Permit Application Status

PRCOM20222560


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20222560
Building Permit - Commercial
Certificate of Occupancy
MSE PROPERTY HOLDINGS GROUP, LLC
ALTERATION COMMERCIAL
Replacement of an automotive paint booth with a new booth and an additional paint booth and mixing room EXISTING BUILDING
06/09/2022
07/19/2022
01/03/2023
02/10/2023
Locations
Contacts
AUTOMOTIVE TECHNOLOGY INC, Address:544 Mae Ct  
MSE PROPERTY HOLDINGS GROUP, LLC, Address:14330 S CICERO AVE  
Doug Slattery, Address:544 Mae Ct, Phone:(636) 343-8101  
TEAGUE ELECTRIC CONSTRUCTION INC, Address:12425 W 92ND ST, Phone:(913) 529-4600  
Doug Slattery, Address:Doug@AutomotiveTechnology.com, Phone:(816) 524-2133  
THE WALDINGER CORPORATION, Address:1800 LEVEE ROAD, Phone:(515) 323-8786  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Plan Review Approved 07/14/2022 07/13/2022
Jim Eden
Installation acceptance testing
Informational
07/07/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule a test.
Portable fire extinguishers - general
Informational
07/07/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide fire extinguishers of appropriate size in correct locations.
Miscellaneous Correction
Resolved
07/13/2022

How will fire suppression be provided to the paint booth? Action required- Provide plans and specification sheets for review and approval.
Building Plan Review Approved 07/14/2022 07/07/2022
Joe Frogge
Licensed Contractors Approved 07/07/2022 07/07/2022
Joe Frogge
Fire Plan Review Rejected 07/05/2022 07/06/2022
Jim Eden
Installation acceptance testing
Informational
07/06/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. Call (816) 969-1300 to schedule a test.
Portable fire extinguishers - general
Informational
07/06/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide fire extinguishers of appropriate size in correct locations.
Miscellaneous Correction
Corrective Action Required
06/27/2022

How will fire suppression be provided to the paint booth? Action required- Provide plans and specification sheets for review and approval. 07/06/2022- Still awaiting fire suppression plans.
Misc
Resolved
07/06/2022

2404.3.3.5 Clear space. Spray booths shall be installed so that all parts of the booth are able to be accessed forbcleaning. A clear space of not less than 3 feet (914 mm) shall be maintained on all sides of the spray booth. This clear space shall be kept free of any storage or combustible construction. Exceptions: 1. This requirement shall not prohibit locating a spray booth closer than 3 feet (914 mm) to or directly against an interior partition, wall or floor/ceiling assembly that has a fire-resistance rating of not less than 1 hour, provided that the spray booth can be adequately maintained and cleaned. 2. This requirement shall not prohibit locating a spray booth closer than 3 feet (914 mm) to an exterior wall or a roof assembly, provided that the wall or roof is constructed of noncombustible material and the spray booth can be adequately maintained and cleaned. Action required- How will this be met?
Licensed Contractors Approved 07/05/2022 06/27/2022
Joe Frogge
Building Plan Review Approved 07/05/2022 06/27/2022
Joe Frogge
Fire Plan Review Rejected 06/21/2022 06/21/2022
Jim Eden
Installation acceptance testing
Corrective Action Required
06/21/2022

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test.
Portable fire extinguishers - general
Corrective Action Required
06/21/2022

2018 IFC 906.2- General requirements. Portable fire extinguishers shall be selected, installed and maintained in accordance with this section and NFPA 10. Action required- Provide fire extinguishers of appropriate size in correct locations.
Miscellaneous Correction
Corrective Action Required
06/21/2022

How will fire suppression be provided to the paint booth? Action required- Provide plans and specification sheets for review and approval.
Misc
Corrective Action Required
06/21/2022

2404.3.3.5 Clear space. Spray booths shall be installed so that all parts of the booth are able to be accessed forbcleaning. A clear space of not less than 3 feet (914 mm) shall be maintained on all sides of the spray booth. This clear space shall be kept free of any storage or combustible construction. Exceptions: 1. This requirement shall not prohibit locating a spray booth closer than 3 feet (914 mm) to or directly against an interior partition, wall or floor/ceiling assembly that has a fire-resistance rating of not less than 1 hour, provided that the spray booth can be adequately maintained and cleaned. 2. This requirement shall not prohibit locating a spray booth closer than 3 feet (914 mm) to an exterior wall or a roof assembly, provided that the wall or roof is constructed of noncombustible material and the spray booth can be adequately maintained and cleaned. Action required- How will this be met?
Building Plan Review Approved 06/21/2022 06/17/2022
Joe Frogge
Licensed Contractors Approved 06/21/2022 06/10/2022
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $1,460.00 $1,460.00 Paid 07/15/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Alternate Protection Systems Inspection Passed 8/10/2022 08/10/2022
Occupancy Inspection - Codes Commercial Failed 8/10/2022 8/10/2022 08/10/2022
Miscellaneous Correction
Corrective Action Required
08/10/2022
-Perform gas pressure test inspection -Paint all exterior gas lines with corrosion restraint paint -Move unused panels from doorway
Gas Service Inspection - Commercial Failed 8/12/2022 08/12/2022
G406.4.1 Test pressure
Corrective Action Required
08/12/2022
INSPECTION, TESTING AND PURGING. AMENDED 7-608. The test pressure to be used shall be not less than one and one-half times the proposed maximum working pressure, but not less than 10 psig (68.9 kPa) irrespective of design pressure. For welded piping, and for piping carrying gas at pressures in excess of fourteen (14) inches water column pressure, the test pressure shall not be less than 60 psig. Where the test pressure exceeds 125 psig (862 kPa), the test pressure shall not exceed a value that produces a hoop stress in the piping greater than 50 percent of the specified minimum yield strength of the pipe. ****8/12/22 10:00 AM -PRESSURE ONLY AT 5 PSI
Occupancy Inspection - Codes Commercial Failed 08/15/2022
Miscellaneous Correction
Corrective Action Required
08/10/2022
**OK TO USE NORTH PAINT BOOTH -Paint all exterior gas lines with corrosion restraint paint -Complete second booth and mixing booth
Gas Service Inspection - Commercial Partial 8/15/2022 8/15/2022 08/15/2022
G406.4.1 Test pressure
Corrective Action Required
08/12/2022
-New gas line to North paint booth pressure test ok
Gas Service Inspection - Commercial Passed 1/30/2023 1/30/2023 01/30/2023
G406.4.1 Test pressure
Corrective Action Required
08/15/2022
-New gas line to North paint booth pressure test ok -New line to South booth pressure test ok
Gas Piping Inspection - Commercial Partial 01/30/2023
Misc
Informational
01/30/2023
-New gas line to North paint booth pressure test ok -New line to South booth pressure test ok
Alternate Protection Systems Inspection Passed 2/7/2023 02/07/2023
Informational
02/07/2023
Ansul fire protection system in paint booth and mixer room passed
Gas Piping Inspection - Commercial Passed 02/08/2023
Misc
Informational
01/30/2023
-New gas line to North paint booth pressure test ok -New line to South booth pressure test ok
Occupancy Inspection - Codes Commercial Failed 2/8/2023 2/8/2023 02/08/2023
Miscellaneous Correction
Corrective Action Required
08/15/2022
-Provide address at street side of building -Paint all exterior gas lines with corrosion restraint paint -Label panels -Provide panel schedules -Remove equipment in front of panels
Occupancy Inspection - Codes Commercial Full C of O 2/10/2023 2/10/2023 02/10/2023
Miscellaneous Correction
Resolved
02/10/2023
-Provide address at street side of building -Paint all exterior gas lines with corrosion restraint paint -Label panels -Provide panel schedules -Remove equipment in front of panels
Documents & Images
Date Uploaded File Type Document Name
06/09/2022 Drawing atimo01-m5r0-Model
06/09/2022 Drawing atimo01-m4r0-Model
06/09/2022 Drawing atimo01-m1r0-Model
06/09/2022 Drawing atimo01-m2r0-Model
06/09/2022 Drawing atimo01-m3r0-Model
06/09/2022 Plans Lee's Summit U132448 Stamped Drawings
06/09/2022 Engineer Report/Study CC_Lee's_Summit_Permit_Package_complete 1
06/10/2022 Application Form permit application 061022
06/22/2022 Letter DS P/R Corrections Document
06/27/2022 Letter Review Responses 062722
07/07/2022 Letter DS P/R Corrections Document
07/07/2022 Plans CrashChampionsLeesSummitFireSuppressionDraw
07/07/2022 Specifications CrashChampionsMaterialsNotes
07/15/2022 Plans Crash Champions paint booths merged file
07/15/2022 Approved Plans approved - Crash Champions paint booths merged file
07/15/2022 Receipt Receipt for transaction:2022-005769
07/19/2022 Letter DS Building Permit
08/10/2022 Letter INSPECTION SUMMARY
08/12/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
01/30/2023 Letter INSPECTION SUMMARY
01/30/2023 Letter INSPECTION SUMMARY
02/07/2023 Letter Fire Loss Reduction Form
02/08/2023 Letter INSPECTION SUMMARY
02/08/2023 Letter Fire Loss Reduction Form
02/08/2023 Letter INSPECTION SUMMARY
02/10/2023 Letter Codes Final Certificate of Occupancy
02/10/2023 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home