Permit Application Status

PRCOM20260729


In order to schedule inspections, you need to be signed in.

 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PRCOM20260729
Building Permit - Commercial
In Plan Review
DPLS P1 LOT 5 LLC
NEW TENANT FINISH
YOGA 6 - NEW TENANT FINISH FOR YOGA STUDIO
02/20/2026
09/12/2026
Locations
Contacts
Intrinsic Development, L.L.C., Address:3622 Endeavor Ave., Ste. 101  
Brian Maenner - Intrinsic Development, Phone:(573) 881-0280  
LGHVAC Mechanical, Address:3616 Utica Square Dr., Phone:(918) 351-3092  
Reks Contractors Inc, Address:2660 Springbluff Ct  
  
SAI Architecture, Address:210 Park Ave, Phone:(573) 874-1818  
DPLS P1 LOT 5 LLC, Address:4220 PHILIPS FARM RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Building Plan Review Approved with Conditions 03/25/2026 03/18/2026
Joe Frogge
License Tax - Payment
Corrective Action Required
03/18/2026

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $6,682.50. 3/16/2026 - Acknowledged in letter.
IBC 2902.2 Separate facilities - fixture
Resolved
03/18/2026

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Label restrooms per gender or submit application for Code Modification Request (CMR) to use 2021 code cycle which allows coed. 3/16/2026 - Not Addressed.
IBC 1109.12.9 Point of sale and service counters - accessibility
Corrective Action Required
03/18/2026

2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Comment is informational. Reception desk must be accessible (min. 3 linear feet at maximum 36" high) To be field verified. 3/16/2026 - Acknowledged in letter.
Fire Plan Review Approved 03/25/2026 03/18/2026
Joe Frogge
Licensed Contractors Rejected 03/18/2026 03/18/2026
Joe Frogge
LC - MEP Subs
Corrective Action Required
03/18/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Flow-Right Plumbing not currently licensed with us) 3/16/2026 - Acknowledged in letter.
Building Plan Review Rejected 03/17/2026 03/16/2026
Joe Frogge
License Tax - Payment
Corrective Action Required
03/10/2026

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $6,682.50. 3/16/2026 - Acknowledged in letter.
Suite address
Resolved
03/16/2026

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Comment is informational. This suite has been assigned the address of 1900 NE Discovery Ave, Unit:122. Please update your records and inform your client.
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
03/10/2026

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Label restrooms per gender or submit application for Code Modification Request (CMR) to use 2021 code cycle which allows coed. 3/16/2026 - Not Addressed.
IBC 1209.2 Finish materials
Resolved
03/16/2026

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant materials at mop sink. If paint is used it must be epoxy based.
IBC 1606.2 Design dead load - structural
Resolved
03/16/2026

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Actions required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by ceiling mounted furnaces and roof mounted condensing units. (or relocate to match structural engineer's shell plans)
IBC 1109.12.9 Point of sale and service counters - accessibility
Corrective Action Required
03/10/2026

2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Comment is informational. Reception desk must be accessible (min. 3 linear feet at maximum 36" high) To be field verified. 3/16/2026 - Acknowledged in letter.
Licensed Contractors Rejected 03/17/2026 03/16/2026
Joe Frogge
LC - General Contractor
Resolved
03/16/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
03/10/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Flow-Right Plumbing not currently licensed with us) 3/16/2026 - Acknowledged in letter.
Fire Plan Review Approved 03/17/2026 03/12/2026
Craig Hill
Fire Plan Review Approved 02/26/2026 02/26/2026
Craig Hill
Construction documents for fire alarm systems
Corrective Action Required
02/26/2026

2018 IFC 907.1.1- Construction documents. Construction documents for fire alarm systems shall be submitted for review and approval prior to system installation. Construction documents shall include, but not be limited to, all of the following: 1. .A floor plan which indicates the use of all rooms. 2. Locations of alarm-initiating and notification appliances. 3. Alarm control and trouble signaling equipment. 4. Annunciation. 5. Power connection. 6. Battery calculations. 7. Conductor type and sizes. 8. Voltage drop calculations. 9. Manufacturers, model numbers and listing information for equipment, devices and materials. 10. Details of ceiling height and construction. 11. The interface of fire safety control functions. Action Required: Provide deferred submittal for fire alarm system.
Construction documents - Fire protection systems
Corrective Action Required
02/26/2026

2018 IFC 901.2- Construction documents. The fire code official shall have the authority to require construction documents and calculations for all fire protection systems and to require permits be issued for the installation, rehabilitation or modification of any fire protection system. Construction documents for fire protection systems shall be submitted for review and approval prior to system installation. Action Required: Provide deferred submittal for fire protection system.
Building Plan Review Rejected 02/26/2026 02/25/2026
Joe Frogge
License Tax - Payment
Corrective Action Required
02/25/2026

A one-time impact fee in the form of an excise tax must be collected before occupancy can be granted. Please be advised that additional application, review, and inspection fees do apply and additional information pertaining to this will be provided during that stage of your approval process. Action required: Comment is informational. The fee will be $6,682.50.
Suite address
Corrective Action Required
02/25/2026

This structure has been assigned one address. All suites/apartments shall be assigned an address by the owner which can be numeric, alphabetic or a combination of both. If the building has multiple stories the suite/apartment number shall start with a number representing the floor on which the unit is located. Action required: Comment is informational. This suite has been assigned the address of 1900 NE Discovery Ave, Unit:122. Please update your records and inform your client.
IBC 2902.2 Separate facilities - fixture
Corrective Action Required
02/25/2026

2018 IBC 2902.2 Separate Facilities. Where plumbing fixtures are required, separate facilities shall be provided for each sex. (see code for exceptions) Action required: Label restrooms per gender or submit application for Code Modification Request (CMR) to use 2021 code cycle which allows coed.
IBC 1209.2 Finish materials
Corrective Action Required
02/25/2026

2018 IBC 1209.2 Finish Materials. Walls, Floors and partitions in toilet and bathrooms shall comply with Sections 209.2.1 through 1209.2.4. 2018 1209.2.1 Floors and wall bases. In other than dwelling units, toilet, bathing and shower room floor finish materials shall have a smooth, hard, nonabsorbent surface. The intersections of such floors with walls shall have a smooth, hard, nonabsorbent vertical base that extends upward onto the walls not less than 4 inches. 2018 1209.2.2 Walls and partitions. Walls and partitions within 2 feet of service sinks, urinals and water closets shall have a smooth, hard, nonabsorbent surface, to a height of not less than 4 feet above the floor, and except for structural elements, the materials used in such walls shall be of a type that is not adversely affected by moisture. (See code section for possible exceptions.) 1209.2.3 Showers. (see code for details) 1209.2.4 Waterproof joints. (see code for details) Action required: Specify compliant materials at mop sink. If paint is used it must be epoxy based.
IBC 1606.2 Design dead load - structural
Corrective Action Required
02/25/2026

2018 IBC 1606.2 Design dead load. For purposes of design, the actual weights of materials of construction and fixed service equipment shall be used. In the absence of definite information, values used shall be subject to the approval of the building official. Actions required: Provide engineer’s report to verify that existing roof structure will support additional load imposed by ceiling mounted furnaces and roof mounted condensing units. (or relocate to match structural engineer's shell plans)
IBC 1109.12.9 Point of sale and service counters - accessibility
Corrective Action Required
02/25/2026

2018 IBC 1109.12.3 Point of sale and service counters. Where counters are provided for sales or distribution of goods or services, at least one of each type provided shall be accessible. Where such counters are dispersed throughout the building or facility, accessible counters shall also be dispersed. Action required: Comment is informational. Reception desk must be accessible (min. 3 linear feet at maximum 36" high) To be field verified.
Licensed Contractors Rejected 02/26/2026 02/25/2026
Joe Frogge
LC - General Contractor
Corrective Action Required
02/25/2026

Lee's Summit Code of Ordinance, Section7-130.10 - Business License. It shall be unlawful for any person to engage in the construction contracting business without first obtaining a business license as required under the applicable provisions of Chapter 28 of the Lee's Summit Code of Ordinances. Action required: Provide the name, email address & phone number for the on-site contact.
LC - MEP Subs
Corrective Action Required
02/25/2026

Lee's Summit Code of Ordinance, Section7-130.4 - Business License. (excerpt) No person, other than a licensed contractor or employees of a licensed contractor, shall engage in electrical, plumbing or mechanical business, construction, installation or maintenance unless duly licensed in accordance with this section. Action required: MEP subcontractors are required to be listed on permit. Provide company names of licensed MEP contractors. (Flow-Right Plumbing not currently licensed with us)
Alarm Plan Review Pending
Craig Hill
Sprinkler Plan Review Pending
Craig Hill
Inspections

There are no inspections for this permit application.

Documents & Images
Date Uploaded File Type Document Name
02/20/2026 Application Form Yoga 6- Commercial Permit Application
02/20/2026 Plans _Yoga 6 - Full Set
02/20/2026 Letter License Tax Bill
02/27/2026 Letter DS P/R Corrections Document
03/10/2026 Plans _Yoga 6- FULL SET - REV1
03/10/2026 Letter SAI Response- city comments
03/16/2026 Letter DS P/R Corrections Document
03/18/2026 Letter SAI Response- city comments- 2nd round
03/18/2026 Plans _Yoga 6 - FULL SET - REV2
03/18/2026 Approved Plans Approved construction plan
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New permit, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home