Permit Application Status

PRCOM20230780


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20230780
Building Permit - Commercial
Certificate of Occupancy
230 MAIN INVESTORS LLC
CHANGE OF TENANT
CRAFT BEER/COCKTAIL BAR, FUTURE FOOD SERVICE AND PATIO SPACE
02/23/2023
04/19/2023
09/18/2023
09/15/2023
Locations
Contacts
JWM CONTRACTING LLC, Address:420 NE BROCKTON DR, Phone:(913) 530-4205  
COLLINS WEBB ARCHITECTURE LLC, Address:307 SW MARKET ST, Unit B, Phone:(816) 249-2270  
Jeff Munden, Address:jeff@jwmcontracting@gmail.com, Phone:(913) 530-4205  
AIR CARE HEATING & COOLING, Address:10332 W 79TH ST, Phone:(913) 362-5274  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
PRODIGY PLUMBING & MECHANICAL INC, Address:8402 WESTRIDGE RD, Phone:(816) 984-9292  
230 MAIN INVESTORS LLC, Address:7200 W 132ND ST STE 150  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 09/12/2023 09/01/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
09/01/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. 8/31/2023-Revised plans received. Provide equipment specifications.
Installation acceptance testing
Corrective Action Required
09/01/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule alarm test.
Miscellaneous Correction
Corrective Action Required
09/01/2023

The exterior horn/strobe for the sprinkler system is shown in the wrong location.The FDC is on the south side of the building. Confirm the horn/strobe is properly located.
Alarm Plan Review Rejected 09/12/2023 09/01/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
09/01/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. 8/29/2023 The plans provided do not match existing conditions or provide coverage per NFPA 72.
Miscellaneous Correction
Corrective Action Required
08/29/2023

The plans provided do not match existing conditions.
Alarm Plan Review Rejected 09/11/2023 08/29/2023
Jim Eden
Alarm Plan Review Rejected 03/07/2023 08/29/2023
Jim Eden
Construction documents for fire alarm systems
Corrective Action Required
08/29/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Provide contractor shop drawings. Details on the notification appliances, and provide coverage to the complete space.
Miscellaneous Correction
Corrective Action Required
08/29/2023

The drawings do not reflect existing conditions or provide adequate notification per NFPA 72. Revise and resubmit shop drawings.
Sprinkler Plan Review Released for Construction 07/26/2023 07/17/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
07/17/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Stamped modification plans received.
Installation acceptance testing
Corrective Action Required
07/17/2023

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. A visual inspection will be made at the occupancy inspection.
Fire Plan Review Approved with Conditions 05/18/2023 05/21/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
05/11/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for modifications to the sprinkler system to provide coverage under the bar canopy and in the cooler.
Construction documents for fire alarm systems
Corrective Action Required
05/11/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for alarm notification appliances.
Building Plan Review Approved with Conditions 05/18/2023 05/16/2023
Joe Frogge
Health Dept Inspection
Corrective Action Required
05/11/2023

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 3/16/23 - acknowledged in letter
Licensed Contractors Approved 04/03/2023 04/19/2023
Joe Frogge
LC - MEP Subs
Resolved
04/19/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/16/23 - acknowledged in letter
Building Plan Review Approved with Conditions 04/03/2023 04/17/2023
Joe Frogge
Health Dept Inspection
Corrective Action Required
03/27/2023

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 3/16/23 - acknowledged in letter
IBC 2902.2 Separate facilities - fixture
Resolved
04/17/2023

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Actions required: Code Modification Request (CMR) required if your intention is to use 2021 IBC/IPC for shared gender restrooms. 3/16/23 - Pending review of CMR
IPC 403.1 Minimum number of fixtures
Resolved
03/31/2023

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Revise Plumbing Fixture Requirements schedule on G003 to show correct calculations which will be for Bar/Tavern, not Restaurant. 3/16/23 - Per ITAP website this is a beer hall where patrons are allowed to bring food which is not the same as a restaurant. Water Closet calcs need to be 1:40.
Design loads
Resolved
03/31/2023

The design loads, including live loads, dead loads, snow loads, wind load and seismic design, shall be provided. Action required: Revise design criteria on S101, and engineer's report if applicable, to show correct snow load which is 20 psf. 3/16/23 - Noted as not relevant due to project being interior, but roof loading has been altered due to new roof top mounted hvac.
Fire Plan Review Approved with Conditions 04/03/2023 04/02/2023
Jim Eden
Construction documents - Fire protection systems
Corrective Action Required
03/27/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for modifications to the sprinkler system to provide coverage under the bar canopy and in the cooler.
Miscellaneous Correction
Resolved
04/02/2023

If the door to the Deli is to be used as an accessible means of egress, provide exit signage over the door to the deli from the party room space. Also provivide signage at the passageway from the Bar/Dining area to the party room.
Construction documents for fire alarm systems
Corrective Action Required
04/02/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for alarm notification appliances.
Fire Plan Review Approved with Conditions 03/21/2023 03/22/2023
Jim Eden
Miscellaneous Correction
Resolved
03/22/2023

The location of the FDC has moved to the southwest corner of the building. Relocate the Knox box to the same location 6' AFF. Also coordinate with the alarm contractor to move the exterior horn/strobe. The FDC shall be marked to indicate the addresses served. Verified at inspection.
Construction documents - Fire protection systems
Corrective Action Required
03/14/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for modifications to the sprinkler system to provide coverage under the bar canopy and in the cooler.
Miscellaneous Correction
Corrective Action Required
03/22/2023

If the door to the Deli is to be used as an accessible means of egress, provide exit signage over the door to the deli from the party room space. Also provivide signage at the passageway from the Bar/Dining area to the party room.
Misc
Resolved
03/22/2023

The door to the sprinkler and fire alarm room shall be marked.
Address numbers required
Resolved
03/22/2023

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required-The doors to the individual tenants shall be posted with the address and unit number.
Construction documents for fire alarm systems
Corrective Action Required
03/14/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for alarm notification appliances.
Building Plan Review Rejected 03/21/2023 03/16/2023
Joe Frogge
Health Dept Review
Resolved
03/16/2023

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection
Corrective Action Required
03/14/2023

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational. 3/16/23 - acknowledged in letter
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
03/14/2023

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Actions required: Code Modification Request (CMR) required if your intention is to use 2021 IBC/IPC for shared gender restrooms. 3/16/23 - Pending review of CMR
IPC 403.1 Minimum number of fixtures
Corrective Action Required
03/14/2023

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Revise Plumbing Fixture Requirements schedule on G003 to show correct calculations which will be for Bar/Tavern, not Restaurant. 3/16/23 - Per ITAP website this is a beer hall where patrons are allowed to bring food which is not the same as a restaurant. Water Closet calcs need to be 1:40.
Design loads
Corrective Action Required
03/14/2023

The design loads, including live loads, dead loads, snow loads, wind load and seismic design, shall be provided. Action required: Revise design criteria on S101, and engineer's report if applicable, to show correct snow load which is 20 psf. 3/16/23 - Noted as not relevant due to project being interior, but roof loading has been altered due to new roof top mounted hvac.
IBC 1009.1 Accessible means of egress required
Resolved
03/16/2023

2018 IBC 1009.1 Accessible means of egress required. Accessible means of egress shall comply with this section. Accessible spaces shall be provided with not less than one accessible means of egress. Where more than one means of egress are required by Section 1006.2 or 1006.3 from any accessible space, each accessible portion of the space shall be served by not less than two accessible means of egress. Action required: Provide more information as to how Deli T101 is to be used if it is your intention to route egress through there. (egress through kitchens or similar would not be allowed) 3/16/23 - addressed in letter
Planning - Screening of rooftop equipment
Resolved
03/22/2023

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Screen new rooftop equipment or provide verification that existing parapets are sufficient. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (any questions about screening need to be directed to our Planning staff at 816.969.1600) 3/16/23 - Letter references general note on M201 which is not found. general notes on M101 also do not reference screening.
Misc
Resolved
03/16/2023

Submit engineered plans for fire suppression piping to be ran into building.
Licensed Contractors Rejected 03/21/2023 03/16/2023
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/14/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 3/16/23 - acknowledged in letter
Health Department Review Approved 03/16/2023
Joe Frogge
Health Department Review Rejected 03/16/2023
Joe Frogge
Fire Plan Review Approved with Conditions 03/07/2023 03/08/2023
Jim Eden
Miscellaneous Correction
Corrective Action Required
03/08/2023

The location of the FDC has moved to the southwest corner of the building. Relocate the Knox box to the same location 6' AFF. Also coordinate with the alarm contractor to move the exterior horn/strobe. The FDC shall be marked to indicate the addresses served. Verified at inspection.
Construction documents - Fire protection systems
Corrective Action Required
03/08/2023

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Provide shop drawings for modifications to the sprinkler system to provide coverage under the bar canopy and in the cooler.
Miscellaneous Correction
Corrective Action Required
03/08/2023

Misc
Corrective Action Required
03/08/2023

The door to the sprinkler and fire alarm room shall be marked.
Address numbers required
Corrective Action Required
03/08/2023

2018 IFC 505.1- Address numbers. New and existing buildings shall have approved address numbers, building numbers or approved building identification placed in a position that is plainly legible and visible from the street or road fronting the property. These numbers shall contrast with their background. In Multi-tenant commercial building where tenants have multiple entrances located on different sides of the building , each door shall be addressed. Address numbers shall be Arabic numerals or alphabet letters. Numbers shall be a minimum of 4 inches (102 mm) high with a minimum stroke width of 0.5 inch (12.7 mm). Action required-The doors to the individual tenants shall be posted with the address and unit number.
Construction documents for fire alarm systems
Corrective Action Required
03/08/2023

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action required- Provide shop drawings for alarm notification appliances.
Building Plan Review Rejected 03/07/2023 03/07/2023
Joe Frogge
Health Dept Review
Corrective Action Required
03/07/2023

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is informational.
Health Dept Inspection
Corrective Action Required
03/07/2023

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is informational.
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
03/07/2023

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Actions required: Code Modification Request (CMR) required if your intention is to use 2021 IBC/IPC for shared gender restrooms.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
03/07/2023

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Revise Plumbing Fixture Requirements schedule on G003 to show correct calculations which will be for Bar/Tavern, not Restaurant.
Design loads
Corrective Action Required
03/07/2023

The design loads, including live loads, dead loads, snow loads, wind load and seismic design, shall be provided. Action required: Revise design criteria on S101, and engineer's report if applicable, to show correct snow load which is 20 psf.
IBC 1009.1 Accessible means of egress required
Corrective Action Required
03/07/2023

2018 IBC 1009.1 Accessible means of egress required. Accessible means of egress shall comply with this section. Accessible spaces shall be provided with not less than one accessible means of egress. Where more than one means of egress are required by Section 1006.2 or 1006.3 from any accessible space, each accessible portion of the space shall be served by not less than two accessible means of egress. Action required: Provide more information as to how Deli T101 is to be used if it is your intention to route egress through there. (egress through kitchens or similar would not be allowed)
Planning - Screening of rooftop equipment
Corrective Action Required
03/07/2023

Unified Development Ordinance Article 8, Section 8.180.E Roof mounted equipment – All roof-mounted equipment shall be screened entirely from view by using parapet walls at the same height as the mechanical units. For additions to existing buildings that do not meet this standard, individual screens will be permitted, with the design subject to approval by the Director. Action required: Screen new rooftop equipment or provide verification that existing parapets are sufficient. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (any questions about screening need to be directed to our Planning staff at 816.969.1600)
Misc
Corrective Action Required
03/09/2023

Submit engineered plans for fire suppression piping to be ran into building.
Licensed Contractors Rejected 03/07/2023 03/06/2023
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/06/2023

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $2,000.00 $2,000.00 Paid 04/19/2023
$26,895.00
7232302-Commercial License Tax Fee $35,120.25 $35,120.25 Paid 09/15/2023
$13,447.50
9110080-Not Ready Inspection Fee $75.00 $75.00 Paid 09/07/2023
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Underslab Plumbing Inspection - Commercial Failed 5/15/2023 5/15/2023 05/15/2023
Misc
Corrective Action Required
05/15/2023
Support all dwv
Underslab Plumbing Inspection - Commercial Passed 5/18/2023 5/18/2023 05/18/2023
Misc
Resolved
05/18/2023
Support all dwv
Underslab Electrical Inspection - Commercial Passed 5/22/2023 5/22/2023 05/22/2023
In-wall Inspection Partial 6/28/2023 6/28/2023 06/28/2023
Misc
Corrective Action Required
06/28/2023
Ok to patch fire wall
In-wall Inspection Partial 7/6/2023 7/6/2023 07/06/2023
Misc
Corrective Action Required
06/28/2023
Ok to patch fire wall Ok to one side all areas, bathroom nad bar knee wall ok to cover -COMPLETE ALL PLUMBING IN WALL
In-wall Inspection Not Ready 7/7/2023 7/7/2023 07/07/2023
Misc
Corrective Action Required
07/06/2023
Ok to patch fire wall Ok to one side all areas, bathroom nad bar knee wall ok to cover 7/7/23 COMPLETE ALL IN WALL PLUMBING -Complete supply lines in wall -Ensure all vents have proper slope -Complete supply to mop sink and hot water heater -Secure all vertical piping 2" and smaller to prevent movement perpendicular to axis of pipe **3RD INSPECTION. NOT READY FEE ASSESSED
In-wall Inspection Passed 7/11/2023 7/11/2023 07/11/2023
Misc
Resolved
07/11/2023
Ok to patch fire wall Ok to one side all areas, bathroom nad bar knee wall ok to cover 7/7/23 COMPLETE ALL IN WALL PLUMBING -Complete supply lines in wall -Ensure all vents have proper slope -Complete supply to mop sink and hot water heater -Secure all vertical piping 2" and smaller to prevent movement perpendicular to axis of pipe **3RD INSPECTION. NOT READY FEE ASSESSED
Gas Service Inspection - Commercial Passed 8/21/2023 08/21/2023
Alarm Test Passed 09/05/2023
Occupancy Inspection - Codes Commercial Failed 9/7/2023 9/7/2023 09/07/2023
Misc
Corrective Action Required
09/07/2023
Provide Health dept approval. Fire ok for TCO pending codes. Label mechanical room door" Electrical room" Post address over rear west entry and over southwest entry( pizza door side). Provide combustion air size and requirements for mechanical room.
Occupancy Inspection - Fire Temporary C of O 9/7/2023 9/7/2023 09/07/2023
Occupancy Inspection - Codes Commercial Failed 9/11/2023 9/11/2023 09/11/2023
Misc
Corrective Action Required
09/07/2023
Provide Health dept approval-UPLOAD DOCUMENT TO PORTAL -All fees must be paid before occupancy
Above Ceiling Inspection Passed 09/11/2023
Occupancy Inspection - Codes Commercial Full C of O 9/15/2023 09/15/2023
Misc
Resolved
09/15/2023
Provide Health dept approval-UPLOAD DOCUMENT TO PORTAL -All fees must be paid before occupancy
Documents & Images
Date Uploaded File Type Document Name
02/23/2023 Application Form APPLICATION
02/27/2023 Plans 22066_iTAP_Permitting Set_230227
02/27/2023 Engineer Report/Study ITAP Structural Calculations - sealed
02/27/2023 Letter License Tax Bill
03/09/2023 Letter DS P/R Corrections Document
03/14/2023 Letter 22066_iTAP City Comment Responses_230314
03/14/2023 Plans 22066_iTAP_Permitting Set_230314_RESUBMITTAL
03/16/2023 Letter jxn cty approval
03/16/2023 Email LT interpret
03/22/2023 Letter DS P/R Corrections Document
03/22/2023 Email screening note from planning
03/24/2023 Letter 22066_iTAP Comment Responses_230322
03/24/2023 Plans 230324_REVISED SHEETS_City Comments Delta 2_Reduced File
04/04/2023 Approved Plans approved - 22066_iTAP_Permitting Set_230314_RESUBMITTAL
04/17/2023 Code Mod Request Code Modification Request COMMERCIAL - SIGNED
04/18/2023 Receipt Receipt for transaction: 2023-002163
04/19/2023 Receipt Receipt for transaction: 2023-002238
04/19/2023 Letter DS Building Permit
05/11/2023 Letter 230410_iTAP Landlord Revisions_Narrative Response_ASI
05/11/2023 Plans 230511_ITAP_Bank Building LS_PERMIT SET_Including Delta 3 Landlord Revisions
05/11/2023 Letter iTAP - Lee's Summit, MO (Landlord Comment Response Narrative)
05/11/2023 Letter STRUCTURAL NARRATIVE Tentant Review
05/15/2023 Letter INSPECTION SUMMARY
05/18/2023 Letter INSPECTION SUMMARY
05/22/2023 Letter INSPECTION SUMMARY
05/24/2023 Approved Plans approved - 230511_ITAP_Bank Building LS_PERMIT SET_Including Delta 3 Landlord Revisions
06/05/2023 Drawing M201 MECHANICAL PLAN
06/08/2023 Approved Plans approved - M201 MECHANICAL PLAN
06/28/2023 Letter INSPECTION SUMMARY
07/06/2023 Letter INSPECTION SUMMARY
07/07/2023 Letter INSPECTION SUMMARY
07/11/2023 Letter INSPECTION SUMMARY
07/12/2023 DCP19041-141 iTap FP Submittal
07/17/2023 Letter Fire (Sprinkler) Plan Review
08/21/2023 Letter INSPECTION SUMMARY
08/28/2023 FA1- Johnny jos
08/28/2023 FA1- ITAP
08/29/2023 Letter Fire (Alarm) Plan Review Notice
08/29/2023 FA1
09/01/2023 Letter Fire (Alarm) Plan Review Notice
09/07/2023 Letter INSPECTION SUMMARY
09/07/2023 Receipt Receipt for transaction: 2023-006871
09/11/2023 ITAP- Health Inspection Report 9-8-2023
09/11/2023 Letter INSPECTION SUMMARY
09/11/2023 Letter INSPECTION SUMMARY
09/15/2023 Receipt Receipt for transaction: 2023-007081
09/15/2023 Letter Codes Final Certificate of Occupancy
09/15/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home