Property Review

Parcel Number: 52400110400000000


Property Details
52400110400000000
Active
VILLAGE AT DISCOVERY PARK---LOT 5
JACKSON
Legal
5
Addresses
Street # Pre-Direction Street Name Direction Unit # Status
1900 DISCOVERY AVE NE Active
1902 DISCOVERY AVE NE Active

Contacts
Type Description
Property Owner DPLS P1 LOT 5 LLC, Address:4240 PHILIPS FARM RD

Permit Applications
Permit # Type Work Class Status Date Issued
PRPWTC20254541 PW Temporary Traffic Control Permit Temporary Traffic Control Expired 10/22/2025
:

: Paving the entrance and road into the development. Trucks will need to back into the median to then back up into the site. Lanes will be closed intermittently and temporarily throughout the day s as the trucks need to back in. The road will not be closed the entire day.
PRPWTC20254485 PW Temporary Traffic Control Permit Temporary Traffic Control Expired 10/17/2025
:

: Paving the entrance and road into the development. Trucks will need to back into the median to then back up into the site. Lanes will be closed temporarily throughout the day as the trucks need to back in, but will not be closed the entire day.
PRPWTC20254479 PW Temporary Traffic Control Permit Temporary Traffic Control Voided
:

: Paving the entrance and road into the development. The trucks will need to back into the median to then back up into the site
PRPWRW20254469 Public Works Right of Way Permit PW ROW Temp Obstruction Denied
:

: Paving the entrance and road into the development. The trucks will need to pull into the cut in the median to then back up into the site. They will only need a traffic control permit, not a ROW permit.
PRPWRW20251487 Public Works Right of Way Permit PW ROW Electric Expired 04/22/2025
:

: Bore work for Evergy WR#M108133693
PRCOM20244782 Building Permit - Commercial NEW MULTI-FAMILY Issued 04/17/2025
:

: VILLAGE AT DISCOVERY PARK LOT #5 - NEW 3 STORY APARTMENT BUILDING WITH LOWER LEVEL LEASABLE COMMERCIAL SPACES 1902 NE Discovery Ave has been assigned for the 2nd water meter.
PRSITE20235732 Development - Site DEVELOPMENT COMPLETE Issued 04/25/2024
:

: PRIVATE INFRASTRUCTURE ASSOCIATED WITH THE PAD SITE DEVELOPMENT FOR THE VILLAGE AT DISCOVERY PARK.
PRSUBD20232726 Public Infrastructure DEVELOPMENT COMPLETE Substantial Completion 11/07/2023
:

: VILLAGE AT DISCOVERY PARK - MASS GRADING IN ZONES 1, 2 & 4, PUBLIC WATER, STORM SEWER, SANITARY SEWER, TURNLANE IMPROVEMENTS TO DOUGLAS STREET.
Planning Applications
Permit # Type Status Date Closed
PL2025082 Vacation of Utility Easement Approved 10/08/2025
: Discovery Park, Lot 7 - Vacation of Utility Easement

: Vacation of a 30-foot utility easement to accommodate 5-ft building shift
PL2024136 Commercial Final Development Plan Approved 09/11/2024
: Village at Discovery Park, Lot 5-8

: Two Mixed Use Buildings, Animal Hospital, Animal Daycare
PL2023158 Commercial Final Development Plan Approved 10/31/2023
: VILLAGE AT DISCOVERY PARK - Final Development Plan - infrastructure

: PRIVATE INFRASTRUCTURE ASSOCIATE WITH LOT DEVELOPMENT.
PL2023146 Engineering Plan Review Approved 10/25/2023
: THE VILLAGE AT DISCOVERY PARK PHASE 1- MASS GRADING, DETENTION BASIN, AND ESC

: MASS GRADING, DETENTION AND ESC FOR MULTIPLE LOT DEVELOPMENT
PL2023143 Engineering Plan Review Approved 02/16/2024
: THE VILLAGE AT DISCOVERY PARK - Offsite Traffic Improvements

:
PL2023142 Final Plat Recorded 12/20/2023
: The Village at Discovery Park (Lots 1 thru 13 inclusive and Tracts A & B)

:
PL2023011 Commercial Rezoning with Preliminary Development Plan Expired 07/28/2023
: DISCOVERY PARK - Zone 1

:
PL2021496 Pre-Application Complete
: 'Discovery Park - Lee's Summit' - A Proposed Mixed-Use Development

: Applicant: Wesley Fields w/BCLP (816) 391-7667 / wofields@bclplaw.com Per Ryan, 90 minute Zoom pre-app needed, and Fri 1/7/22 at 2-3:30pm is acceptable. Documents forthcoming prior to pre-app call.







Effective July 1, 2025, a Parks Impact Fee on new development went into effect. The fee, $250.00 per bedroom with a cap of four bedrooms per living unit on residential projects and a $0.20 pre gross square foot area on non-residential projects will be required prior to issuance of the building permit. If you request additional information or have any questions about this fee or development-related fees, please contact your Project Manager.