Permit Application Status

PRCOM20202331


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20202331
Building Permit - Commercial
Certificate of Occupancy
PATTERSON DONALD R & REBECCA L-TRS
CHANGE OF TENANT
TENANT FINISH FOR HAIR/NAIL SALON AND SPA
08/14/2020
09/21/2020
02/13/2021
11/24/2020
Locations
Contacts
KC Contractors, Address:21285 Oakleaf Dr Bucyrus Ks 66013, Phone:(913) 963-5502  
LIBERTY PLUMBING, HEATING AND AC, LLC, Address:604 S LEONARD, Phone:(816) 781-1469  
NICKELL ELECTRIC COMPANY INC, Address:1606 MAIN ST, Phone:(816) 246-8797  
A-1 SEWER & SEPTIC SERVICE INC, Address:1891 MERRIAM LN, Phone:(913) 631-5201  
RCH Design, Address:9064 NE 264th St, Phone:(816) 803-0412  
sethd@kccontractorsinc.com  
PATTERSON DONALD R & REBECCA L-TRS, Address:PO BOX 338  
Reviews
Review Type Outcome Est. Completion Date Completed
Licensed Contractors Approved 08/28/2020 08/26/2020
Development Center
LC - General Contractor
Corrective Action Required
08/21/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
08/21/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Building Plan Review Approved with Conditions 08/28/2020 08/24/2020
Joe Frogge
Code analysis required
Resolved
08/24/2020

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide complete code analysis.
IBC 2406.4 Hazardous locations - safety glazing
Resolved
08/24/2020

2018 IBC 2406.4 Hazardous locations. The locations specified in Sections 2406.4.1 through 2406.4.7 shall be considered specific hazardous locations requiring safety glazing materials. Action required: Window in stairway must be tempered safety glass.
Miscellaneous Correction
Resolved
08/24/2020

Massage services must comply with Code of Ordinances. Action required: Modify plans to comply. https://library.municode.com/mo/lee's_summit/codes/code_of_ordinances?nodeId=COOR_CH28TA_ARTIIBULITA_DIV2MATHMAFA
IPC 403.1.1 Fixture calculations
Resolved
08/24/2020

2018 IPC 403.1.1 Fixture calculations. To determine the occupant load of each sex, the total occupant load shall be divided in half. To determine the required number of fixtures, the fixture ratio or ratios for each fixture type shall be applied to the occupant load of each sex in accordance with Table 403.1. Fractional numbers resulting from applying the fixture ratios of Table 403.1 shall be rounded up to the next whole number. For calculations involving multiple occupancies, such fractional numbers for each occupancy shall be first be summed and then rounded up to the next whole number. (see code section for exception) Action required: Provide mop sink. (possibly waived based on floor materials - unable to locate finish schedule)
IBC 1209.2 Finish materials
Resolved
08/24/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finishes.
Planning - Screening of ground mounted equipment
Corrective Action Required
08/21/2020

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. 8/24/20 - Boxwoods must be at least as tall as equipment screened at time of planting. To be field verified at inspections.
IMC 403.3.1.1 Outdoor airflow - nail salon
Resolved
08/24/2020

2018 IMC 403.3.1.1 Outdoor airflow rate. Ventilation systems shall be designed to have the capacity to supply the minimum outdoor airflow rate, determined in accordance with this section. In each occupiable space, the ventilation system shall be designed to deliver the required rate of outdoor airflow to the breathing zone. The occupant load utilized for design of the ventilation system shall be not less than the number determined from the estimated maximum occupant load rate indicated in Table 403.3.1.1. Ventilation rates for occupancies not represented in Table 403.3.1.1 shall be those for a listed occupancy classification that is most similar in terms of occupant density, activities and building construction; or shall be determined by an approved engineering analysis. The ventilation system shall be design to supply the required rate of ventilation air continuously during the period the building is occupied, except as otherwise stated in other provisions of the code. (see code section for smoking requirements and exception) Table 403.3.1.1 Footnote h. For nail salons, each manicure and pedicure station shall be provided with a source capture system capable of exhausting not less than 50 cfm. Exhaust inlets shall be located in accordance with Section 502.20. Where one or more required source capture systems operate continuously during occupancy, the exhaust rate from such systems shall be permitted to be applied to the exhaust flow rate required by Table 403.3.1.1 for the nail salon. Action required: Provided detailed and complete exhaust designs for any manicure/pedicure station.
Gen - Plan submittals 2018 codes
Resolved
08/24/2020

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update code references.
IBC 502.1 - Address Identification
Resolved
08/24/2020

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Modify title blocks for MEP design with correct address.
IPC 1002.1 Fixture traps
Resolved
08/24/2020

2018 IPC 1002.3 Prohibited Traps. The following types of traps are prohibited: 1. Traps that depend on moving parts to maintain the seal. 2. Bell traps. 3. Crown-vented traps. 4. Traps not integral with a fixture and that depend on interior partitions for the seal, except those traps constructed of an approved material that is resistant to corrosion and degradation. 5. “S” traps. 6. Drum traps. Action required: Provide verification that hair traps are compliant. (note: double traps are also prohibited)
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Resolved
08/24/2020

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle within 25' of new condensing unit.
Fire Plan Review Approved with Conditions 08/28/2020 08/21/2020
Michael Weissenbach
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/21/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 1 2A10BC Fire Extinguisher on first floor and basement level.
Miscellaneous Correction
Resolved
08/21/2020

(Informational Purposes) 1. Provide complete code analysis 2. Update records showing 2018 I-Series
Building Plan Review Rejected 08/25/2020 08/17/2020
Joe Frogge
Code analysis required
Corrective Action Required
08/17/2020

A code analysis shall be provided which includes but is not limited to occupancy type, occupant load, construction type, actual area, height and floors, allowable area, height and floors, and the codes to which the project is designed. Action required: Provide complete code analysis.
IBC 2406.4 Hazardous locations - safety glazing
Corrective Action Required
08/17/2020

2018 IBC 2406.4 Hazardous locations. The locations specified in Sections 2406.4.1 through 2406.4.7 shall be considered specific hazardous locations requiring safety glazing materials. Action required: Window in stairway must be tempered safety glass.
Miscellaneous Correction
Corrective Action Required
08/17/2020

Massage services must comply with Code of Ordinances. Action required: Modify plans to comply. https://library.municode.com/mo/lee's_summit/codes/code_of_ordinances?nodeId=COOR_CH28TA_ARTIIBULITA_DIV2MATHMAFA
IPC 403.1.1 Fixture calculations
Corrective Action Required
08/17/2020

2018 IPC 403.1.1 Fixture calculations. To determine the occupant load of each sex, the total occupant load shall be divided in half. To determine the required number of fixtures, the fixture ratio or ratios for each fixture type shall be applied to the occupant load of each sex in accordance with Table 403.1. Fractional numbers resulting from applying the fixture ratios of Table 403.1 shall be rounded up to the next whole number. For calculations involving multiple occupancies, such fractional numbers for each occupancy shall be first be summed and then rounded up to the next whole number. (see code section for exception) Action required: Provide mop sink. (possibly waived based on floor materials - unable to locate finish schedule)
IBC 1209.2 Finish materials
Corrective Action Required
08/17/2020

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant wall finishes.
Planning - Screening of ground mounted equipment
Corrective Action Required
08/17/2020

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section.
IMC 403.3.1.1 Outdoor airflow - nail salon
Corrective Action Required
08/17/2020

2018 IMC 403.3.1.1 Outdoor airflow rate. Ventilation systems shall be designed to have the capacity to supply the minimum outdoor airflow rate, determined in accordance with this section. In each occupiable space, the ventilation system shall be designed to deliver the required rate of outdoor airflow to the breathing zone. The occupant load utilized for design of the ventilation system shall be not less than the number determined from the estimated maximum occupant load rate indicated in Table 403.3.1.1. Ventilation rates for occupancies not represented in Table 403.3.1.1 shall be those for a listed occupancy classification that is most similar in terms of occupant density, activities and building construction; or shall be determined by an approved engineering analysis. The ventilation system shall be design to supply the required rate of ventilation air continuously during the period the building is occupied, except as otherwise stated in other provisions of the code. (see code section for smoking requirements and exception) Table 403.3.1.1 Footnote h. For nail salons, each manicure and pedicure station shall be provided with a source capture system capable of exhausting not less than 50 cfm. Exhaust inlets shall be located in accordance with Section 502.20. Where one or more required source capture systems operate continuously during occupancy, the exhaust rate from such systems shall be permitted to be applied to the exhaust flow rate required by Table 403.3.1.1 for the nail salon. Action required: Provided detailed and complete exhaust designs for any manicure/pedicure station.
Gen - Plan submittals 2018 codes
Corrective Action Required
08/17/2020

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update code references.
IBC 502.1 - Address Identification
Corrective Action Required
08/17/2020

2018 IBC 502.1 Address identification. New and existing buildings shall be provided with approved address identification. The address identification shall be legible and placed in a position that is visible from the street or road fronting the property. Address identification characters shall contrast with their background. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Each character shall be a minimum of 4 inches high with a minimum stroke width of ½ inch. Where required by the fire code official, address identification shall be provided in additional approved locations to facilitate emergency response. Where access is by means of a private road and the building address cannot be viewed from the public way, a monument, pole or other approved sign or means shall be used to identify the structure. Address identification shall be maintained. Action required: Modify title blocks for MEP design with correct address.
IPC 1002.1 Fixture traps
Corrective Action Required
08/17/2020

2018 IPC 1002.3 Prohibited Traps. The following types of traps are prohibited: 1. Traps that depend on moving parts to maintain the seal. 2. Bell traps. 3. Crown-vented traps. 4. Traps not integral with a fixture and that depend on interior partitions for the seal, except those traps constructed of an approved material that is resistant to corrosion and degradation. 5. “S” traps. 6. Drum traps. Action required: Provide verification that hair traps are compliant. (note: double traps are also prohibited)
NEC Article 210.63 Heating, air-conditioning and refrigeration outlet
Corrective Action Required
08/17/2020

2017 NEC Article 210.63 Heating, Air-Conditioning, and Refrigeration Equipment Outlet. A 125-volt, single-phase, 15- or 20-ampere-rated receptacle outlet shall be installed at an accessible location for the servicing of heating, air-conditioning, and refrigeration equipment. The receptacle shall be located on the same level and within 25 feet of the heating, air-conditioning, and refrigeration equipment. The receptacle outlet shall not be connected to the load side of the equipment disconnecting means. Action required: Provide receptacle within 25' of new condensing unit.
Fire Plan Review Approved with Conditions 08/25/2020 08/17/2020
Michael Weissenbach
Portable fire extinguishers - conspicuous locations
Corrective Action Required
08/17/2020

2018 IFC 906.5- Conspicuous location. Portable fire extinguishers shall be located in conspicuous locations where they will be readily accessible and immediately available for use. These locations shall be along normal paths of travel, unless the fire code official determines that the hazard posed indicates the need for placement away from normal paths of travel. (Verified At Inspection) Provide 1 2A10BC Fire Extinguisher on first floor and basement level.
Miscellaneous Correction
Corrective Action Required
08/17/2020

(Informational Purposes) 1. Provide complete code analysis 2. Update records showing 2018 I-Series
Licensed Contractors Rejected 08/25/2020 08/17/2020
Joe Frogge
LC - General Contractor
Corrective Action Required
08/17/2020

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Either a Class A or Class B license is required. Provide the name of the licensed general contractor.
LC - MEP Subs
Corrective Action Required
08/17/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors.
Zoning Review Approved 08/26/2020 08/14/2020
Joe Frogge
Fees
Paid Fees Amount Paid Owing Date Paid
9110078-Valuation Fee for Change of Tenant $183.00 $183.00 Paid 08/26/2020
$0.00
8331507-Sewer Connection Fee $330.00 $330.00 Paid 08/26/2020
Outstanding Fees Amount Paid Owing Date Paid


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
All Rough Inspection - Commercial Failed 9/22/2020 9/22/2020 09/22/2020
Miscellaneous Correction
Corrective Action Required
09/22/2020
-COMPLETE ALL MECHANICAL -SEAL ALL PLATE PENETRATIONS -PARCH/SEAL HOLES IN SUB FLOOR -FIRE BLOCK ALL DEAD SPACES -PROVIDE VERTICAL FIRESTOP MAX. 10’ OC IN FUR OUT WALLS -PROVIDE PROTECTION PLATES AT ALL DWV AND NM WHERE LESS THAN 1 1/4” TO FACE OF STUD -PROVIDE MINIMUM (2) 2X4 BEARING STUDS AT LVLs -NAIL DOUBLE 2X4s PER CODE -ADD 1/2” PLYWOOD TO GAP IN 2X4 BEARING STUDS AND NAIL PER CODE TO COMPLETE STUD PACK -PROVIDE STRAPS ON SECOND 2X6 JOIST HEADER AT LVL -SUPPORT LINE SET PER CODE -COMPLETE SUB PANEL
Underslab Plumbing Inspection - Commercial Passed 9/24/2020 9/24/2020 09/24/2020
Miscellaneous Correction
Informational
09/24/2020
-DWV FOR BATHROOMS, MOP SINK, BREAK ROOM, AND MAIN CLEANOUT
All Rough Inspection - Commercial Failed 9/28/2020 9/28/2020 09/28/2020
Miscellaneous Correction
Corrective Action Required
09/22/2020
-COMPLETE ALL MECHANICAL BASEMENT - -SUPPORT LINE SET PER CODE - - PROVIDE MC CABLE ABOVE SUSPENDED CEILING AREAS IN BASEMENT - - MAIN FLOOR OK TO INSULATE & ROCK-
All Rough Inspection - Commercial Partial 10/7/2020 10/07/2020
Miscellaneous Correction
Corrective Action Required
09/28/2020
- MAIN FLOOR OK TO INSULATE & ROCK- - OK TO ROCK WALLS BASEMENT -
Above Ceiling Inspection Passed 11/4/2020 11/4/2020 11/04/2020
Occupancy Inspection - Fire Temporary C of O 11/9/2020 11/9/2020 11/09/2020
Occupancy Inspection - Codes Commercial Failed 11/9/2020 11/9/2020 11/09/2020
Misc
Corrective Action Required
11/09/2020
200 3rd st Re Identify white conductor in ac disconnect & service panel Provide tamper proof cap new ac condenser Seal all exterior penetrations Return handrails to wall or post top & bottom Restroom mirror 40" max aff Provide open face toilet seat Provide temper mixing valves restroom sinks & head shampoo sink faucets 412.10 IPC Ada signs restrooms 48" x 60" Provide GFCI protection pedicure station Label service panel Provide GFCI protection unfinished basement areas Provide GFCI protection washing machine Provide GFCI protection receptacles within 6' of shampoo sinks Provide hammer arrestors Provide 1" clearance at B vent mech room Provide Hi/Lo vent for combustion air mech room Mount fire extinguishers Sump discharge 36" & from foundations & splash blocks Egress door locks shall comply with 1010.1.9.1 Tight grasping type lock Handrail basement stairs non compliant
All Rough Inspection - Commercial Passed 11/10/2020 11/10/2020
Miscellaneous Correction
Resolved
11/10/2020
- MAIN FLOOR OK TO INSULATE & ROCK- - OK TO ROCK WALLS BASEMENT -
Occupancy Inspection - Codes Commercial Temporary C of O 11/10/2020 11/10/2020 11/10/2020
Misc
Corrective Action Required
11/09/2020
200 3rd st Re Identify white conductor in ac disconnect & service panel Provide tamper proof cap new ac condenser Seal all exterior penetrations Restroom mirror 40" max AFF Provide temper mixing valves restroom sinks & head shampoo sink faucets 412.10 IPC Label service panel Provide hammer arrestors hot & cold washing machine Sump discharge 36" & from foundations & splash blocks Egress door locks shall comply with 1010.1.9.1 Tight grasping type lock Exterior handrail basement stairs non compliant
Occupancy Inspection - Codes Commercial Full C of O 11/24/2020 11/24/2020 11/24/2020
Misc
Resolved
11/24/2020
Documents & Images
Date Uploaded File Type Document Name
08/14/2020 Application Form SSD-Permit app
08/14/2020 Application Form taX APP
08/14/2020 Plans 20-001-permit
08/14/2020 Plans Salon DeCrist MEP
08/14/2020 Email lt info
08/17/2020 Letter Fire Building Plan Review
08/17/2020 Letter DS P/R Corrections Document
08/21/2020 Letter salon responce
08/21/2020 Plans 20-001-permit-rev seal
08/21/2020 Plans Salon DeCrist MEP Rev1
08/21/2020 Letter Fire Building Plan Review
08/24/2020 Approved Plans Approved salon drawings
08/26/2020 Receipt Receipt for transaction: 2020-005685
08/26/2020 Letter DS Building Permit
09/22/2020 Letter INSPECTION SUMMARY
09/24/2020 Letter INSPECTION SUMMARY
09/28/2020 Letter INSPECTION SUMMARY
10/07/2020 Letter INSPECTION SUMMARY
10/07/2020 Letter INSPECTION SUMMARY
11/04/2020 Letter INSPECTION SUMMARY
11/09/2020 Letter INSPECTION SUMMARY
11/09/2020 Letter INSPECTION SUMMARY
11/09/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter INSPECTION SUMMARY
11/10/2020 Letter Codes Temporary Certificate of Occupancy
11/24/2020 Letter Field Certificate of Occupancy
11/24/2020 Letter Codes Final Certificate of Occupancy
11/24/2020 Letter Codes Final Certificate of Occupancy
11/30/2020 Letter Field Certificate of Occupancy
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home