Permit Application Status

PRCOM20221121


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20221121
Building Permit - Commercial
Certificate of Occupancy
HALLAM JAMES B & JOLENE I TRUSTEES
NEW TENANT FINISH
TENANT FINISH FOR SALE OF SUPPLEMENTS
03/24/2022
04/12/2022
10/03/2022
08/17/2022
Locations
Contacts
DIAMOND CONTRACTORS INC, Address:4224 NE PORT DR, Phone:(816) 650-9200  
brooke perry, Address:brookeperry@diamondcontractors.com, Phone:(816) 550-4291  
UNITED HEATING & COOLING, Address:301 DUCK RD, Phone:(816) 761-5262  
AD'S TEAM ELECTRIC LLC, Address:9407 FAIRWOOD, Phone:(816) 226-7019  
Lee Rhoad, Address:leerhoad@gmail.com, Phone:(816) 244-6588  
HALLAM JAMES B & JOLENE I TRUSTEES, Address:3996 SE DOC HENRY RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved 04/18/2022 04/11/2022
Joe Frogge
IMC 403.2 Outdoor air required
Resolved
04/11/2022

2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. (see code for exception) Action required: Revise drawings to show outside air calculations as well as method of delivery. Action required: Provide outdoor air calculations and method of delivery. 4/5/22 - Method of delivery not found in design.
Miscellaneous Correction
Resolved
04/11/2022

HVAC design completion in question. Duct sizes incomplete. Return air looks inadequate. What is purpose of drywall chase and how is it constructed? Where is condensing unit? How is condensing unit screened from view? Action required: Modify design to comply. 4/5/22 - condensing unit information not found in design
Licensed Contractors Approved 04/11/2022 04/11/2022
Joe Frogge
Fire Plan Review Approved 04/18/2022 04/11/2022
Joe Frogge
Fire Plan Review Approved 04/07/2022 04/06/2022
Joe Frogge
Licensed Contractors Approved 04/07/2022 04/05/2022
Joe Frogge
LC - General Contractor
Resolved
03/31/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Resolved
04/05/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Rejected 04/07/2022 04/05/2022
Joe Frogge
Health Dept Review
Resolved
04/04/2022

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Resolved
04/04/2022

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
ICC A117.1 904.3 Sales and Service Counters
Resolved
04/05/2022

2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. ____________________________________________ ICC A117.1 Section 904.3 Sales and service counters and windows. Sales and service counters and windows shall comply with Section 904.3.1 and either 904.3.2 or 904.3.3. Where counters are provided, the accessible portion of the countertop shall extend the same depth as the public portion of the sales and service countertop provided for standing customers. (see code for exception) 904.3.1 Vertical barriers. At service windows or service counters, any vertical barrier between service personnel and customers shall be at a height of 43 inches maximum above the floor. (see code for exception regarding security glazing) 904.3.2 Parallel Approach. A portion of the public use side of the counter surface 36 inches minimum in length and 26 inches minimum and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a parallel approach adjacent to the accessible counter shall be provided. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12 inches minimum. (see code for exception) 904.3.3 Forward Approach. A portion of the public use side of the counter surface 30 inches minimum in length and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a forward approach to the accessible counter shall be provided. Knee and toe clearance complying with Section 306 shall be provided under the accessible counter. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12” minimum. Action required: Modify design to demonstrate compliance at check out counter.
IBC 2902.2 Separate facilities - fixture
Resolved
04/05/2022

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Given that occupant load exceeds 25 an additional restroom is required. (that being said you have the option to calculate the occupant load space by space in lieu of gross - You may be able to reduce to less than 25 - provide calculations for verification)
IPC 403.1 Minimum number of fixtures
Resolved
04/05/2022

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink.
IBC 1209.2 Finish materials
Resolved
04/05/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Provide finish material schedule to demonstrate compliance at water closet and mop sink. If paint is used it must be epoxy based.
IMC 403.2 Outdoor air required
Corrective Action Required
03/31/2022

2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. (see code for exception) Action required: Revise drawings to show outside air calculations as well as method of delivery. Action required: Provide outdoor air calculations and method of delivery. 4/5/22 - Method of delivery not found in design.
Miscellaneous Correction
Corrective Action Required
03/31/2022

HVAC design completion in question. Duct sizes incomplete. Return air looks inadequate. What is purpose of drywall chase and how is it constructed? Where is condensing unit? How is condensing unit screened from view? Action required: Modify design to comply. 4/5/22 - condensing unit information not found in design
NEC Article 210.8 (B) Other than dwelling units GFCI
Resolved
04/05/2022

2017 NEC Article 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (10) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas other than vehicle exhibition halls and showrooms. (9) Crawl spaces – at or below grade level. (10) Unfinished portions or areas of the basement not intended as habitable rooms. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected.
Fire Plan Review Approved 04/06/2022 03/30/2022
Jim Eden
Building Plan Review Rejected 04/06/2022 03/29/2022
Joe Frogge
Health Dept Review
Corrective Action Required
03/28/2022

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
03/28/2022

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
ICC A117.1 904.3 Sales and Service Counters
Corrective Action Required
03/28/2022

2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. ____________________________________________ ICC A117.1 Section 904.3 Sales and service counters and windows. Sales and service counters and windows shall comply with Section 904.3.1 and either 904.3.2 or 904.3.3. Where counters are provided, the accessible portion of the countertop shall extend the same depth as the public portion of the sales and service countertop provided for standing customers. (see code for exception) 904.3.1 Vertical barriers. At service windows or service counters, any vertical barrier between service personnel and customers shall be at a height of 43 inches maximum above the floor. (see code for exception regarding security glazing) 904.3.2 Parallel Approach. A portion of the public use side of the counter surface 36 inches minimum in length and 26 inches minimum and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a parallel approach adjacent to the accessible counter shall be provided. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12 inches minimum. (see code for exception) 904.3.3 Forward Approach. A portion of the public use side of the counter surface 30 inches minimum in length and 36 inches maximum in height above the floor shall be provided. A clear floor space positioned for a forward approach to the accessible counter shall be provided. Knee and toe clearance complying with Section 306 shall be provided under the accessible counter. The space between the accessible counter surface and any projecting objects above the accessible counter shall be 12” minimum. Action required: Modify design to demonstrate compliance at check out counter.
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
03/28/2022

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Given that occupant load exceeds 25 an additional restroom is required. (that being said you have the option to calculate the occupant load space by space in lieu of gross - You may be able to reduce to less than 25 - provide calculations for verification)
IPC 403.1 Minimum number of fixtures
Corrective Action Required
03/28/2022

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Provide mop sink and drinking fountain. (or approved alternate)
IBC 1209.2 Finish materials
Corrective Action Required
03/28/2022

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Provide finish material schedule to demonstrate compliance at water closet and mop sink. If paint is used it must be epoxy based.
IMC 403.2 Outdoor air required
Corrective Action Required
03/28/2022

2018 IMC 403.2 Outdoor air required. The minimum outdoor airflow rate shall be determined in accordance with Section 403.3. (see code for exception) Action required: Revise drawings to show outside air calculations as well as method of delivery. Action required: Provide outdoor air calculations and method of delivery.
Miscellaneous Correction
Corrective Action Required
03/28/2022

HVAC design completion in question. Duct sizes incomplete. Return air looks inadequate. What is purpose of drywall chase and how is it constructed? Where is condensing unit? How is condensing unit screened from view? Action required: Modify design to comply.
NEC Article 210.8 (B) Other than dwelling units GFCI
Corrective Action Required
03/28/2022

2017 NEC Article 210.8 (B) Other Than Dwelling Units. All 125-volt, single-phase, 15- and 20-ampere receptacles installed in the locations specified in 210.8(B)(1) through (10) shall have ground-fault circuit-interrupter protection for personnel. (1) Bathrooms (2) Kitchens (3) Rooftops (4) Outdoors (5) Sinks - where receptacles are installed within 6 feet of the outside edge of the sink. (6) Indoor wet locations (7) Locker rooms with associated showering facilities (8) Garages, service bays, and similar areas other than vehicle exhibition halls and showrooms. (9) Crawl spaces – at or below grade level. (10) Unfinished portions or areas of the basement not intended as habitable rooms. (refer to code for exceptions) Action required: Modify drawings to show that all receptacles within 6' of a sink will by GFCI protected.
Licensed Contractors Rejected 04/06/2022 03/28/2022
Joe Frogge
LC - General Contractor
Corrective Action Required
03/28/2022

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor and an email address for the on-site contact which is where inspection reports will be sent.
LC - MEP Subs
Corrective Action Required
03/28/2022

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for New Tenent Finish $302.40 $302.40 Paid 04/11/2022
8331507-Sewer Connection Fee $150.00 $150.00 Paid 04/11/2022
7232302-Commercial Excise Tax Fee $2,595.00 $2,595.00 Paid 04/11/2022
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 06/07/2022
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Rough Electrical Inspection - Commercial Failed 5/2/2022 05/02/2022
Miscellaneous Correction
Corrective Action Required
05/02/2022
PROVIDE NAIL GUARD PROTECTION PLATES WHERE NEEDED FIRE CAULK UPWARD PENETRATIONS
Rough Electrical Inspection - Commercial Failed 5/3/2022 5/3/2022 05/03/2022
Miscellaneous Correction
Corrective Action Required
05/02/2022
PROVIDE NAIL GUARD PROTECTION PLATES WHERE NEEDED FIRE CAULK UPWARD PENETRATIONS
Misc
Corrective Action Required
05/03/2022
NO ACCESS LOCKED NO LOCKBOX INSPECT WITH IN WALL Michael Harkins 05/03/2022 8:21 AM
Rough Electrical Inspection - Commercial Passed 5/4/2022 5/4/2022 05/04/2022
Miscellaneous Correction
Resolved
05/04/2022
Misc
Resolved
05/04/2022
NO ACCESS LOCKED NO LOCKBOX INSPECT WITH IN WALL Michael Harkins 05/03/2022 8:21 AM
In-wall Inspection Failed 5/18/2022 05/18/2022
Miscellaneous Correction
Corrective Action Required
05/18/2022
No city stamped plans on site Portion wall type 5.06 calls for 6" Metal studs per plan ( wood framed ) Frame chase at metal ductwork per unapproved plan on site Provide boca plates dwv Secure electrical box above front window Fire block per code Provide blocking for 18 vertical grab bar restroom
In-wall Inspection Not Ready 5/26/2022 5/26/2022 05/26/2022
Miscellaneous Correction
Corrective Action Required
05/18/2022
Vertical fire blocking every 10' Fire block vertical to horizontal at HVAC chase Provide blocking for 18 vertical grab bar restroom
In-wall Inspection Passed 5/27/2022 5/27/2022 05/27/2022
Miscellaneous Correction
Resolved
05/27/2022
Vertical fire blocking every 10' Fire block vertical to horizontal at HVAC chase Provide blocking for 18 vertical grab bar restroom
Electrical Service Inspection Passed 6/2/2022 6/2/2022 06/02/2022
Above Ceiling Inspection Failed 7/8/2022 7/8/2022 07/08/2022
Misc
Corrective Action Required
07/08/2022
-Protect TJI joists per code -Ceiling grid support wires too loose. Twist 3 times -NM cables not allowed to be exposed. Cover NM cables with material with 20-minutes fire protection -Complete ducting to ceiling air supply registers -Complete bathroom exhaust to outside -Complete return air per plan
Above Ceiling Inspection Failed 7/13/2022 7/13/2022 07/13/2022
Misc
Corrective Action Required
07/08/2022
-Protect TJI joists per code.**close all gaps between the mineral wool batts and support with metal wires; or just install 1/2" gypsum board -NM cables not allowed to be exposed. Cover exposed NM cables with material with 20-minutes fire protection
Above Ceiling Inspection Passed 7/28/2022 7/28/2022 07/28/2022
Misc
Resolved
07/28/2022
Occupancy Inspection - Codes Commercial Failed 8/15/2022 8/15/2022 08/15/2022
Misc
Corrective Action Required
08/15/2022
Occupancy Inspection - Codes Commercial Full C of O 8/17/2022 8/17/2022 08/17/2022
Misc
Resolved
08/17/2022
**OK ro bring in furniture and set up product -Complete sheet rock and fire tape under stairs -Provide plumbing protection at sink -Provide non absorbant finish for min. 48" height at bathroom walls
Occupancy Inspection - Fire Passed 8/15/2022 8/15/2022 08/19/2022
Corrective Action Required
08/19/2022
All life safety was appropriate. Okay to occupy with approval form codes.
Documents & Images
Date Uploaded File Type Document Name
03/24/2022 Application Form Commercial Permit and License Tax Application 3822
03/24/2022 Plans Full Set of Drawings - Terra Supplements
03/31/2022 Letter DS P/R Corrections Document
03/31/2022 Plans 2022 0026 Terra Rev 1
04/04/2022 Letter Terra Supplements Letter
04/06/2022 Letter License Tax Bill
04/06/2022 Letter DS P/R Corrections Document
04/11/2022 Plans 22
04/11/2022 Approved Plans approved plans
04/11/2022 Receipt Receipt for transaction:2022-001991
04/27/2022 Letter Final Plan Review Conditions
04/27/2022 Letter DS Building Permit
05/02/2022 Letter INSPECTION SUMMARY
05/03/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/04/2022 Letter INSPECTION SUMMARY
05/18/2022 Letter INSPECTION SUMMARY
05/20/2022 Drawing 5-20-22 REVISED TERRA SUPPLEMENTS 2
05/20/2022 Drawing 5-20 REVISED TERRA
05/20/2022 Approved Plans approved - REVISED TERRA
05/26/2022 Letter INSPECTION SUMMARY
06/02/2022 Letter INSPECTION SUMMARY
06/02/2022 Letter INSPECTION SUMMARY
06/07/2022 Receipt Receipt for transaction:2022-004428
07/13/2022 Letter INSPECTION SUMMARY
07/13/2022 Letter INSPECTION SUMMARY
07/13/2022 Letter INSPECTION SUMMARY
07/28/2022 Letter INSPECTION SUMMARY
08/15/2022 Letter INSPECTION SUMMARY
08/17/2022 Letter Codes Final Certificate of Occupancy
08/17/2022 Letter Field Certificate of Occupancy
08/19/2022 Letter Fire Loss Reduction Form
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home