21/2025
Misc
Informational
10/17/2025
Plans marked on site Following areas approved A-b/1 A/1-4 4/A-E E/4-2 1/c.1-d.1 A-ENorth side of Line 1 Complete perimeter footing. 3 interior footing pads
Footing Inspection - Commercial Partial 10/23/2025 10/23/2025
Misc
Informational
10/21/2025
Plans marked on site Following areas approved A-b/1 A/1-4 4/A-E E/4-2 1/c.1-d.1 A-ENorth side of Line 1 Complete perimeter footing. 3 interior footing pads 12 pad footings around building Exterior fireplace footings
Underground Plumbing Inspection - Commercial Partial 10/28/2025 10/28/2025
Misc
Informational
10/28/2025
-Fireline entering into building and roughly 10’ out -stub out from foundation for grease interceptor -sanitary sewer stub out from foundation
Footing Inspection - Commercial Partial 10/28/2025 10/28/2025 10/28/2025
Misc
Informational
10/23/2025
Plans marked on site Following areas approved A-b/1 A/1-4 4/A-E E/4-2 1/c.1-d.1 A-ENorth side of Line 1 Complete perimeter footing. 3 interior footing pads 12 pad footings around building Exterior fireplace footings Perimeter footing stem walls
Water Line - Construction Inspection Partial 10/30/2025
Misc
Informational
10/30/2025
10-29-25 Dustin A, Fdc in stalled inside building and ran outside of footing ,
Site Visit Partial 10/27/2025 10/27/2025 10/31/2025
Misc
Informational
10/31/2025
10-27-25 Dustin A, No work for dev, crews working on pad site
Site Visit Partial 10/29/2025 10/29/2025 10/31/2025
Misc
Informational
10/31/2025
10-27-25 Dustin A, No work for dev, crews working on pad site 10-29-25 Dustin A, Rain off and on , pad site work
Erosion Control Inspection Partial 10/31/2025
Misc
Informational
10/31/2025
10-30-25 Dustin A, Erosion control is in place and maintained.
Footing Inspection - Commercial Partial 11/5/2025 11/5/2025 11/05/2025
Misc
Informational
10/28/2025
Plans marked on site Following areas approved A-b/1 A/1-4 4/A-E E/4-2 1/c.1-d.1 A-ENorth side of Line 1 Complete perimeter footing. 3 interior footing pads 12 pad footings around building Exterior fireplace footings Perimeter footing stem walls Trash enclosure footings and pads
Site Visit Partial 11/06/2025
Misc
Informational
10/31/2025
10-27-25 Dustin A, No work for dev, crews working on pad site 10-29-25 Dustin A, Rain off and on , pad site work 11-5-25 Dustin A, No work for Dev being done
Site Visit Partial 11/07/2025
Misc
Informational
11/06/2025
10-27-25 Dustin A, No work for dev, crews working on pad site 10-29-25 Dustin A, Rain off and on , pad site work 11-5-25 Dustin A, No work for Dev being done 11-7-25 Dustin A, Bair is on site doing some utility work. Needed to break concrete out to get to sewer
Documents & Images
Date Uploaded File Type Document Name
05/12/2025 Application Form APPLICATION
05/12/2025 Plans Q39 SHELL ARCH OTP SNS
05/13/2025 Plans Q39 SHELL LS COMBINED DRAWING SET
05/14/2025 Letter License Tax Bill
05/23/2025 Letter DS P/R Corrections Document
06/24/2025 Engineer Report/Study Q39 LS GEOTECHNICAL REPORT
06/24/2025 Letter Q39 LS SHELL ADD 1 NARRATIVE
06/24/2025 Letter Q39 LS SHELL CODE RESPONSE
06/24/2025 Plans Q39 SHELL LS ADDENDUM 1 COMBINED DRAWING SET
09/23/2025 Receipt Receipt for transaction:2025-007306
09/25/2025 Receipt Receipt for transaction:2025-007361
09/26/2025 Letter DS Building Permit
10/10/2025 Receipt Receipt for transaction: 2025-007680
10/15/2025 Letter INSPECTION SUMMARY
10/16/2025 Letter INSPECTION SUMMARY
10/16/2025 Letter INSPECTION SUMMARY
10/16/2025 Letter Q39 LS SHELL ADD 2 NARRATIVE
10/16/2025 Plans Q39 SHELL LS ADDENDUM 2 COMBINED DRAWING SET
10/17/2025 Letter INSPECTION SUMMARY
10/21/2025 Letter INSPECTION SUMMARY
10/23/2025 Letter INSPECTION SUMMARY
10/23/2025 Approved Plans Approved construction plans
10/28/2025 Letter INSPECTION SUMMARY
10/28/2025 Letter INSPECTION SUMMARY
07/31/2025 Approved Plans Approved FDP_Q39_Oldham Village_PL2025102_7.31.2025
10/30/2025 Letter INSPECTION SUMMARY
10/30/2025 Approved Plans Approved plans_Q39_Oldham Village_PL2025102_10.30.2025
10/31/2025 Letter INSPECTION SUMMARY
10/31/2025 Letter INSPECTION SUMMARY
10/31/2025 Letter INSPECTION SUMMARY
10/31/2025 Q39 in Lees Summit SWPPP report 10-30-25
11/05/2025 Letter INSPECTION SUMMARY
11/06/2025 Letter INSPECTION SUMMARY
11/07/2025 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home