Permit Application Status

PRCOM20200445


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20200445
Building Permit - Commercial
Certificate of Occupancy
MID CONTINENT PUBLIC LIBRARY
NEW COMMERCIAL
NEW LIBRARY
02/21/2020
06/01/2020
09/15/2020
07/26/2021
Locations
Contacts
MID CONTINENT PUBLIC LIBRARY, Address:15616 E US 24 HWY  
JE DUNN CONSTRUCTION CO, Address:120 S CENTRAL AVE STE 350, Phone:(816) 474-8600  
SAPP DESIGN ARCHITECTS, Address:3750 S FREMONT, Phone:(417) 877-9600  
PRO-MECHANICAL, Address:P O BOX 903, Phone:(816) 743-4800  
STACO ELECTRIC CONSTRUCTION COMPANY INC, Address:11030 HICKMAN MILLS DR, Phone:(816) 765-7112  
KANSAS CITY MECHANICAL INC, Address:6822 KANSAS AVE, Phone:(913) 334-1101  
Intertek-PSI, Address:2828 S. 44th Street, Phone:(913) 310-1600  
  
Reviews
Review Type Outcome Est. Completion Date Completed
Alarm Plan Review Released for Construction 12/17/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
12/17/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Sprinkler Plan Review Released for Construction 08/19/2020
Michael Weissenbach
Installation acceptance testing
Corrective Action Required
08/19/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule a Hydrostatic test and a Water Flow test.
Misc
Corrective Action Required
08/19/2020

(Informational Purposes) Update your records showing NFPA 13 2016 edition.
Final Development Plan Review Approved 06/01/2020
Joe Frogge
Building Plan Review Approved with Conditions 04/06/2020 04/02/2020
Joe Frogge
Final Development Plan
Resolved
04/27/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 3/19/20 - acknowledged in letter
Miscellaneous Correction
Resolved
04/27/2020

Existing building to be demolished prior to start of this project. Action required: Demolition permit will be required. 3/19/20 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
03/30/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 3/19/20 - acknowledged in letter
IBC 1010.1.2 Door swing - direction of swing egress travel
Resolved
03/30/2020

2018 IBC 1010.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) 2018 IBC 1010.1.2.1 Direction of swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Actions required: - Clarify use and occupant load of Staff Area 137. Sliding doors are only allowed with occupant load of 10 or less. Furniture conflicts with 1/150 loading. If sliding doors are actually to be used as "movable partitions" they would have to be labelled as such. - Clarify use of center hinged pivoting doors. If they are only to be used as "movable partitions" they would have to be labelled as such. 3/19/20 - provide updated door schedule to reflect changes
NEC Article 110.26 (C)(2) Large equipment
Resolved
03/30/2020

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Doors serving Receiving Room #117 are to swing in direction of egress and be equipped with panic hardware. 3/19/20 - provide new door schedule that reflects these changes.
Miscellaneous Correction
Corrective Action Required
03/30/2020

Irrigation system (as shown in FDP) is not reflected in MEP design. Action required: Coordinate designs and resolve any conflicts. 3/19/20 - P-series drawings must be coordinated with L600 series. i.e. Landscaping irrigation plans specify a connection to the domestic water system but the plumbing drawings do not. 3/30/20 - According to architect's letter this has been coordinated. Field verify.
Licensed Contractors Approved 04/06/2020 03/30/2020
Joe Frogge
Fire Plan Review Approved with Conditions 04/06/2020 03/30/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
03/30/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Knox box required
Corrective Action Required
03/30/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Order a Knox box at knoxbox.com for the exterior of the building.
Construction documents - Fire protection systems
Corrective Action Required
03/30/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
03/30/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Special Inspections Review Approved 03/26/2020
Joe Frogge
Health Department Review Approved 03/23/2020
Joe Frogge
Building Plan Review Rejected 03/25/2020 03/19/2020
Joe Frogge
Final Development Plan
Corrective Action Required
03/18/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes. 3/19/20 - acknowledged in letter
Gen - Plan submittals 2018 codes
Resolved
03/19/2020

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update code analysis to show correct code adoption years.
IBC 1704.2 Special Inspections
Resolved
03/26/2020

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections. 3/19/20 - Not found in re-submittal as noted in letter.
Miscellaneous Correction
Resolved
04/27/2020

Existing building to be demolished prior to start of this project. Action required: Demolition permit will be required. 3/19/20 - acknowledged in letter
Health Dept Review
Resolved
03/23/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes. 3/19/20 - acknowledged in letter
Health Dept Inspection
Corrective Action Required
03/18/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes. 3/19/20 - acknowledged in letter
ICC A117.1 305.3 Clear Floor Space
Resolved
03/19/2020

ICC A117.1 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width. 305.3. Existing Buildings and facilities. In existing buildings and facilities the clear floor space shall be 48 inches minimum in length and 30 inches minimum in width. Action required: Update accessibility plan to show increased floor space requirement.
IBC 1010.1.2 Door swing - direction of swing egress travel
Corrective Action Required
03/18/2020

2018 IBC 1010.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) 2018 IBC 1010.1.2.1 Direction of swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Actions required: - Clarify use and occupant load of Staff Area 137. Sliding doors are only allowed with occupant load of 10 or less. Furniture conflicts with 1/150 loading. If sliding doors are actually to be used as "movable partitions" they would have to be labelled as such. - Clarify use of center hinged pivoting doors. If they are only to be used as "movable partitions" they would have to be labelled as such. 3/19/20 - provide updated door schedule to reflect changes
IBC 603.1 Type of Construction - Allowable Materials
Resolved
03/19/2020

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Wood (including sheathing) is not allowed in parapet or roof construction unless fire-retardant-treated.
IMC 606.2.1 Duct detector
Resolved
03/19/2020

2018 IMC 606.2.1 Return air systems. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm, in the return air duct or plenum upstream of any filters, exhaust air connections, outdoor air connections, or decontamination equipment and appliances. Exception: Smoke detectors are not required in the return air system where all portions of the building served by the air distribution system are protected by area smoke detectors connected to a fire alarm system in accordance with the International Fire Code. The area smoke detection system shall comply with Section 606.4. Action required: Provide duct smoke detectors where required.
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
03/18/2020

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Doors serving Receiving Room #117 are to swing in direction of egress and be equipped with panic hardware. 3/19/20 - provide new door schedule that reflects these changes.
Miscellaneous Correction
Corrective Action Required
03/18/2020

Irrigation system (as shown in FDP) is not reflected in MEP design. Action required: Coordinate designs and resolve any conflicts. 3/19/20 - P-series drawings must be coordinated with L600 series. i.e. Landscaping irrigation plans specify a connection to the domestic water system but the plumbing drawings do not.
Licensed Contractors Approved 03/25/2020 03/19/2020
Joe Frogge
LC - MEP Subs
Resolved
03/19/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Mechanical (HVAC) contractor.
Fire Plan Review Approved with Conditions 03/25/2020 03/19/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
03/18/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Knox box required
Corrective Action Required
03/18/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Verified At Inspection) Order a Knox box at knoxbox.com for the exterior of the building.
Construction documents - Fire protection systems
Corrective Action Required
03/18/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
03/18/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Resolved
03/19/2020

(Informational Purposes) Update your records showing 2018 I-Series code requirements.
Duct smoke detectors
Resolved
03/19/2020

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Duct detection required with CFM over 2000.
Illumination required
Resolved
03/19/2020

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Action Required) Provide exterior emergency lighting at vestibule and Door 137B.
Licensed Contractors Rejected 03/06/2020 02/27/2020
Joe Frogge
LC - MEP Subs
Corrective Action Required
02/27/2020

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company name of licensed Mechanical (HVAC) contractor.
Building Plan Review Rejected 03/06/2020 02/27/2020
Joe Frogge
Final Development Plan
Corrective Action Required
02/27/2020

The building permit for this project cannot be issued until the Development Services Department has received, approved, and processed the Final Development Plan. Action required: Comment is for informational purposes.
Gen - Plan submittals 2018 codes
Corrective Action Required
02/27/2020

All plans submitted for review on or after April 1, 2019 shall be designed to the requirements of the 2018 International Building Code, 2018 International Mechanical Code, 2018 International Plumbing Code, 2018 International Fuel Gas Code, 2018 International Fire Code, 2017 National Electric Code and the ICC/ANSI A117.1-2017 as amended and adopted by the City of Lee’s Summit. Action required: Update code analysis to show correct code adoption years.
IBC 1704.2 Special Inspections
Corrective Action Required
02/27/2020

2018 IBC 1704.2 Special inspections. Where application is made for construction as described in this section, the owner or the registered design professional in responsible charge acting as the owner’s agent shall employ one or more approved agencies to perform inspections during construction on the types of work listed under Section 1705. These inspections are in addition to the inspections identified in Lee’s Summit Code of Ordinances Chapter 7. (see code section for exceptions) Action required: Provide statement of special inspections / letter of responsibility from company contracted to perform special inspections.
Miscellaneous Correction
Corrective Action Required
02/27/2020

Existing building to be demolished prior to start of this project. Action required: Demolition permit will be required.
Health Dept Review
Corrective Action Required
02/27/2020

For the Health Department review contact Deb Sees with the Jackson County Public Works Department, Environmental Services Division, at (816) 847-7070. Health Department approval is required prior to receiving any type of building permit from the City of Lee's Summit. Action required: Comment is for informational purposes.
Health Dept Inspection
Corrective Action Required
02/27/2020

For the Health Department inspection contact Deb Sees with the Jackson County Public Works Department, Environmental Health Division at (816) 847-7070. Health Department approval is required prior to receiving any type of Occupancy from the City of Lee's Summit. Action required: Comment is for informational purposes.
ICC A117.1 305.3 Clear Floor Space
Corrective Action Required
02/27/2020

ICC A117.1 Section 305.3 Size. 305.3.1 New Buildings and facilities. In new buildings and facilities the clear floor space shall be 52 inches minimum in length and 30 inches minimum in width. 305.3. Existing Buildings and facilities. In existing buildings and facilities the clear floor space shall be 48 inches minimum in length and 30 inches minimum in width. Action required: Update accessibility plan to show increased floor space requirement.
IBC 1010.1.2 Door swing - direction of swing egress travel
Corrective Action Required
02/27/2020

2018 IBC 1010.1.2 Door swing. Egress doors shall be of the pivoted or side-hinged swinging type. Exceptions: (See code for exceptions.) 2018 IBC 1010.1.2.1 Direction of swing. Pivot or side-hinged swinging doors shall swing in the direction of egress travel where serving a room or area containing an occupant load of 50 or more persons or a Group H occupancy. Actions required: - Clarify use and occupant load of Staff Area 137. Sliding doors are only allowed with occupant load of 10 or less. Furniture conflicts with 1/150 loading. If sliding doors are actually to be used as "movable partitions" they would have to be labelled as such. - Clarify use of center hinged pivoting doors. If they are only to be used as "movable partitions" they would have to be labelled as such.
IBC 603.1 Type of Construction - Allowable Materials
Corrective Action Required
02/27/2020

2018 IBC 603.1 Allowable Materials. Combustible materials shall be permitted in buildings of Type I or II construction in the following applications and in accordance with Sections 603.1.1 through 603.1.3: (see code for specific examples and exceptions) Action required: Wood (including sheathing) is not allowed in parapet or roof construction unless fire-retardant-treated.
IMC 606.2.1 Duct detector
Corrective Action Required
02/27/2020

2018 IMC 606.2.1 Return air systems. Smoke detectors shall be installed in return air systems with a design capacity greater than 2,000 cfm, in the return air duct or plenum upstream of any filters, exhaust air connections, outdoor air connections, or decontamination equipment and appliances. Exception: Smoke detectors are not required in the return air system where all portions of the building served by the air distribution system are protected by area smoke detectors connected to a fire alarm system in accordance with the International Fire Code. The area smoke detection system shall comply with Section 606.4. Action required: Provide duct smoke detectors where required.
NEC Article 110.26 (C)(2) Large equipment
Corrective Action Required
02/27/2020

2017 NEC Article 110.26 (C) (2) Large Equipment. For equipment rated 1200 amperes or more and over 6 feet wide that contains overcurrent devices, switching devices, or control devices, there shall be one entrance to and egress from the required working space not less than 24” wide and 6’6” high at each end to the working space. A single entrance to and egress from the required working space shall be permitted where either of the conditions in 110.26(C)(2)(a) or (C)(2)(b) is met. (a) Unobstructed Egress. Where the location permits a continuous and unobstructed way of egress travel, a single entrance to the working space shall be permitted. (b) Extra Working Space. Where the depth of the working space is twice that required by 110.26(A)(1), a single entrance shall be permitted. It shall be located such that the distance from the equipment to the nearest edge of the entrance is not less than the minimum clear distance specified in Table 110.26(A)(1) for equipment operating at that voltage and in that condition. 110.26 (C)(3) Personnel Doors. Where equipment rated 800 A or more that contains overcurrent devices, switching devices, or control devices is installed and there is a personnel door(s) intended for entrance to and egress from the working space less than 25 feet from the nearest edge of the working space, the door(s) shall open in the direction of egress and be equipped with panic hardware. Action required: Doors serving Receiving Room #117 are to swing in direction of egress and be equipped with panic hardware.
Miscellaneous Correction
Corrective Action Required
02/27/2020

Irrigation system (as shown in FDP) is not reflected in MEP design. Action required: Coordinate designs and resolve any conflicts.
Fire Plan Review Rejected 03/06/2020 02/25/2020
Michael Weissenbach
Construction documents for fire alarm systems
Corrective Action Required
02/25/2020

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. (Action Required) Provide three sets of PE stamped shop drawings for the fire alarm system.
Knox box required
Corrective Action Required
02/25/2020

2018 IFC 506.1- Where required. Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type and shall contain keys to gain necessary access as required by the fire code official. (Action Required) Order a Knox box at knoxbox.com for the exterior of the building.
Construction documents - Fire protection systems
Corrective Action Required
02/25/2020

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. (Action Required) Provide three sets of PE stamped shop drawings for the fire sprinkler system.
Installation acceptance testing
Corrective Action Required
02/25/2020

2018 IFC 901.5- Installation acceptance testing. Fire detection and alarm systems, fire-extinguishing systems, fire hydrant systems, fire standpipe systems, fire pump systems, private fire service mains and all other fire protection systems and appurtenances thereto shall be subject to acceptance tests as contained in the installation standards and as approved by the fire code official. The fire code official shall be notified before any required acceptance testing. The fire code official shall be notified 48 hours before any required acceptance test. (Informational Purposes) Call (816)969-1300 to schedule testing.
Miscellaneous Correction
Corrective Action Required
02/25/2020

(Informational Purposes) Update your records showing 2018 I-Series code requirements.
Duct smoke detectors
Corrective Action Required
02/25/2020

2018 IFC 907.3.1 Duct smoke detectors. Smoke detectors installed in ducts shall be listed for the air velocity, temperature and humidity present in the duct. Duct smoke detectors shall be connected to the building's fire alarm control unit when a fire alarm system is rquired by Section 907.2. Activation of a duct smoke detector shall initiate a visible and audible supervisory signal at a constantly attended location and shall perform the intended fire safety function in accordance with theis code and the International Mechanical Code. Duct smoke detectors shall not be used as a substitute for required open area detection. (Action Required) Duct detection required with CFM over 2000.
Illumination required
Corrective Action Required
02/25/2020

2018 IFC 1008.1 Illumination required. The means of egress, shall be illuminated at all times the building space served by the means of egress is occupied. (Action Required) Provide exterior emergency lighting at vestibule and Door 137B.
Fees
Paid Fees Amount Paid Owing Date Paid
7232302-Commercial License Tax Fee $205,185.00 $205,185.00 Paid 03/24/2020
$205,185.00
9110078-Valuation Fee for New Commercial $27,662.04 $27,662.04 Paid 04/27/2020
8331507-Sewer Connection Fee $690.00 $690.00 Paid 04/27/2020
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Inspections
Inspection Outcome Requested Scheduled Date Inspected
Footing Inspection - Commercial Partial 6/5/2020 (11:00) 6/5/2020 at 9:30 AM 06/05/2020
Misc
Partial Correction
06/05/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: LINE 1/B TO 1/E, EXCEPT COL PADS AT 1/B&1/E -INTERIOR COLUMN PADS OK TO POUR: 2/B TO 2/E; 3/B TO 3/E; 4/D TO 4/E
Footing Inspection - Commercial Partial 6/8/2020 6/8/2020 at 10:55 AM 06/08/2020
Misc
Partial Correction
06/05/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/2.5 TO A.3/1; 1/A.3 TO 1/D, EXCEPT COL PADS AT A.3/2.5&1/D -INTERIOR COLUMN PADS OK TO POUR: 2/B TO 2/E; 3/B TO 3/E; 4/D TO 4/E
Footing Inspection - Commercial Partial 6/8/2020 at 1:35 PM 06/08/2020
Misc
Partial Correction
06/08/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/2.4; 1/A.3 TO 1/E.7 -INTERIOR COLUMN PADS OK TO POUR: 2/B TO 2/E; 3/B TO 3/E; 4/D TO 4/E
Footing Inspection - Commercial Partial 6/9/2020 (10:00) 6/9/2020 at 11:10 AM 06/09/2020
Misc
Partial Correction
06/08/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/2.4; 1/A.3 TO 1/F TO F/5.9 -INTERIOR COLUMN PADS OK TO POUR: 2/B TO 2/E; 3/B TO 3/E; 4/D TO 4/E
Underslab Plumbing Inspection - Commercial Partial 6/10/2020 at 3:50 PM 06/10/2020
Misc
Partial Correction
06/10/2020
UNDERSLAB PLUMBING OK BELOW: -2" WATER SERVICE LINE INTO THE BUILDING -2 RESTROOMS AND ABOUT 100 FT OF BUILDING DRAIN STARTING FROM SEWER CLEANOUT
Footing Inspection - Commercial Partial 6/10/2020 (11:00) 6/11/2020 at 7:40 AM 06/11/2020
Misc
Partial Correction
06/09/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/2.4; 1/A.3 TO 1/F TO F/5.9; SOUTH GB FROM 6/C TO A/5.3 -INTERIOR COLUMN PADS OK TO POUR: 2/D TO 2/E; 3/D TO 3/E; ALL COL PADS ON B AND C, AND E LINES;
Footing Inspection - Commercial Partial 6/12/2020 (8:00) 6/12/2020 at 3:25 PM 06/12/2020
Misc
Partial Correction
06/11/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/2.4; 1/A.3 TO 1/F TO F/5.9; SOUTH GB FROM 6/C TO A/5.3 : A.3/5 TO A.3/2 AND A.2/5.4 TO A.2/5 -INTERIOR COLUMN PADS OK TO POUR: 2/D TO 2/E; 3/D TO 3/E; ALL COL PADS ON B AND C, AND E LINES; -INTERIOR COLUMN PADS: 4/D AND 5/D
Footing Inspection - Commercial Partial 6/15/2020 6/15/2020 06/15/2020
Misc
Partial Correction
06/12/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/2.4; 1/A.3 TO 1/F TO F/5.9; SOUTH GB FROM 6/C TO A/5.3 : A.3/5 TO A.3/2 AND A.2/5.4 TO A.2/5 5.4 LINE FROM COLUMN LINE C TO D: 6 LINE FROM D TO EAST CORNER F/6 : PAD D/5.4, D/6, E/6 -INTERIOR COLUMN PADS OK TO POUR: 2/D TO 2/E; 3/D TO 3/E; ALL COL PADS ON B AND C, AND E LINES; -INTERIOR COLUMN PADS: 4/D AND 5/D
Underslab Plumbing Inspection - Commercial Partial 6/15/2020 6/15/2020 06/15/2020
Misc
Partial Correction
06/10/2020
UNDERSLAB PLUMBING OK BELOW: -2" WATER SERVICE LINE INTO THE BUILDING -3 RESTROOMS AND ABOUT 100 FT OF BUILDING DRAIN STARTING FROM SEWER CLEANOUT -STORM SEWER NORTH SIDE -STORAGE AREA FLOOR DRAIN AND HAND SINK NE CORNER -
Footing Inspection - Commercial Partial 6/16/2020 (8:00) 6/16/2020 at 7:50 AM 06/16/2020
Misc
Partial Correction
06/15/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/5; A.2/5 TO A.2/5.4; 1/A.3 TO 1/F TO F/5.9; SOUTH GB FROM 6/C TO A.2/5.3; 5.4 LINE FROM COLUMN LINE C TO D; D/5.4 TO E/6; 6 LINE FROM D TO EAST CORNER F/6; -INTERIOR COLUMN PADS OK TO POUR: ALL COL PADS ON B, C, D, AND E LINES; -EXTERIOR COLUMN PADS OK TO POUR: LINE A/5, 5.7, AND 7; A.5/7
Footing Inspection - Commercial Partial 6/17/2020 6/17/2020 at 9:05 AM 06/17/2020
Misc
Partial Correction
06/16/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/5; A.2/5 TO A.2/5.4; 1/A.3 TO 1/F TO F/5.9; SOUTH GB FROM 6/C TO A.2/5.3; 5.4 LINE FROM COLUMN LINE C TO D; D/5.4 TO E/6; 6 LINE FROM D TO EAST CORNER F/6; -INTERIOR COLUMN PADS OK TO POUR: ALL COL PADS ON B, C, D, AND E LINES; -EXTERIOR COLUMN PADS OK TO POUR: A/5&5.7; LINE 7 FROM A TO D.1
Underslab Plumbing Inspection - Commercial Partial 6/17/2020 6/17/2020 at 2:50 PM 06/17/2020
Misc
Partial Correction
06/15/2020
UNDERSLAB PLUMBING OK BELOW: -2" WATER SERVICE LINE INTO THE BUILDING -3 RESTROOMS AND ABOUT 100 FT OF BUILDING DRAIN STARTING FROM SEWER CLEANOUT -STORAGE AREA FLOOR DRAIN AND HAND SINK NE CORNER -SAN. DWV ON COL F -STORM SEWER NORTH SIDE -STORM DRAIN IN AREA 4-6/D-F
Footing Inspection - Commercial Partial 6/18/2020 at 8:25 AM 06/18/2020
Misc
Partial Correction
06/17/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/5; A.2/5 TO A.2/5.4; 1/A.3 TO 1/F TO F/5.9; SOUTH GB FROM 6/C TO A.2/5.3; 5.4 LINE FROM COLUMN LINE C TO D; D/5.4 TO E/6; 6 LINE FROM D TO EAST CORNER F/6; -INTERIOR COLUMN PADS OK TO POUR: ALL COL PADS ON B, C, D, AND E LINES; -EXTERIOR COLUMN PADS OK TO POUR: A/5&5.7; LINE 7 FROM A TO D.1 -STOOPS OUTSIDE EXTERIOR DOORS-OK
Underslab Electrical Inspection - Commercial Partial 6/19/2020 6/19/2020 at 8:55 AM 06/19/2020
Misc
Partial Correction
06/19/2020
-EAST HALF SIDE OF THE BUILDING UE-OK
Underslab Plumbing Inspection - Commercial Partial 6/22/2020 6/22/2020 at 8:20 AM 06/22/2020
Misc
Partial Correction
06/17/2020
UNDERSLAB PLUMBING OK BELOW: -SANITARY DRAINAGE COMPLETED -STORM SEWER NORTH SIDE -STORM DRAIN IN AREA 4-6/D-F
Underslab Electrical Inspection - Commercial Partial 6/22/2020 6/22/2020 06/22/2020
Misc
Partial Correction
06/19/2020
-EAST HALF SIDE OF THE BUILDING UE-OK
Underslab Plumbing Inspection - Commercial Partial 6/23/2020 6/23/2020 at 9:50 AM 06/23/2020
Misc
Partial Correction
06/22/2020
UNDERSLAB PLUMBING OK BELOW: -SANITARY DRAINAGE COMPLETED -GREASE WASTE DRAINAGE -STORM DRAIN NORTH SIDE -STORM DRAIN IN AREA 4-6/D-F
Underslab Electrical Inspection - Commercial Passed 6/25/2020 6/25/2020 at 9:25 AM 06/25/2020
Misc
Partial Correction
06/22/2020
-EAST HALF SIDE OF THE BUILDING UE-OK
Underslab Plumbing Inspection - Commercial Passed 6/26/2020 6/26/2020 at 12:55 PM 06/26/2020
Misc
Informational
06/26/2020
UNDERSLAB PLUMBING OK BELOW: -SANITARY DRAINAGE COMPLETED -GREASE WASTE DRAINAGE AND INTERCEPTOR -STORM DRAIN
Underground Electrical Inspection - Commercial Partial 7/9/2020 7/9/2020 at 12:35 PM 07/09/2020
Misc
Partial Correction
07/09/2020
UNDERGROUND ELECTRICAL RACEWAYS TO LIGHT POLES-OK: 3 SW LP
Underground Electrical Inspection - Commercial Partial 7/10/2020 7/10/2020 at 1:00 PM 07/10/2020
Misc
Partial Correction
07/09/2020
UNDERGROUND ELECTRICAL RACEWAYS TO LIGHT POLES-OK: 6 LP AT SW&SE AREA
Footing Inspection - Commercial Partial 9/14/2020 9/14/2020 09/14/2020
Misc
Partial Correction
06/18/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/5; A.2/5 TO A.2/5.4; 1/A.3 TO 1/F TO F/5.9; SOUTH GB FROM 6/C TO A.2/5.3; 5.4 LINE FROM COLUMN LINE C TO D; D/5.4 TO E/6; 6 LINE FROM D TO EAST CORNER F/6; -INTERIOR COLUMN PADS OK TO POUR: ALL COL PADS ON B, C, D, AND E LINES; -EXTERIOR COLUMN PADS OK TO POUR: A/5&5.7; LINE 7 FROM A TO D.1 -STOOPS OUTSIDE EXTERIOR DOORS-OK
Misc
Corrective Action Required
09/14/2020
EXTERIOR COLUMN PILASTER REBAR NOT INSTALLED PER PLAN
In-wall Inspection Partial 9/23/2020 09/23/2020
Misc
Partial Correction
09/23/2020
IN-WALL OK TO COVER: -VESTIBULE 101 AND CAFE 102
Rough Plumbing Inspection - Commercial Partial 9/25/2020 9/25/2020 09/25/2020
Misc
Partial Correction
09/25/2020
ROOF STORM WATER DRAINAGE OK BELOW: -WEST DRAIN AND OVERFLOW AT NORTH HALF OF BUILDING; DRAIN ONLY AT MIDDLE EAST; DRAIN AND OVERFLOW AT SE SIDE OF BUILDING
Rough Plumbing Inspection - Commercial Passed 9/28/2020 9/28/2020 09/28/2020
Misc
Informational
09/28/2020
ROOF STORM WATER DRAINAGE OK
In-wall Inspection Partial 9/29/2020 9/29/2020 09/29/2020
Misc
Partial Correction
09/23/2020
IN-WALL OK TO COVER: -VESTIBULE 101 AND CAFE 102 -WEST SIDE OF BUILDING
Footing Inspection - Commercial Partial 9/30/2020 (1:00) 9/30/2020 09/30/2020
Misc
Partial Correction
09/14/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/5; A.2/5 TO A.2/5.4; 1/A.3 TO 1/F TO F/5.9; SOUTH GB FROM 6/C TO A.2/5.3; 5.4 LINE FROM COLUMN LINE C TO D; D/5.4 TO E/6; 6 LINE FROM D TO EAST CORNER F/6; -INTERIOR COLUMN PADS OK TO POUR: ALL COL PADS ON B, C, D, AND E LINES; -EXTERIOR COLUMN PADS OK TO POUR: A/5&5.7; LINE 7 FROM A TO D.1 -STOOPS OUTSIDE EXTERIOR DOORS-OK -TRASH ENCLOSURE GB-OK
Misc
Resolved
09/30/2020
In-wall Inspection Passed 10/7/2020 10/7/2020 10/07/2020
Misc
Resolved
10/07/2020
IN-WALL OK TO COVER: -VESTIBULE 101 AND CAFE 102 -WEST SIDE OF BUILDING
Footing Inspection - Commercial Partial 11/4/2020 (1:00) 11/4/2020 11/04/2020
Misc
Partial Correction
09/30/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/5; A.2/5 TO A.2/5.4; 1/A.3 TO 1/F TO F/5.9; SOUTH GB FROM 6/C TO A.2/5.3; 5.4 LINE FROM COLUMN LINE C TO D; D/5.4 TO E/6; 6 LINE FROM D TO EAST CORNER F/6; -INTERIOR COLUMN PADS OK TO POUR: ALL COL PADS ON B, C, D, AND E LINES; -EXTERIOR COLUMN PADS OK TO POUR: A/5&5.7; LINE 7 FROM A TO D.1 -STOOPS OUTSIDE EXTERIOR DOORS-OK -TRASH ENCLOSURE GB-OK
Footing Inspection - Commercial Partial 11/6/2020 11/06/2020
Misc
Partial Correction
11/04/2020
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/5; A.2/5 TO A.2/5.4; 1/A.3 TO 1/F TO F/5.9; SOUTH GB FROM 6/C TO A.2/5.3; 5.4 LINE FROM COLUMN LINE C TO D; D/5.4 TO E/6; 6 LINE FROM D TO EAST CORNER F/6; -INTERIOR COLUMN PADS OK TO POUR: ALL COL PADS ON B, C, D, AND E LINES; -EXTERIOR COLUMN PADS OK TO POUR: A/5&5.7; LINE 7 FROM A TO D.1 -STOOPS OUTSIDE EAST AND WEST EXTERIOR DOORS-OK -TRASH ENCLOSURE GB-OK
Gas Piping Inspection - Commercial Failed 11/17/2020 11/17/2020 11/17/2020
Misc
Corrective Action Required
11/17/2020
Paint and install all clamp and supports on roof.
Above Ceiling Inspection Partial 11/17/2020 11/17/2020 11/17/2020
Misc
Corrective Action Required
11/17/2020
Hard Ceilings-ok to cover the following: Soffit 108,140,132,137, Recall when HVAC is complete in restrooms:106,107,115,116,124,125.
Gas Service Inspection - Commercial Passed 11/17/2020 11/17/2020 11/17/2020
Above Ceiling Inspection Partial 11/18/2020 11/18/2020 11/18/2020
Misc
Corrective Action Required
11/17/2020
Hard Ceilings-ok to cover the following: Soffit 108,140,132,137, Hard lids at: 107,115,116,124,125 Recall when HVAC is complete in restrooms:106
Above Ceiling Inspection Partial 11/20/2020 11/20/2020 11/20/2020
Misc
Corrective Action Required
11/18/2020
Hard Ceilings-ok to cover the following: Soffit 108,140,132,137, Hard lids at: 106,107,115,116,124,125
Electrical Service Inspection Failed 9/23/2020 12/16/2020 12/16/2020
Misc
Corrective Action Required
12/16/2020
-Grounding electrode conductors shall be per plan (3/0 cu GEC to water and building steel) -Bond water pipe around valve with same size as GEC -Install bonding jumper sized per 250.66 from the grounded bus bar to the grounding bus bar where the GEC are connected to. 250.24
Electrical Service Inspection Passed 12/21/2020 12/21/2020 12/21/2020
Misc
Resolved
12/21/2020
-Grounding electrode conductors shall be per plan (3/0 cu GEC to water and building steel) -Bond water pipe around valve with same size as GEC -Install bonding jumper sized per 250.66 from the grounded bus bar to the grounding bus bar where the GEC are connected to. 250.24
Above Ceiling Inspection Partial 12/31/2020 12/31/2020 12/31/2020
Misc
Corrective Action Required
11/20/2020
Hard Ceilings-ok to cover the following: Soffit 108,140,132,137, Hard lids at: 106,107,115,116,124,125, Cafe
Sprinkler - Hydrostatic Test Passed 1/13/2021 01/13/2021
Above Ceiling Inspection Partial 1/14/2021 1/14/2021 01/14/2021
Misc
Corrective Action Required
12/31/2020
Hard Ceilings-ok to cover the following: Soffit 108,140,132,137, Hard lids at: 106,107,115,116,124,125, Cafe, vestibule
Above Ceiling Inspection Partial 1/15/2021 1/15/2021 01/15/2021
Misc
Corrective Action Required
01/14/2021
Hard Ceilings-ok to cover the following: Soffit 108,140,132,137, Hard lids at: 106,107,115,116,124,125, Cafe, vestibule, east side and central area
Above Ceiling Inspection Partial 1/22/2021 01/22/2021
Misc
Partial Correction
01/22/2021
Hard Ceilings-ok to cover the following: Soffit 108,140,132,137, Hard lids at: 106,107,115,116,124,125, Cafe, vestibule, east side and central area, west area
Above Ceiling Inspection Partial 1/27/2021 01/27/2021
Misc
Partial Correction
01/22/2021
Hard Ceilings-ok to cover the following: Soffit 108,140,132,137, Hard lids at: 106,107,115,116,124,125, Cafe, vestibule, east side and central area, west area, cafe outside soffit
Sprinkler - Flow Test Passed 3/24/2021 03/24/2021
Alarm Test Passed 3/24/2021 03/24/2021
Occupancy Inspection - Engineering Failed 4/6/2021 04/06/2021
Corrective Action Required
04/06/2021
Submit As-Built for detention basin and begin vegetation of site.
Above Ceiling Inspection Passed 04/06/2021
Misc
Resolved
04/06/2021
Hard Ceilings-ok to cover the following: Soffit 108,140,132,137, Hard lids at: 106,107,115,116,124,125, Cafe, vestibule, east side and central area, west area, cafe outside soffit
Footing Inspection - Commercial Passed 04/06/2021
Misc
Resolved
04/06/2021
-EXTERIOR WALL GB AND INT. COLUMN PAD-OK TO POUR: A.3/1 TO A.3/5; A.2/5 TO A.2/5.4; 1/A.3 TO 1/F TO F/5.9; SOUTH GB FROM 6/C TO A.2/5.3; 5.4 LINE FROM COLUMN LINE C TO D; D/5.4 TO E/6; 6 LINE FROM D TO EAST CORNER F/6; -INTERIOR COLUMN PADS OK TO POUR: ALL COL PADS ON B, C, D, AND E LINES; -EXTERIOR COLUMN PADS OK TO POUR: A/5&5.7; LINE 7 FROM A TO D.1 -STOOPS OUTSIDE EAST AND WEST EXTERIOR DOORS-OK -TRASH ENCLOSURE GB-OK
Underground Electrical Inspection - Commercial Passed 04/06/2021
Misc
Partial Correction
07/10/2020
UNDERGROUND ELECTRICAL RACEWAYS TO LIGHT POLES-OK: 3 SW LP
Occupancy Inspection - Fire Passed 4/6/2021 04/06/2021
Gas Piping Inspection - Commercial Passed 04/06/2021
Misc
Resolved
04/06/2021
Paint and install all clamp and supports on roof.
Occupancy Inspection - Codes Commercial Failed 4/6/2021 4/6/2021 04/06/2021
Misc
Corrective Action Required
04/06/2021
-Approval required from: Fire, Planning, Field Service, Water, Health -Covers missing at light pole -Provide protection for the service equipment from vehicle damage -Install weather-proof covers for the all outdoor receptacles, including the one inside trash enclosure. -Seal exterior wall penetration of gas piping -Install permanent occupant load signage at all assembly areas -The flexible raceway for the outdoor patio panic hardware is damaged -Cannot verify that the “Library” signage is UL listed -Receptacles located within 6 ft of the sink must be gfci-protected (mop sink, coffee serving area) -Protection of the water supply at: water filter, ice maker, coffee maker -Close off open electrical box above sink in mechanical rm behind cafe -Gfci protection for drinking fountain outlet -Provide permanent signage for restrooms -Install box extension for all receptacle boxes in IT room recessed from combustible wall finish -Provide compliance with NEC 110.16 -Paint rooftop gas piping for protection against corrosion -Uncover the sprinkler head in NE utility room -Verify that the sliding glass doors and swing door glazing are safety glazing
Occupancy Inspection - Planning Failed 04/06/2021
Corrective Action Required
04/06/2021
The required ground cover must be installed prior to full CO.
Corrective Action Required
04/06/2021
The required ADA parking signs must be installed prior to TCO.
Occupancy Inspection - Water Utilities Passed 4/6/2021 04/07/2021
Occupancy Inspection - Codes Commercial Failed 4/7/2021 04/07/2021
Misc
Corrective Action Required
04/06/2021
-Approval required from: Planning, Field Service, Health -Covers missing at light pole -Provide protection for the service equipment from vehicle damage -Install weather-proof covers for the all outdoor receptacles, including the one inside trash enclosure. -Seal exterior wall penetration of gas piping -Install permanent occupant load signage at all assembly areas -The flexible raceway for the outdoor patio panic hardware is damaged -Cannot verify that the “Library” signage is UL listed -Receptacles located within 6 ft of the sink must be gfci-protected (mop sink, coffee serving area) -Protection of the water supply at: water filter, ice maker, coffee maker -Close off open electrical box above sink in mechanical rm behind cafe -Gfci protection for drinking fountain outlet -Provide permanent signage for restrooms -Install box extension for all receptacle boxes in IT room recessed from combustible wall finish -Provide compliance with NEC 110.16 -Paint rooftop gas piping for protection against corrosion -Uncover the sprinkler head in NE utility room -Verify that the sliding glass doors and swing door glazing are safety glazing **OK TO STOCK AND USE FOR TRAINING
Occupancy Inspection - Codes Commercial Failed 04/07/2021
Misc
Corrective Action Required
04/07/2021
-Approval required from: Planning, Field Service, Health -Covers missing at light pole -Provide protection for the service equipment from vehicle damage -Install weather-proof covers for the all outdoor receptacles, including the one inside trash enclosure. -Seal exterior wall penetration of gas piping -Install permanent occupant load signage at all assembly areas -The flexible raceway for the outdoor patio panic hardware is damaged -Cannot verify that the “Library” signage is UL listed -Receptacles located within 6 ft of the sink must be gfci-protected (mop sink, coffee serving area) -Protection of the water supply at: water filter, ice maker, coffee maker -Close off open electrical box above sink in mechanical rm behind cafe -Gfci protection for drinking fountain outlet -Provide permanent signage for restrooms -Install box extension for all receptacle boxes in IT room recessed from combustible wall finish -Provide compliance with NEC 110.16 -Paint rooftop gas piping for protection against corrosion -Uncover the sprinkler head in NE utility room -Verify that the sliding glass doors and swing door glazing are safety glazing **OK TO STOCK AND USE FOR TRAINING
Miscellaneous Correction
Corrective Action Required
04/07/2021
The minor plat and vacation of easement shall be recorded prior to receiving any type of occupancy.
Miscellaneous Correction
Corrective Action Required
04/07/2021
The facility has been released for stocking and training of staff. It has not been release to be opened to the public at this time.
Occupancy Inspection - Engineering Temporary C of O 4/28/2021 04/28/2021
Misc
Informational
04/28/2021
Establish 70% vegetation throughout the site.
Occupancy Inspection - Planning Passed 5/11/2021 5/11/2021 05/06/2021
Corrective Action Required
05/06/2021
The required ground cover along NE Colbern Rd must be installed prior to full CO. This will be addressed by Engineering.
Occupancy Inspection - Planning Passed 05/10/2021
Occupancy Inspection - Codes Commercial Temporary C of O 5/11/2021 5/11/2021 05/11/2021
Misc
Corrective Action Required
04/07/2021
-Provide protection for the service equipment from vehicle damage -Receptacles located within 6 ft of the sink must be gfci-protected (sink in coffee serving area) -Provide compliance with NEC 110.16
Miscellaneous Correction
Corrective Action Required
04/07/2021
The minor plat and vacation of easement shall be recorded prior to receiving any type of occupancy.
Miscellaneous Correction
Resolved
05/11/2021
The facility has been released for stocking and training of staff. It has not been release to be opened to the public at this time.
Occupancy Inspection - Engineering Temporary C of O 5/11/2021 5/11/2021 05/11/2021
Misc
Informational
04/28/2021
Establish 70% vegetation throughout the site.
Occupancy Inspection - Engineering Passed 07/26/2021
Misc
Informational
05/11/2021
Establish 70% vegetation throughout the site.
Occupancy Inspection - Codes Commercial Full C of O 7/26/2021 7/26/2021 07/26/2021
Misc
Resolved
07/26/2021
-Provide compliance with NEC 110.16
Miscellaneous Correction
Resolved
05/18/2021
The minor plat and vacation of easement shall be recorded prior to receiving any type of occupancy. Mike Weisenborn 05/18/2021 3:20 PM - Recorded documents have been provided.
Documents & Images
Date Uploaded File Type Document Name
02/21/2020 Application Form MCPL Colbern Rd Building Permit Application
02/21/2020 MCPL Colbern Rd Complete Set of Plans
02/21/2020 MCPL Colbern Rd Complete Set of Specs
02/21/2020 MCPL Colbern Rd Geotechnical Report
02/21/2020 MCPL Colbern Rd License Tax Application
02/21/2020 MCPL Colbern Rd Structural Calc Package
02/23/2020 Letter License Tax Bill
02/25/2020 Letter Fire Building Plan Review
02/27/2020 Letter DS P/R Corrections Document
03/19/2020 Letter Fire Building Plan Review
03/19/2020 Letter DS P/R Corrections Document
03/23/2020 Email New Food Establishment Plan Review - Approved FTG 0001228
03/26/2020 Letter Special Insp Letter
03/30/2020 Plans PRCOM20200445 Mid Continent Public Library Re-Submittal
03/30/2020 Letter Fire Building Plan Review
04/23/2020 Plans C6.0 UTILITY PLAN
04/27/2020 Receipt Receipt for transaction:2020-001744
06/01/2020 Plans Approved plans - MCPL Colbern Rd Complete Set of Plans
06/01/2020 Plans Approved - revised - C6.0 UTILITY PLAN
06/01/2020 Plans Approved - PRCOM20200445 Mid Continent Public Library Re-Submittal
06/01/2020 Plans Approved - ASI002 Replaced Sheets
06/01/2020 Letter Codes Plan Review Conditions
06/01/2020 Letter DS Building Permit
06/05/2020 Letter INSPECTION SUMMARY
06/08/2020 Letter INSPECTION SUMMARY
06/09/2020 Letter INSPECTION SUMMARY
06/10/2020 Letter INSPECTION SUMMARY
06/11/2020 Letter INSPECTION SUMMARY
06/12/2020 Letter INSPECTION SUMMARY
06/12/2020 Letter INSPECTION SUMMARY
06/15/2020 Letter INSPECTION SUMMARY
06/15/2020 Letter INSPECTION SUMMARY
06/16/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
06/17/2020 Letter INSPECTION SUMMARY
06/18/2020 Letter INSPECTION SUMMARY
06/19/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/22/2020 Letter INSPECTION SUMMARY
06/23/2020 Letter INSPECTION SUMMARY
06/25/2020 Letter INSPECTION SUMMARY
06/26/2020 Letter INSPECTION SUMMARY
07/09/2020 Letter INSPECTION SUMMARY
07/10/2020 Letter INSPECTION SUMMARY
08/19/2020 5140 R49 RS MC Public Library Colbern-FP1 30x42 1ST FLOOR
08/19/2020 Letter Fire (Sprinkler) Plan Review
09/14/2020 Letter INSPECTION SUMMARY
09/23/2020 Letter INSPECTION SUMMARY
09/25/2020 Letter INSPECTION SUMMARY
09/28/2020 Letter INSPECTION SUMMARY
09/29/2020 Letter INSPECTION SUMMARY
09/30/2020 Letter INSPECTION SUMMARY
10/07/2020 Letter INSPECTION SUMMARY
11/04/2020 Approved Plans MCPL Colbern Rd Complete Set of Plans
11/04/2020 Letter INSPECTION SUMMARY
11/05/2020 Approved Plans approved - MCPL Colbern Rd Complete Set of Plans0
11/06/2020 Letter INSPECTION SUMMARY
11/17/2020 Letter INSPECTION SUMMARY
11/17/2020 Letter INSPECTION SUMMARY
11/17/2020 Letter INSPECTION SUMMARY
11/18/2020 Letter INSPECTION SUMMARY
11/20/2020 Letter INSPECTION SUMMARY
12/16/2020 Letter INSPECTION SUMMARY
12/17/2020 Letter Fire (Alarm) Plan Review Notice
12/21/2020 Letter INSPECTION SUMMARY
12/31/2020 Letter INSPECTION SUMMARY
01/13/2021 Letter INSPECTION SUMMARY
01/13/2021 Letter Fire Loss Reduction Form
01/14/2021 Letter INSPECTION SUMMARY
01/15/2021 Letter INSPECTION SUMMARY
01/22/2021 Letter INSPECTION SUMMARY
01/27/2021 Letter INSPECTION SUMMARY
03/17/2021 Activity Document Backflow Test
03/24/2021 Letter Fire Loss Reduction Form
03/24/2021 Letter INSPECTION SUMMARY
03/24/2021 Letter Fire Loss Reduction Form
03/25/2021 3RD Party Insp Report FINAL SPECIAL INSPECTIONS REPORT
04/06/2021 Letter Fire Loss Reduction Form
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/06/2021 Letter INSPECTION SUMMARY
04/07/2021 Letter INSPECTION SUMMARY
04/07/2021 Letter INSPECTION SUMMARY
04/07/2021 Letter INSPECTION SUMMARY
04/28/2021 Letter INSPECTION SUMMARY
05/03/2021 3RD Party Insp Report Colbern Health Inspection - 04 12 21
05/06/2021 Letter INSPECTION SUMMARY
05/10/2021 Letter INSPECTION SUMMARY
05/11/2021 Letter INSPECTION SUMMARY
05/11/2021 Letter Codes Temporary Certificate of Occupancy
07/26/2021 Letter Codes Final Certificate of Occupancy
07/26/2021 Letter Field Certificate of Occupancy
07/28/2021 Email Re_ 1000 NE Colbern Rd - Library
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home