Review Type |
Outcome |
Est. Completion Date |
Completed |
Alarm Plan Review
|
Released for Construction
|
09/12/2023
|
09/01/2023
|
|
Jim Eden
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
8/31/2023-Revised plans received. Provide equipment specifications.
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Call (816) 969-1300 to schedule alarm test.
|
|
Miscellaneous Correction
Corrective Action Required
The exterior horn/strobe for the sprinkler system is shown in the wrong location.The FDC is on the south side of the building. Confirm the horn/strobe is properly located.
|
|
|
Alarm Plan Review
|
Rejected
|
09/12/2023
|
09/01/2023
|
|
Jim Eden
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
8/29/2023 The plans provided do not match existing conditions or provide coverage per NFPA 72.
|
|
Miscellaneous Correction
Corrective Action Required
The plans provided do not match existing conditions.
|
|
|
Alarm Plan Review
|
Rejected
|
09/11/2023
|
08/29/2023
|
|
Jim Eden
|
|
|
Alarm Plan Review
|
Rejected
|
03/07/2023
|
08/29/2023
|
|
Jim Eden
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Provide contractor shop drawings. Details on the notification appliances, and provide coverage to the complete space.
|
|
Miscellaneous Correction
Corrective Action Required
The drawings do not reflect existing conditions or provide adequate notification per NFPA 72. Revise and resubmit shop drawings.
|
|
|
Sprinkler Plan Review
|
Released for Construction
|
07/26/2023
|
07/17/2023
|
|
Jim Eden
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Stamped modification plans received.
|
|
Installation acceptance testing
Corrective Action Required
2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
A visual inspection will be made at the occupancy inspection.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
05/18/2023
|
05/21/2023
|
|
Jim Eden
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide shop drawings for modifications to the sprinkler system to provide coverage under the bar canopy and in the cooler.
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action required- Provide shop drawings for alarm notification appliances.
|
|
|
Building Plan Review
|
Approved with Conditions
|
05/18/2023
|
05/16/2023
|
|
Joe Frogge
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is informational.
3/16/23 - acknowledged in letter
|
|
|
Licensed Contractors
|
Approved
|
04/03/2023
|
04/19/2023
|
|
Joe Frogge
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
3/16/23 - acknowledged in letter
|
|
|
Building Plan Review
|
Approved with Conditions
|
04/03/2023
|
04/17/2023
|
|
Joe Frogge
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is informational.
3/16/23 - acknowledged in letter
|
|
IBC 2902.2 Separate facilities - fixture
2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions)
Actions required: Code Modification Request (CMR) required if your intention is to use 2021 IBC/IPC for shared gender restrooms.
3/16/23 - Pending review of CMR
|
|
IPC 403.1 Minimum number of fixtures
2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code.
Action required: Revise Plumbing Fixture Requirements schedule on G003 to show correct calculations which will be for Bar/Tavern, not Restaurant.
3/16/23 - Per ITAP website this is a beer hall where patrons are allowed to bring food which is not the same as a restaurant. Water Closet calcs need to be 1:40.
|
|
Design loads
The design loads, including live loads, dead loads, snow loads, wind load and seismic design, shall be provided.
Action required: Revise design criteria on S101, and engineer's report if applicable, to show correct snow load which is 20 psf.
3/16/23 - Noted as not relevant due to project being interior, but roof loading has been altered due to new roof top mounted hvac.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
04/03/2023
|
04/02/2023
|
|
Jim Eden
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide shop drawings for modifications to the sprinkler system to provide coverage under the bar canopy and in the cooler.
|
|
Miscellaneous Correction
If the door to the Deli is to be used as an accessible means of egress, provide exit signage over the door to the deli from the party room space. Also provivide signage at the passageway from the Bar/Dining area to the party room.
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action required- Provide shop drawings for alarm notification appliances.
|
|
|
Fire Plan Review
|
Approved with Conditions
|
03/21/2023
|
03/22/2023
|
|
Jim Eden
|
|
Miscellaneous Correction
The location of the FDC has moved to the southwest corner of the building. Relocate the Knox box to the same location 6' AFF. Also coordinate with the alarm contractor to move the exterior horn/strobe.
The FDC shall be marked to indicate the addresses served. Verified at inspection.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide shop drawings for modifications to the sprinkler system to provide coverage under the bar canopy and in the cooler.
|
|
Miscellaneous Correction
Corrective Action Required
If the door to the Deli is to be used as an accessible means of egress, provide exit signage over the door to the deli from the party room space. Also provivide signage at the passageway from the Bar/Dining area to the party room.
|
|
Misc
The door to the sprinkler and fire alarm room shall be marked.
|
|
Address numbers required
2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Action required-The doors to the individual tenants shall be posted with the address and unit number.
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action required- Provide shop drawings for alarm notification appliances.
|
|
|
Building Plan Review
|
Rejected
|
03/21/2023
|
03/16/2023
|
|
Joe Frogge
|
|
Health Dept Review
For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Action required: Comment is informational.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is informational.
3/16/23 - acknowledged in letter
|
|
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions)
Actions required: Code Modification Request (CMR) required if your intention is to use 2021 IBC/IPC for shared gender restrooms.
3/16/23 - Pending review of CMR
|
|
IPC 403.1 Minimum number of fixtures
Corrective Action Required
2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code.
Action required: Revise Plumbing Fixture Requirements schedule on G003 to show correct calculations which will be for Bar/Tavern, not Restaurant.
3/16/23 - Per ITAP website this is a beer hall where patrons are allowed to bring food which is not the same as a restaurant. Water Closet calcs need to be 1:40.
|
|
Design loads
Corrective Action Required
The design loads, including live loads, dead loads, snow loads, wind load and seismic design, shall be provided.
Action required: Revise design criteria on S101, and engineer's report if applicable, to show correct snow load which is 20 psf.
3/16/23 - Noted as not relevant due to project being interior, but roof loading has been altered due to new roof top mounted hvac.
|
|
IBC 1009.1 Accessible means of egress required
2018 IBC 1009.1 Accessible means of egress required. Accessible means of egress shall comply with this section. Accessible spaces shall be provided with not less than one accessible means of egress. Where more than one means of egress are required by Section 1006.2 or 1006.3 from any accessible space, each accessible portion of the space shall be served by not less than two accessible means of egress.
Action required: Provide more information as to how Deli T101 is to be used if it is your intention to route egress through there. (egress through kitchens or similar would not be allowed)
3/16/23 - addressed in letter
|
|
Planning - Screening of rooftop equipment
Unified Development Ordinance Article 8, Section 8.180.E
Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director.
Action required: Screen new rooftop equipment or provide verification that existing parapets are sufficient.
Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (any questions about screening need to be directed to our Planning staff at 816.969.1600)
3/16/23 - Letter references general note on M201 which is not found. general notes on M101 also do not reference screening.
|
|
Misc
Submit engineered plans for fire suppression piping to be ran into building.
|
|
|
Licensed Contractors
|
Rejected
|
03/21/2023
|
03/16/2023
|
|
Joe Frogge
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
3/16/23 - acknowledged in letter
|
|
|
Health Department Review
|
Approved
|
|
03/16/2023
|
|
Joe Frogge
|
|
|
Health Department Review
|
Rejected
|
|
03/16/2023
|
|
Joe Frogge
|
|
|
Fire Plan Review
|
Approved with Conditions
|
03/07/2023
|
03/08/2023
|
|
Jim Eden
|
|
Miscellaneous Correction
Corrective Action Required
The location of the FDC has moved to the southwest corner of the building. Relocate the Knox box to the same location 6' AFF. Also coordinate with the alarm contractor to move the exterior horn/strobe.
The FDC shall be marked to indicate the addresses served. Verified at inspection.
|
|
Construction documents - Fire protection systems
Corrective Action Required
2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation.
Provide shop drawings for modifications to the sprinkler system to provide coverage under the bar canopy and in the cooler.
|
|
Miscellaneous Correction
Corrective Action Required
|
|
Misc
Corrective Action Required
The door to the sprinkler and fire alarm room shall be marked.
|
|
Address numbers required
Corrective Action Required
2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm).
Action required-The doors to the individual tenants shall be posted with the address and unit number.
|
|
Construction documents for fire alarm systems
Corrective Action Required
2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions.
Action required- Provide shop drawings for alarm notification appliances.
|
|
|
Building Plan Review
|
Rejected
|
03/07/2023
|
03/07/2023
|
|
Joe Frogge
|
|
Health Dept Review
Corrective Action Required
For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit.
Action required: Comment is informational.
|
|
Health Dept Inspection
Corrective Action Required
For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit.
Action required: Comment is informational.
|
|
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions)
Actions required: Code Modification Request (CMR) required if your intention is to use 2021 IBC/IPC for shared gender restrooms.
|
|
IPC 403.1 Minimum number of fixtures
Corrective Action Required
2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code.
Action required: Revise Plumbing Fixture Requirements schedule on G003 to show correct calculations which will be for Bar/Tavern, not Restaurant.
|
|
Design loads
Corrective Action Required
The design loads, including live loads, dead loads, snow loads, wind load and seismic design, shall be provided.
Action required: Revise design criteria on S101, and engineer's report if applicable, to show correct snow load which is 20 psf.
|
|
IBC 1009.1 Accessible means of egress required
Corrective Action Required
2018 IBC 1009.1 Accessible means of egress required. Accessible means of egress shall comply with this section. Accessible spaces shall be provided with not less than one accessible means of egress. Where more than one means of egress are required by Section 1006.2 or 1006.3 from any accessible space, each accessible portion of the space shall be served by not less than two accessible means of egress.
Action required: Provide more information as to how Deli T101 is to be used if it is your intention to route egress through there. (egress through kitchens or similar would not be allowed)
|
|
Planning - Screening of rooftop equipment
Corrective Action Required
Unified Development Ordinance Article 8, Section 8.180.E
Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director.
Action required: Screen new rooftop equipment or provide verification that existing parapets are sufficient.
Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (any questions about screening need to be directed to our Planning staff at 816.969.1600)
|
|
Misc
Corrective Action Required
Submit engineered plans for fire suppression piping to be ran into building.
|
|
|
Licensed Contractors
|
Rejected
|
03/07/2023
|
03/06/2023
|
|
Joe Frogge
|
|
LC - MEP Subs
Corrective Action Required
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|