Review Type |
Outcome |
Est. Completion Date |
Completed |
Alarm Plan Review
|
Released for Construction
|
08/21/2024
|
08/21/2024
|
|
Craig Hill
|
|
Construction documents for fire alarm systems
Corrective Action Required
Released for construction: Call 969-1300 to schedule an alarm test.
|
|
|
Sprinkler Plan Review
|
Released for Construction
|
08/19/2024
|
08/19/2024
|
|
Craig Hill
|
|
|
Alarm Plan Review
|
Rejected
|
08/09/2024
|
08/07/2024
|
|
Jim Eden
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide PE stamped plans.
|
|
|
Building Plan Review
|
Approved with Conditions
|
07/15/2024
|
07/15/2024
|
|
Joe Frogge
|
|
License Tax - Payment
Corrective Action Required
A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process.
Action required: Comment is informational. The fee will be $29,766.00
6/3/2024 - Acknowledged in letter.
|
|
Project cost
The project cost, which is used to establish the permit fee, has not been provided.
Action required: Comment is informational.
6/3/2024 - Not addressed.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is informational.
6/3/2024 - Not addressed.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
07/15/2024
|
07/12/2024
|
|
Jim Eden
|
|
Portable fire extinguishers for commercial cooking equipment.
2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher.
Provide a K Class fire extinguisher and signage at the manual pull station for the hood system. The location shown is not at the manual pull station for the hood system. Verified at inspection.
|
|
Portable fire extinguishers - general
2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Show the location of ABC type fire extinguishers. Provide more than one, in a conspicuous location in a normal path of travel.
|
|
Miscellaneous Correction
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide plans for extending the automatic fire sprinkler to the patio.
|
|
|
Licensed Contractors
|
Approved
|
07/15/2024
|
07/08/2024
|
|
Joe Frogge
|
|
LC - General Contractor
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact which is where inspection reports will be sent.
6/3/2024 - Acknowledged in letter.
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
6/3/2024 - Acknowledged in letter.
|
|
|
Health Department Review
|
Approved
|
|
06/11/2024
|
|
Joe Frogge
|
|
|
Fire Plan Review
|
Rejected
|
06/11/2024
|
06/03/2024
|
|
Jim Eden
|
|
Construction documents for fire alarm systems
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide shop drawings for tenant finish alarm system.
|
|
Construction documents - Fire protection systems
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide shop drawings for tenant finish sprinkler system.
|
|
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher.
Provide a K Class fire extinguisher and signage at the manual pull station for the hood system. The location shown is not at the manual pull station for the hood system. Verified at inspection.
|
|
Portable fire extinguishers - general
Corrective Action Required
2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Show the location of ABC type fire extinguishers. Provide more than one, in a conspicuous location in a normal path of travel.
|
|
Miscellaneous Correction
5307.3 Insulated liquid carbon dioxide systems used in
beverage dispensing applications. Insulated liquid carbon
dioxide systems with more than 100 pounds (45.4 kg) of carbon dioxide used in beverage dispensing applications shall comply with Section 5307.3.1.
Provide detection our ventilation in CO2 beverage service gas area.
|
|
Miscellaneous Correction
Provide outdoor emergency lighting and exit signage on the patio to direct and illuminate the discharge pathway to the exit gates/openings.
|
|
Miscellaneous Correction
Several plans in the permit set for construction are marked NOT FOR CONSTRUCTION. Provide revised plans.
|
|
Miscellaneous Correction
Corrective Action Required
Provide a detail for the covering of the patio.
|
|
|
Building Plan Review
|
Rejected
|
06/11/2024
|
06/03/2024
|
|
Joe Frogge
|
|
License Tax - Payment
Corrective Action Required
A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process.
Action required: Comment is informational. The fee will be $29,766.00
6/3/2024 - Acknowledged in letter.
|
|
Project cost
Corrective Action Required
The project cost, which is used to establish the permit fee, has not been provided.
Action required: Comment is informational.
6/3/2024 - Not addressed.
|
|
Health Dept Review
For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Action required: Comment is informational.
6/3/2024 - Not addressed.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is informational.
6/3/2024 - Not addressed.
|
|
IBC 602.1 Type of Construction - general
2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code.
Action required: Update Code Summary to show correct construction type which is 5B. (fyi - if you opt to use wood studs, the wall supporting grease hood must remain non-combustible.)
|
|
NEC Article 110.26 (C)(2) Large equipment
2017 NEC Article 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware.
Action required: Provide panic hardware on door out of mechanical room that contains panel MDP1
|
|
Misc
Remove "NOT FOR CONSTRUCTION" note in title block.
|
|
|
Licensed Contractors
|
Rejected
|
06/11/2024
|
06/03/2024
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact which is where inspection reports will be sent.
6/3/2024 - Acknowledged in letter.
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
6/3/2024 - Acknowledged in letter.
|
|
|
Fire Plan Review
|
Rejected
|
05/14/2024
|
05/14/2024
|
|
Jim Eden
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide shop drawings for tenant finish alarm system.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide shop drawings for tenant finish sprinkler system.
|
|
Portable fire extinguishers for commercial cooking equipment.
Corrective Action Required
2018 IFC 904.11.5- Portable fire extinguishers for commercial cooking equipment. Portable fire extinguishers shall be provided within a 30-foot (9144 mm) travel distance of commercial-type cooking equipment. Cooking equipment involving vegetable or animal oils and fats shall be protected by a Class K rated portable extinguisher.
Provide a K Class fire extinguisher and signage at the manual pull station for the hood system.
|
|
Portable fire extinguishers - general
Corrective Action Required
2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10.
Show the location of ABC type fire extinguishers.
|
|
Miscellaneous Correction
Corrective Action Required
|
|
Miscellaneous Correction
Corrective Action Required
5307.3 Insulated liquid carbon dioxide systems used in
beverage dispensing applications. Insulated liquid carbon
dioxide systems with more than 100 pounds (45.4 kg) of carbon dioxide used in beverage dispensing applications shall comply with Section 5307.3.1.
Provide detection our ventilation in CO2 beverage service gas area.
|
|
Miscellaneous Correction
Corrective Action Required
Provide outdoor emergency lighting and exit signage on the patio to direct and illuminate the discharge pathway to the exit gates/openings.
|
|
Miscellaneous Correction
Corrective Action Required
Several plans in the permit set for construction are marked NOT FOR CONSTRUCTION. Provide revised plans.
|
|
Miscellaneous Correction
Corrective Action Required
Provide a detail for the covering of the patio.
|
|
|
Building Plan Review
|
Rejected
|
05/14/2024
|
05/13/2024
|
|
Joe Frogge
|
|
License Tax - Payment
Corrective Action Required
A one-time impact fee in the form of a license tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process.
Action required: Comment is informational. The fee will be $29,766.00
|
|
Project cost
Corrective Action Required
The project cost, which is used to establish the permit fee, has not been provided.
Action required: Comment is informational.
|
|
Health Dept Review
Corrective Action Required
For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 797-7162. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Action required: Comment is informational.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 797-7162. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is informational.
|
|
IBC 602.1 Type of Construction - general
Corrective Action Required
2018 IBC 602.1 General. Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. the building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection for openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code.
Action required: Update Code Summary to show correct construction type which is 5B. (fyi - if you opt to use wood studs, the wall supporting grease hood must remain non-combustible.)
|
|
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
2017 NEC Article 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware.
Action required: Provide panic hardware on door out of mechanical room that contains panel MDP1
|
|
Misc
Corrective Action Required
Remove "NOT FOR CONSTRUCTION" note in title block.
|
|
|
Licensed Contractors
|
Rejected
|
05/14/2024
|
05/07/2024
|
|
Joe Frogge
|
|
LC - General Contractor
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances.
Action required: Either a Class A or Class B license is required. Provide the company name of the licensed general contractor and the name, email address & phone number for the on-site contact which is where inspection reports will be sent.
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|