Permit Application Status

PRCOM20215410


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20215410
Building Permit - Commercial
Certificate of Occupancy
HY VEE FOOD STORES INC
ALTERATION COMMERCIAL
NEW CANOPY FOR GROCERY PICK UP - INCLUDES INTERIOR ALTERATIONS
10/18/2021
11/09/2021
12/14/2021
Locations
Contacts
HYVEE CONSTRUCTION LC, Address:5605 NE 22ND ST, Phone:(515) 645-2300  
Thomas.Remus@hy-veeconstruction.com, Address:Thomas.Remus@hy-veeconstruction.com  
WESTHUES ELECTRIC INC, Address:PO BOX 18220, Phone:(816) 356-5223  
BRR ARCHITECTURE - RICH MAJORS, Address:8131 METCALF AVE, STE 300, Phone:(913) 236-3444  
HY VEE FOOD STORES INC, Address:5820 WESTOWN PKWY  
WESTERN ENTERPRISE INC, Address:956 OSAGE AVE, Phone:(913) 342-0505  
MARICK INC, Address:138 JEFFERSON AVE, Phone:(515) 243-8288  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 11/05/2021 10/27/2021
Joe Frogge
LC - MEP Subs
Resolved
10/27/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Fire Plan Review Approved with Conditions 11/05/2021 10/27/2021
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
10/27/2021

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Any modifications to the fire alarm system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Construction documents - Fire protection systems
Corrective Action Required
10/27/2021

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Any modifications to the fire sprinkler system, provide PE stamped electronic shop drawings to mike.weissenbach@cityofls.net
Installation acceptance testing
Corrective Action Required
10/27/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Building Plan Review Approved 11/05/2021 10/26/2021
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Alteration to Commercial $469.24 $469.24 Paid 10/27/2021
8331507-Sewer Connection Fee $60.00 $60.00 Paid 10/27/2021
9110081-Paved Surface Inspection Fee $2,895.29 $2,895.29 Paid 11/03/2021
9110071-Site Grading Fee $624.00 $624.00 Paid 11/03/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Occupancy Inspection - Planning Passed 12/14/2021
Occupancy Inspection - Fire Passed 12/14/2021 12/14/2021 12/14/2021
Occupancy Inspection - Codes Commercial Full C of O 12/14/2021 12/14/2021 12/14/2021
Documents & Images
Date Uploaded File Type Document Name
10/18/2021 Application Form Lee's Summit 2 License Tax_Aisles On Line
10/18/2021 Application Form Lee's Summit 2 Comm Permit Application
10/26/2021 Plans AOL-Plumbing
10/26/2021 Engineer Report/Study Canopy Calculations-Arning
10/26/2021 Plans AOL Architectural
10/26/2021 Plans AOL-Electrical
10/26/2021 Plans Canopy Civil
10/26/2021 Plans Canopy Drawings-Arning
10/26/2021 Engineer Report/Study Canopy Structural Calcs-JBA
10/26/2021 Plans Canopy Structural-JBA
10/27/2021 Letter Fire Building Plan Review
10/27/2021 Approved Plans approved - construction set
10/27/2021 Approved Plans Approved FDP-Hy-Vee Store 2-Aisles OnLine-Civil Plan Set-100521
10/27/2021 Receipt Receipt for transaction:2021-008299
11/03/2021 Receipt Receipt for transaction:2021-008473
12/10/2021 Letter B2100276_Final_Letter_12.10.2021
12/10/2021 Letter B2100276_Trans1_2.26.2021
12/10/2021 Letter B2100276_Trans2_4.21.2021
12/10/2021 Letter B2100276_Trans4_8.19.2021
12/10/2021 Letter B2100276_Trans5_9.20.2021
12/10/2021 Letter B2100276_Trans6_12.6.2021
12/14/2021 Letter Fire Loss Reduction Form
12/14/2021 Letter Codes Final Certificate of Occupancy
12/14/2021 Letter B2100276_Trans3_5.17.2021
12/15/2021 Email Email Correspondence 121421_City Staff -- HyVee Staff
12/20/2021 Letter Field Certificate of Occupancy
12/20/2021 Letter INSPECTION SUMMARY
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home