| Review Type |
Outcome |
Est. Completion Date |
Completed |
|
Fire Plan Review
|
Approved
|
10/26/2022
|
12/02/2022
|
|
|
Joe Frogge
|
|
|
Misc
All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit.
Action Required: Show correct codes, code analysis to include occupancy load
12/2/22 - approved by T Deister based on State regulations
|
|
|
|
|
Building Plan Review
|
Approved
|
10/26/2022
|
12/02/2022
|
|
|
Joe Frogge
|
|
|
Gen - Plan submittals 2018 codes
All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit.
Action required: Update code year adoption date references.
10/19/22 - still incorrect
12/2/22 - approved by T Deister based on State regulations
|
|
|
Code analysis required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Provide complete code analysis that addresses exemption used to justify press box and roof top viewing not being on accessible route.
10/19/22 - not found
12/2/22 - approved by T Deister based on State regulations
|
|
|
Misc
Unable to locate method of access to rooftop viewing platform.
Action required: Clarify. Also address exiting scenario. Is an exception being used? I can't find one.
10/19/22 - excemption not found
|
|
|
Final Development Plan
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is informational.
10/19/22 - not addressed
|
|
|
Project cost
The project cost, which is used to establish the permit fee, has not been provided.
Action required: Comment is informational.
10/19/22 - not addressed
|
|
|
|
|
Final Development Plan Review
|
Approved
|
11/15/2022
|
11/15/2022
|
|
|
Mike Weisenborn
|
|
|
PARAGON BLEACHERS
|
|
Licensed Contractors
|
Approved
|
10/26/2022
|
10/20/2022
|
|
|
Joe Frogge
|
|
|
LC - MEP Subs
Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt)
No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section.
Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
|
|
|
|
|
Fire Plan Review
|
Rejected
|
08/31/2022
|
09/01/2022
|
|
|
Ben Hicks
|
|
|
Misc
Corrective Action Required
All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit.
|
|
|
|
|
Building Plan Review
|
Rejected
|
08/31/2022
|
08/31/2022
|
|
|
Joe Frogge
|
|
|
Gen - Plan submittals 2018 codes
Corrective Action Required
All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2009 as amended and adopted by the City of Lee’s Summit.
Action required: Update code year adoption date references.
|
|
|
Code analysis required
Corrective Action Required
A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed.
Action required: Provide complete code analysis that addresses exemption used to justify press box and roof top viewing not being on accessible route.
|
|
|
Misc
Corrective Action Required
Unable to locate method of access to rooftop viewing platform.
Action required: Clarify. Also address exiting scenario. Is an exception being used? I can't find one.
|
|
|
Final Development Plan
Corrective Action Required
The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan.
Action required: Comment is informational.
|
|
|
Project cost
Corrective Action Required
The project cost, which is used to establish the permit fee, has not been provided.
Action required: Comment is informational.
|
|
|
|
|
Licensed Contractors
|
Approved
|
|
08/19/2022
|
|
|
Joe Frogge
|
|
|
|