Cobey Creek Clubhouse and Outdoor Pool
Commercial Final Development Plan
Commercial Final Development Plan
In Plan Review
02/26/2025
CLAYTON PROPERTIES GROUP INC
New clubhouse facility and outdoor pool
Locations
Contacts
CLAYTON PROPERTIES GROUP INC, Address:120 SE 30TH DR  
Marshall Fief, Address:8455 College Boulevard, Phone:(316) 213-3964  
Reviews
Review Type Outcome Est. Completion Date Completed
Planning Review Approved with Conditions 04/29/2025 04/29/2025
Hector Soto Jr.
Corrective Action Required
04/29/2025

PLATTING. The Community Center is proposed on a partially platted piece of property. No building permit may be issued for the subject property until such time as the associated plat titled Cobey Creek, 2nd Plat is approved by City Council and recorded with the County. The previously made comment above was acknowledged by the applicant on the plan resubmittal. The comment is being kept for documentation purposes that no permit can be issued on the subject clubhouse development until the associated plat is approved and recorded.
Engineering Review Corrections 04/29/2025 04/29/2025
Gene Williams, P.E.
Corrective Action Required
04/29/2025

Sheet C104: See previous applicant letter. Direct connection of the private sanitary sewer lateral (i.e., the 4 inch PVC line) cannot be made to the manhole. It shall be a wye connection, a minimum of 4 feet from the manhole as measured from the outside of the manhole, to the first portion of the wye.
Building Codes Review Approved with Conditions 04/29/2025 04/25/2025
Joe Frogge
Miscellaneous Correction
Corrective Action Required
04/22/2025

This review is for the site only. Architectural plans are not being reviewed under this process. Action required: Comment is informational.
Miscellaneous Correction
Corrective Action Required
04/22/2025

Designs for sport court not provided. Action required: Comment is informational. If fence is taller than 6' and is built such as that it would see a wind load a complete engineered design will be required. 4/25/25 - Acknowledged in letter.
Miscellaneous Correction
Resolved
04/25/2025

Water tap and pipe between main and meter must be 2".
Miscellaneous Correction
Resolved
04/25/2025

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.2 Building sewers. Building sewers smaller than 8 inches shall have cleanouts located at intervals of not more than 100 feet. Building sewers 8 inches and larger shall have a manhole located not more than 200 feet from the junction of the building drain and the building sewer and at intervals of not more than 400 feet. The interval length shall be measured from the cleanout or manhole opening, along the developed length of the piping to the next drainage fitting providing access for cleaning, a manhole or the end of the building sewer. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide a cleanout close to where sanitary leaves the building and then at maximum 100' spacing in yard. 4/25/25 - Acknowledged in letter.
Miscellaneous Correction
Corrective Action Required
04/22/2025

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (condensing units, etc.) 4/25/25 - Accomplished via landscaping. To be field verified.
Traffic Review No Comments 04/29/2025 04/22/2025
Scott Ready
Fire Review Approved with Conditions 04/29/2025 04/22/2025
Scott Ready
Code Statement
Corrective Action Required
04/22/2025

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Review Approved with Conditions 03/13/2025 03/13/2025
Scott Ready
Code Statement
Corrective Action Required
03/13/2025

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Building Codes Review Corrections 03/13/2025 03/13/2025
Joe Frogge
Miscellaneous Correction
Corrective Action Required
03/13/2025

This review is for the site only. Architectural plans are not being reviewed under this process. Action required: Comment is informational.
Miscellaneous Correction
Corrective Action Required
03/13/2025

Designs for sport court not provided. Action required: Comment is informational. If fence is taller than 6' and is built such as that it would see a wind load a complete engineered design will be required.
Miscellaneous Correction
Corrective Action Required
03/13/2025

Water tap and pipe between main and meter must be 2".
Miscellaneous Correction
Corrective Action Required
03/13/2025

2018 IPC 708.1 Cleanouts Required. Cleanouts shall be provided for drainage piping in accordance with Sections 708.1.1 through 708.1.11. 2018 IPC 708.1.2 Building sewers. Building sewers smaller than 8 inches shall have cleanouts located at intervals of not more than 100 feet. Building sewers 8 inches and larger shall have a manhole located not more than 200 feet from the junction of the building drain and the building sewer and at intervals of not more than 400 feet. The interval length shall be measured from the cleanout or manhole opening, along the developed length of the piping to the next drainage fitting providing access for cleaning, a manhole or the end of the building sewer. 2018 IPC 708.1.3 Building drain and building sewer junction. The junction of the building drain and the building sewer shall be served by a cleanout that is located at the junction or within 10 feet of the developed length of piping upstream of the junction. For the requirements of this section, the removal of a water closet shall not be required to provide cleanout access. Action required: Provide a cleanout close to where sanitary leaves the building and then at maximum 100' spacing in yard.
Miscellaneous Correction
Corrective Action Required
03/13/2025

Unified Development Ordinance Article 8, Section 8.180.F Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Action required: Make needed corrections to drawings that provide details as to how mechanical equipment will be screened from all 4 sides per referenced UDO section. (condensing units, etc.)
Engineering Review Corrections 03/13/2025 03/13/2025
Gene Williams, P.E.
Corrective Action Required
03/13/2025

Sheet C103: 1. Private sanitary sewer lateral is shown with a direct-connection to a public sanitary sewer manhole. A wye shall be required a minimum of 4 feet from the outside of the manhole as measured to the first part of the wye (not the center of the wye). 2. Private storm structures are shown within a public easement. Private storm structures shall be outside the limits of easements. 3. The stormwater system on the north side of the project along the property line shall be public, and shall require the submittal of separate public stormwater plans.
Corrective Action Required
03/13/2025

Sheet C100: 1. A versalock retaining wall is shown encroaching into a public easement. Retaining walls shall be outside the limits of any easement, including the foundation of the retaining wall. 2. If retaining wall is proposed anywhere on the site, provide a drawing of the retaining wall in profile. 3. PCC KCMMB concreter shall be required from the right of way line to the sawcut on all commercial entrances.
Corrective Action Required
03/13/2025

Sheet C106: 1. Typical section view of pavement was missing the KCMMB designation for asphaltic concrete. KCMMB asphaltic concrete shall be required and shall be noted on the plans. 2. Typical section view of pavement section was missing geogrid or chemically-stabilized subgrade. 3. Typical section view shows 12 inches of aggregate, which is more than required by the Design and Construction Manual. Although this is acceptable, it is worth noting. 4. Subgrade shall be extended a minimum of one (1) foot beyond the back of curb, and either show this on the City standard detail, or provide a separate typical section showing the minimum extension.
Corrective Action Required
03/13/2025

The following sheets were missing: 1. Detail plan sheet of all ADA-accessible ramps and five (5) foot ADA-accessible routes across the new commercial entrances, including elevation callouts and slope callouts. Generic detail is not sufficient. 2. Plan and profile views of the private storm system, including superimposition of the design HGL on the profile view and the word "PRIVATE" on the profile view. 3. Stormwater calculations in the form of a table.
Corrective Action Required
03/13/2025

Sheet C101: 1. Turning spaces at the junction of the public sidewalk and the private sidewalk serving the playground shall be required, and shall be detailed on the plans with slope callouts. Slope shall be less than 1.5% in all directions, including the diagonal. 2. Turning space west of the westernmost commercial entrance where the public sidewalk intersects with a private sidewalk shall be detailed on the plans with slope callouts.
Corrective Action Required
03/13/2025

SWPPP may be required if site disturbed area greater than 1 acre.
Corrective Action Required
03/13/2025

Signed and sealed itemized cost estimate required prior to formal approval, and shall include sitework. In lieu of a signed and sealed cost estimate, an itemized contract may be submitted.
Planning Review Corrections 03/13/2025 03/11/2025
Hector Soto Jr.
Corrective Action Required
03/10/2025

PLATTING. The Community Center is proposed on a partially platted piece of property. No building permit may be issued for the subject property until such time as the associated plat titled Cobey Creek, 2nd Plat is approved by City Council and recorded with the County.
Corrective Action Required
03/10/2025

LOT INFORMATION. Label the lot line dimensions and bearings on the site plan.
Corrective Action Required
03/10/2025

STREETS. Label the right-of-way widths for both SE Cobey Creek Dr and SE Carter Rd.
Corrective Action Required
03/10/2025

SIDEWALKS. Label the widths of the public sidewalks along both SE Cobey Creek Dr and SE Carter Rd. 5' sidewalks are required along both street frontages.
Corrective Action Required
03/10/2025

RETAINING WALLS. The plans show a retaining wall to be constructed within the 15' U/E along the west property line. The City's Encroachment Policy does not allow retaining walls to be constructed within a utility easement.
Corrective Action Required
03/10/2025

LIGHTING. 1) Submit a photometric plan compliant with UDO Section 8.230 that indicates the foot-candle levels throughout the site and at the property lines. The maximum allowed vertial foot-candle at a property line shared with a residential property is 0.5 foot-candles, measured at 3' above finished grade. 2) The lighting plan shows a total of 3 pole-mounted lights being used on the site. What, if any, wall-mounted light fixtures will be used on-site? Any wall-mounted light fixtures shall comply with UDO Sections 8.260, 8.270 and 8.280. Please note that lighting of the swimming pool area, except by low level bollard type lighting or wall pack with 90-degree cutoffs, shall only be provided by special use permit.
Corrective Action Required
03/10/2025

TREE PLANTING AREAS. Tree planting areas shall be no less than 10 feet in width. No tree shall be located less than 4 feet from the back of curb. All parking lot landscape islands, strips or other planting areas shall be curbed with minimum 6 inch high curbs. The island on the west side of the entrance into the northern parking lot section doesn't meet the minimum 10' island width requirement, nor the minimum 4' separation between the tree location and the nearest edge of pavement.
Corrective Action Required
03/11/2025

ZONING. Revise the zoning information listed on Sheet C100 to include PMIX (Planned Mixed Use). The property is zoned PMIX, but is also located within the M-150 CDO as currently listed on the plan sheet.
Traffic Review No Comments 03/13/2025 03/07/2025
Erin Ralovo
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $725.00 $725.00 Paid 02/28/2025
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home