Permit Application Status

PRCOM20203515


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20203515
Building Permit - Commercial
Certificate of Occupancy
REORGANIZED SCHOOL DIST NO 7
ADDITION COMMERCIAL
RENOVATION TO EXISTING OUTDOOR STADIUM FACILITIES WHICH WILL INCLUDE EXPANSION OF EXISTING PRESS BOX; CONSTRUCTION OF NEW RESTROOMS, CONCESSIONS, AND TICKET BOOTHS; AND CONSTRUCTION OF NEW BLEACHER SEATING
10/05/2020
02/17/2021
04/21/2021
11/05/2021
Locations
Contacts
REORGANIZED SCHOOL DIST NO 7, Address:600 SE MILLER  
Monarch Build, LLC, Address:8100 Newton Street Ste 300, Phone:(913) 942-2400  
CITY WIDE SHEET METAL, INC, Address:2820 G ROE LN, Phone:(913) 871-7464  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
PRO DESIGN CONTRACTORS LLC, Address:918 E WARREN ST, Phone:(913) 308-6900  
GOULD EVANS, Address:4041 MILL STREET, Phone:(816) 701-5315  
james.mowdy@monarch.build, Address:james.mowdy@monarch.build  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 06/14/2021 06/14/2021
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
06/14/2021

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Final Development Plan Review Approved 11/17/2020 02/17/2021
Mike Weisenborn
Fire Plan Review Approved with Conditions 11/17/2020 02/17/2021
Mike Weisenborn
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
02/17/2021

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. (Action Required) Order a Knox box for the elevator at knoxbox.com 11/11/20 (Verified At Inspection)
Building Plan Review Approved with Conditions 11/17/2020 02/17/2021
Mike Weisenborn
Final Development Plan
Resolved
02/17/2021

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
02/17/2021

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Elevator Equipment Permit
Corrective Action Required
02/17/2021

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Elevator Equipment Inspection
Corrective Action Required
02/17/2021

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Elevator Certificate of Inspection
Corrective Action Required
02/17/2021

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Licensed Contractors Approved 11/17/2020 01/25/2021
Joe Frogge
LC - MEP Subs
Resolved
01/25/2021

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. 11/11/20 - acknowledged in letter
LC - General Contractor
Resolved
01/25/2021

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor. 11/11/20 - acknowledged in letter
Health Department Review Approved 12/16/2020
Joe Frogge
Building Plan Review Rejected 11/17/2020 11/11/2020
Joe Frogge
Final Development Plan
Corrective Action Required
02/17/2021

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
IPC 403.1 Minimum number of fixtures
Resolved
11/11/2020

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Insufficient number of fixtures provided. CMR has been submitted. 11/11/20 - cmr approved
Health Dept Review
Resolved
12/16/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
11/10/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Elevator Equipment Permit
Corrective Action Required
11/10/2020

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Elevator Equipment Inspection
Corrective Action Required
11/10/2020

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
Elevator Certificate of Inspection
Corrective Action Required
11/10/2020

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes. 11/11/20 - acknowledged in letter
IBC 1209.2 Finish materials
Resolved
11/11/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish materials at water closets and mop sink. If paint is used it must be epoxy based.
Fire Plan Review Approved with Conditions 11/17/2020 11/11/2020
Michael Weissenbach
Miscellaneous Correction
Resolved
11/11/2020

(Action Required) Remove exit sign or add exterior emergency lighting at the visitor restrooms/ concessions.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
11/10/2020

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. (Action Required) Order a Knox box for the elevator at knoxbox.com 11/11/20 (Verified At Inspection)
Building Plan Review Rejected 10/26/2020 10/23/2020
Joe Frogge
Final Development Plan
Corrective Action Required
10/23/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
IPC 403.1 Minimum number of fixtures
Corrective Action Required
10/23/2020

2018 IPC 403.1 Minimum number of fixtures. Plumbing fixtures shall be provided in the minimum number shown in Table 403.1, based on the actual use of the building or space. Uses not shown in Table 403.1 shall be considered individually by the code official. The number of occupants shall be determined by the International Building Code. Action required: Insufficient number of fixtures provided. CMR has been submitted.
Health Dept Review
Corrective Action Required
10/23/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
10/23/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
Elevator Equipment Permit
Corrective Action Required
10/23/2020

Prior to the installation or construction of any elevator equipment, an elevator equipment permit shall be obtained from the Missouri Department of Public Safety or its authorized representative. Action required: Comment is for informational purposes.
Elevator Equipment Inspection
Corrective Action Required
10/23/2020

Prior to the operation of any new elevator equipment or the issuance of the operating certificate, such elevator equipment shall be inspected by a licensed inspector. Testing must be performed in accordance with these rules and regulations. The testing must be witnessed by a licensed inspector. Action required: Comment is for informational purposes.
Elevator Certificate of Inspection
Corrective Action Required
10/23/2020

Elevator Safety Act and Rules 701.361 - Each privately owned or operated installation and each installation owned or operated by the state of Missouri or any political subdivision of the state shall have a certificate of inspection and meet the safety code promulgated pursuant to sections 701.350 to 701.380. Action required: Comment is for informational purposes.
IBC 1209.2 Finish materials
Corrective Action Required
10/23/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finish materials at water closets and mop sink. If paint is used it must be epoxy based.
Licensed Contractors Rejected 10/26/2020 10/23/2020
Joe Frogge
LC - MEP Subs
Corrective Action Required
10/23/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
LC - General Contractor
Corrective Action Required
10/23/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
Fire Plan Review Approved with Conditions 10/26/2020 10/19/2020
Michael Weissenbach
Miscellaneous Correction
Corrective Action Required
10/19/2020

(Action Required) Remove exit sign or add exterior emergency lighting at the visitor restrooms/ concessions.
Key boxes for non-standardized fire service elevator keys
Corrective Action Required
10/19/2020

2018 IFC 506.1.2 Key boxes for non-standardized fire service elevator keys. Key boxes provided for non-standardized fire service elevator keys shall comply with Section 506.1 and 506.2 or as approved by the fire code official. (Action Required) Order a Knox box for the elevator at knoxbox.com
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Addition to Commercial $6,825.00 $6,825.00 Paid 02/17/2021
8331401-Water Tap Fee $23,873.00 $23,873.00 Paid 02/17/2021
8350015-Water Meter Fee $2,401.70 $2,401.70 Paid 02/17/2021
91100C9-Water Insp Fee $1,803.00 $1,803.00 Paid 02/17/2021
9110081-Paved Surface Inspection Fee $2,444.23 $2,444.23 Paid 02/17/2021
9110068-Storm Fee $211.80 $211.80 Paid 02/17/2021
9110071-Site Grading Fee $1,946.72 $1,946.72 Paid 02/17/2021
91100C8-Sanitary Sewer Insp Fees $192.60 $192.60 Paid 02/17/2021
8331507-Sewer Connection Fee $660.00 $660.00 Paid 02/17/2021
9110080-Not Ready Inspection Fee $50.00 $50.00 Paid 10/27/2021
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Water Line - Construction Inspection Passed 03/23/2021
Misc
Informational
03/04/2021
On Wednesday, 3-03-2021. Contractor Pro Design began ground breaking to install the water utilities for the School facilities. The contractor exposed the 6” cast iron water main. The original drawing call out the water main size to be *” however we determined it is a 6” line. The contractor dug trench for the Back flow meter box and sat box. Contractor notified Water Services that a 2” domestic tap was needed.
Misc
Informational
03/08/2021
On Thursday, 3-04-2021. Contractor Pro Design had Water Services Dept complete the 2” Tap for the proposed domestic water line. The contractor also Tried to install the 6” tie and valve scheduled to be installed for the back flow valve vault. Did not complete connection.
Misc
Informational
03/08/2021
On Friday, 3-05-2021. Pro Design Completed the “T” connection with valve connection to the Back flow vault as well as the 2” water line and meter installation and poured the thrust block and restraints for the fire line. Contractor backfilled service to the vault.
Misc
Informational
03/09/2021
On Tuesday, 3-09-2021. Pro Design resumed the domestic and fire line water lines for the new concession stand located in the back of the school at the football field,
Misc
Informational
03/10/2021
On Wednesday, 3-10-2021. The contractor resumed the water line installation. Contractor installed approx 280 LF of 3” pvc for domestic line and 280LF for the 6” fire line.
Misc
Informational
03/16/2021
On Friday, 3-12-2021. Pro-Design contractor’s resumed domestic and fire line installation. One fire Hydrant was installed completing the 6” main installation. The contractor installed approx 70 LF of 3” domestic water line and back filled after concrete set from restraints poured.
Misc
Informational
03/16/2021
On Monday, 3-15-2021. Contractor not working too wet!
Misc
Informational
03/16/2021
On Tuesday, 3-16-2021. Contractor resumed domestic water line installation. Contractor installed all fitting bends required. Poured all restraints and backfilled.
Misc
Informational
03/23/2021
On Tuesday, 3-22-2021. Pro Design construction completed the installation of the 3” domestic water line for the school concession stand. Both water lines, domestic and fire lines have been completed. Pressure testing is still lift to be completed.
Sanitary - Material Verification Passed 03/23/2021
Misc
Informational
03/23/2021
On Monday, 3-22-2021. Sanitary Sewer Materials were observed and do meet city spec’s.
Sanitary Sewer Construction Inspection Passed 03/23/2021
Misc
Informational
03/23/2021
On Monday, 3-22-2021. Contractor Pro Design began and completed the installation of the Sanitary Sewer. After visual inspection, sewer was backfilled.
Fire Line - Hydrostatic Test Passed 3/30/2021 04/27/2021
Misc
Informational
04/27/2021
The hydrostatic pressure test has been completed and passed. If failed the first time, they dug it up and found the leak and made the correction.
Water Service Inspection Passed 4/27/2021 04/27/2021
DCM8 Water Meter Height
Corrective Action Required
03/04/2021
THE TOP OF THE WATER METER TO BE SET AT A DEPTH OF 14 TO 18 INCHES BELOW THE WATER METER LID.
DCM8 Water Meter Height
Corrective Action Required
03/04/2021
THE TOP OF THE WATER METER TO BE SET AT A DEPTH OF 14 TO 18 INCHES BELOW THE WATER METER LID.
Misc
Informational
03/04/2021
On Wednesday, 3-03-2021. Contractor Pro Design began installation of the 6” water main tie - in. The contractor installed the vault for the back flow valves. The contractor exposed the existing 6” cast iron line and notified the Water Services Dept. that they needed the 2” tap for the domestic line to installed.
Misc
Informational
04/27/2021
The water meter tap has been installed with 2" copper to the meter and 10 feet past the meter. The contractor transitioned over to 3" stick pipe after the copper. I spoke with the water dept. and they said they do not have take water samples for this. Pro Design installed the pipe and have flushed it out. It has been capped off and is ready for connection to the building by the plumbers. It would be suggested that the plumbers flush this out again when they install their pipe inside. Pro Design also flushed the fire line that was installed with a back flow preventer.
Miscellaneous Inspection Passed 4/27/2021 04/27/2021
Misc
Informational
04/27/2021
The service water line has been installed, the sanitary sewer wye connection has been installed along with the pipe, the 6" fire line has been installed along with the hydrostatic test that passed. The water service line tranistioned from a 2" copper to a 3"pvc pipe. We spoke with the water dept. and they said they did not have to take samples on this line.
Footing Inspection - Commercial Failed 4/30/2021 (2:00) 4/30/2021 04/30/2021
Misc
Corrective Action Required
04/30/2021
-Minimum clearances to earth per plan -upload third party reports within 48 hours of pour
Footing Inspection - Commercial Partial 5/4/2021 05/04/2021
Misc
Informational
05/04/2021
Third party inspection reports regarding concession stand footing received and approved
Underslab Plumbing Inspection - Commercial Passed 5/6/2021 5/5/2021 05/05/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
05/05/2021
Visitor's concession stand bathrooms
Footing Inspection - Commercial Partial 5/5/2021 (2:00) 5/5/2021 05/05/2021
Misc
Informational
05/04/2021
Third party inspection reports regarding concession stand footing received and approved
THE FOLLOWING AREAS ARE APPROVED
Corrective Action Required
05/05/2021
North ticket booth, including copper ufer
Footing Inspection - Commercial Partial 5/6/2021 (11:30) 5/6/2021 05/06/2021
Misc
Resolved
05/06/2021
Third party inspection reports regarding concession stand footing received and approved
THE FOLLOWING AREAS ARE APPROVED
Informational
05/06/2021
North and south ticket booths approved
Underslab Electrical Inspection - Commercial Partial 5/7/2021 5/7/2021 05/07/2021
Misc
Informational
05/07/2021
Visitors concession underslab electric approved
Footing Inspection - Commercial Partial 5/11/2021 (1:00) 5/11/2021 05/11/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
05/06/2021
-North and south ticket booths approved -Southside of grandstand extension approved
Underslab Electrical Inspection - Commercial Partial 5/12/2021 5/12/2021 05/12/2021
Misc
Informational
05/07/2021
-Visitors concession underslab electric approved -south ticket booth approved
Footing Inspection - Commercial Partial 5/12/2021 05/12/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
05/11/2021
-North and south ticket booths approved -North and south grandstand extension approved
Underslab Electrical Inspection - Commercial Partial 5/13/2021 5/13/2021 05/12/2021
Misc
Informational
05/12/2021
-Visitors concession underslab electric approved -North and south ticket booths approved
In-wall Inspection Partial 5/28/2021 5/28/2021 05/28/2021
Misc
Informational
05/28/2021
Visitors concession/restrooms only - partial approval of plumbing and electrical. Plumbing in concealed chases approved to ceiling level. Electrical conduit in CMU walls approved up to 8 blocks in height
Underslab Electrical Inspection - Commercial Not Ready 7/6/2021 7/6/2021 07/06/2021
Misc
Informational
05/12/2021
-Visitors concession underslab electric approved -North and south ticket booths approved
Misc
Corrective Action Required
07/06/2021
Press box 3rd floor incomplete. recall when ready
In-wall Inspection Partial 7/16/2021 07/16/2021
Misc
Informational
05/28/2021
Visitors concession/restrooms only - partial approval of plumbing and electrical. Plumbing in concealed chases approved to ceiling level. Electrical conduit in CMU walls approved up to 8 blocks in height
THIRD FLOOR
Corrective Action Required
07/16/2021
PRESS BOX 3RD FLOOR- STORAGE WALL OK TO ONE SIDE W1-302 NORTH EXTERIOR WALL OK TO COVERE W1-S3
Above Ceiling Inspection Failed 7/20/2021 7/20/2021 07/20/2021
Misc
Corrective Action Required
07/20/2021
2nd floor press building: -provide detail on track support for hard ceiling. - install all whips and MC , ssecure within 12" of box or if MC is over 6' whip. - missing knock out on 4x4 box north wall.
Above Ceiling Inspection Partial 7/21/2021 7/21/2021 07/21/2021
Misc
Corrective Action Required
07/20/2021
2nd floor press building: above ceiling ok W1-201, W1-202 and W1-203 W1-205 data complete electrical for above ceiling, submit revision if removing track ceiling from room
Electrical Service Inspection Partial 7/23/2021 7/23/2021 07/23/2021
Misc
Corrective Action Required
07/23/2021
East Consetion stand Building - service ok to release MDP only.
In-wall Inspection Partial 7/23/2021 7/23/2021 07/23/2021
Misc
Informational
07/16/2021
Visitors concession/restrooms only - partial approval of plumbing and electrical. Plumbing in concealed chases approved to ceiling level. Electrical conduit in CMU walls approved up to 8 blocks in height
THIRD FLOOR
Corrective Action Required
07/16/2021
PRESS BOX 3RD FLOOR- STORAGE WALL OK TO ONE SIDE W1-302 NORTH EXTERIOR WALL OK TO COVER W1-S3 ok to cover except stair wall at door , install exit light over door.
Footing Inspection - Commercial Passed 7/26/2021 (8:00) 7/26/2021 07/26/2021
THE FOLLOWING AREAS ARE APPROVED
Informational
05/12/2021
-North and south ticket booths approved -North and south grandstand extension approved -(16) Pads and piers for bleachers norh and south
Above Ceiling Inspection Partial 7/29/2021 7/29/2021 07/29/2021
Misc
Corrective Action Required
07/21/2021
2nd floor press building: above ceiling ok W1-201, W1-202 and W1-203 W1-205 data complete electrical for above ceiling, submit revision if removing track ceiling from room concession stand above ceiling ok
Water Service Inspection Passed 08/23/2021
DCM8 Water Meter Height
Corrective Action Required
03/04/2021
THE TOP OF THE WATER METER TO BE SET AT A DEPTH OF 14 TO 18 INCHES BELOW THE WATER METER LID.
DCM8 Water Meter Height
Corrective Action Required
03/04/2021
THE TOP OF THE WATER METER TO BE SET AT A DEPTH OF 14 TO 18 INCHES BELOW THE WATER METER LID.
Misc
Informational
03/04/2021
On Wednesday, 3-03-2021. Contractor Pro Design began installation of the 6” water main tie - in. The contractor installed the vault for the back flow valves. The contractor exposed the existing 6” cast iron line and notified the Water Services Dept. that they needed the 2” tap for the domestic line to installed.
Occupancy Inspection - Fire Temporary C of O 8/23/2021 8/23/2021 08/23/2021
Corrective Action Required
08/23/2021
Add elevator knox box. Post max occupancy sign on third floor observation deck. Add keys to knox box.
Water Line - Construction Inspection Passed 4/27/2021 08/23/2021
Misc
Informational
03/04/2021
On Wednesday, 3-03-2021. Contractor Pro Design began ground breaking to install the water utilities for the School facilities. The contractor exposed the 6” cast iron water main. The original drawing call out the water main size to be *” however we determined it is a 6” line. The contractor dug trench for the Back flow meter box and sat box. Contractor notified Water Services that a 2” domestic tap was needed.
Underslab Electrical Inspection - Commercial Passed 8/23/2021 08/23/2021
Misc
Resolved
08/23/2021
-Visitors concession underslab electric approved -North and south ticket booths approved
Misc
Resolved
08/23/2021
Press box 3rd floor incomplete. recall when ready
Electrical Service Inspection Passed 7/20/2021 08/23/2021
Misc
Resolved
08/23/2021
East Consetion stand Building - service ok to release MDP only.
In-wall Inspection Passed 7/22/2021 08/23/2021
Misc
Resolved
08/23/2021
Visitors concession/restrooms only - partial approval of plumbing and electrical. Plumbing in concealed chases approved to ceiling level. Electrical conduit in CMU walls approved up to 8 blocks in height
THIRD FLOOR
Resolved
08/23/2021
PRESS BOX 3RD FLOOR- STORAGE WALL OK TO ONE SIDE W1-302 NORTH EXTERIOR WALL OK TO COVER W1-S3 ok to cover except stair wall at door , install exit light over door.
Above Ceiling Inspection Passed 7/28/2021 08/23/2021
Misc
Resolved
08/23/2021
2nd floor press building: above ceiling ok W1-201, W1-202 and W1-203 W1-205 data complete electrical for above ceiling, submit revision if removing track ceiling from room concession stand above ceiling ok
Occupancy Inspection - Codes Commercial Failed 8/23/2021 8/23/2021 08/23/2021
Misc
Corrective Action Required
08/23/2021
Press box: -2 GFCI's on 3rd floor SE,S boxes not working. -Label Panels. -Provide 1" clearance to B vent 3rd floor. -Occupancy load sign 3rd floor. - install handrail to 3rd floor on north side. Concession stand: -Wire 2 locker room heaters. -Label all panels. - complete sidewalk at southeast corner of building. - complete fencing. Ticket booth 1&2ok. Other departments under separate cover.
Occupancy Inspection - Planning Passed 8/23/2021 08/23/2021
Occupancy Inspection - Codes Commercial Failed 8/25/2021 08/25/2021
Misc
Corrective Action Required
08/23/2021
Press box: -Address rated assembly at elevator-No inspections performed -Occupancy load sign 3rd floor. Concession stand: -Label all panels.-Incomplete - complete fencing. Ticket booth 1&2ok. Other departments under separate cover.
Occupancy Inspection - Codes Commercial Temporary C of O 8/27/2021 8/27/2021 08/27/2021
Misc
Corrective Action Required
08/25/2021
TCO until 9-30-21 Press box: -Address rated assembly at elevator-No inspections performed -Provide permanent Occupancy load sign 3rd floor. -Complete fencing. Complete corrections for all other departments
Water Line - Hydrostatic Test Passed 09/07/2021
Occupancy Inspection - Engineering Temporary C of O 8/23/2021 09/07/2021
Informational
09/07/2021
Temporary Occupancy can be given. 1. 70% vegetation needs to be established 2. All trash and debris needs to be cleaned up of the site.. We will check back in 60 days to check on vegetation.
Occupancy Inspection - Fire Passed 9/21/2021 09/21/2021
Rated Assembly Inspection Passed 9/27/2021 9/27/2021 09/27/2021
Occupancy Inspection - Codes Commercial Temporary C of O 9/27/2021 9/27/2021 09/27/2021
Misc
Corrective Action Required
08/27/2021
TCO until 10-30-21 Complete corrections for all other departments
Occupancy Inspection - Engineering Passed 10/28/2021 10/28/2021
Misc
Informational
10/28/2021
All punch list items have been completed.
Occupancy Inspection - Codes Commercial Full C of O 11/05/2021
Misc
Resolved
11/05/2021
TCO until 10-30-21 Complete corrections for all other departments
Documents & Images
Date Uploaded File Type Document Name
10/05/2020 Application Form LSW - Commercial Permit Application
10/12/2020 Plans Lees Summit West High School - VOL3 - Drexel Bid Set - 2020 09 28
10/12/2020 Engineer Report/Study LSR7 Athletic Facilites - Structural Calcs - 100220
10/12/2020 Letter Letter of Code Modification Request - 2020-10-1 Athletics CMR
10/12/2020 Letter LSW_Code Modification Request COMMERCIAL
10/12/2020 Letter LSW_Analysis_Stadium Restrooms_2020_09_30
10/12/2020 Drawing LSW_Travel Distance Diagrams
10/12/2020 Application Form LSR7 LSWHS - App&Affidavit - 10052020
10/12/2020 Application Form LSR7 LSWHS - FDP App Checklist - 10052020
10/12/2020 Letter 20200921 LSWHS Athletics Stormwater Compliance Letter
10/12/2020 Drawing W-E100P - PHOTOMETRIC LIGHTING PLANS_pdf
10/12/2020 Drawing Lee's Summit High School_lighting cut sheets
10/12/2020 Specifications Lee's Summit High Schools - Specifications - Vol 2
10/12/2020 Specifications Lee's Summit High Schools - Specifications - Vol 1
10/14/2020 Email RE Lee's Summit High Schools Project Valuations
10/19/2020 Letter Fire Building Plan Review
10/23/2020 Letter DS P/R Corrections Document
11/10/2020 Letter Lee's Summit High Schools Addenda Narratives
11/10/2020 Letter LSW report - prcom20203515 - Response
11/10/2020 Specifications Lee's Summit High Schools - Specifications - Vol 1 - REV 2020 11 09
11/10/2020 Specifications Lee's Summit High Schools - Specifications - Vol 2 - REV 2020 11 09
11/11/2020 Letter Fire Building Plan Review
11/11/2020 Code Mod Request CMR for LSW approved
12/16/2020 Email New Food Establishment Plan Review - Approved FTG 0001446
02/17/2021 Receipt Receipt for transaction: 2021-000754
02/17/2021 Letter DS Building Permit
02/17/2021 Approved Plans Approved Lee's Summit West High School - Drawings - Vol 3 - REV 2021 02 09
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/27/2021 Letter INSPECTION SUMMARY
04/30/2021 Letter INSPECTION SUMMARY
05/04/2021 Engineer Report/Study 20-1227-dr-5
05/04/2021 Engineer Report/Study 20-1227-dr-4
05/04/2021 Engineer Report/Study 20-1227-dr-4
05/04/2021 Engineer Report/Study 20-1227-dr-5
05/04/2021 Letter INSPECTION SUMMARY
05/05/2021 Letter INSPECTION SUMMARY
05/06/2021 Letter INSPECTION SUMMARY
05/06/2021 Letter INSPECTION SUMMARY
05/06/2021 Letter INSPECTION SUMMARY
05/06/2021 Letter INSPECTION SUMMARY
05/06/2021 Letter INSPECTION SUMMARY
05/07/2021 Letter INSPECTION SUMMARY
05/11/2021 Letter INSPECTION SUMMARY
05/12/2021 Letter INSPECTION SUMMARY
05/12/2021 Letter INSPECTION SUMMARY
05/12/2021 Letter INSPECTION SUMMARY
05/28/2021 Letter INSPECTION SUMMARY
06/14/2021 Letter Fire (Alarm) Plan Review Notice
07/06/2021 Letter INSPECTION SUMMARY
07/16/2021 Letter INSPECTION SUMMARY
07/20/2021 Letter INSPECTION SUMMARY
07/21/2021 Pages from 090001-01 - Gypsum Assembly Data - GE Review - APPROVED
07/21/2021 Letter INSPECTION SUMMARY
07/23/2021 Letter INSPECTION SUMMARY
07/23/2021 Letter INSPECTION SUMMARY
07/26/2021 Letter INSPECTION SUMMARY
07/29/2021 Letter INSPECTION SUMMARY
07/29/2021 Monarch Mail - LSW - Ceiling Removal - W1-205
07/30/2021 3RD Party Insp Report INSPECTION
08/23/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter Fire Loss Reduction Form
08/23/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter License Tax Not Applicable
08/23/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/23/2021 Letter INSPECTION SUMMARY
08/24/2021 Letter INSPECTION SUMMARY
08/25/2021 Letter INSPECTION SUMMARY
08/27/2021 Letter Codes Temporary Certificate of Occupancy
09/07/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/15/2021 Letter INSPECTION SUMMARY
09/20/2021 GE RFI 39 Response 2021 08 24 - Revised Sheets
09/21/2021 Letter Fire Loss Reduction Form
09/22/2021 Letter Fire Loss Reduction Form
09/27/2021 Letter INSPECTION SUMMARY
09/27/2021 Letter Codes Temporary Certificate of Occupancy
10/27/2021 Receipt Receipt for transaction:2021-008269
10/28/2021 Letter INSPECTION SUMMARY
10/28/2021 Letter INSPECTION SUMMARY
11/05/2021 Letter Field Certificate of Occupancy
11/05/2021 Letter Codes Final Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home