Review Type |
Outcome |
Est. Completion Date |
Completed |
Fire Review
|
Approved with Conditions
|
01/08/2025
|
01/08/2025
|
|
Scott Ready
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Water Supply
Corrective Action Required
IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.
Confirm with Water Utilities that the area water infrastructure will supply the required fire flow per IFC Table B105.1(2) with a 50% reduction for the automatic sprinkler system.
12/11/20- Still to be determined.
|
|
Misc.
The 6,900 S.F. building may need additional fire protection based on use.
|
|
Miscellaneous Correction
Corrective Action Required
An automatic fire sprinkler system is required for the building. Show the location of the sprinkler main going to the building.
|
|
|
Engineering Review
|
Approved with Conditions
|
01/08/2025
|
01/08/2025
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #09 FDP Reviews
Corrective Action Required
Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
|
Planning Review
|
No Comments
|
01/08/2025
|
01/06/2025
|
|
Adair Bright
|
|
|
Traffic Review
|
Corrections
|
01/08/2025
|
01/03/2025
|
|
Erin Ralovo
|
|
Corrective Action Required
Staff acknowlegs the letter from the church allowing the construction of the parking lot. The letter does not address the added traffic traveling through their lot and the added liability of that traffic if the souther entrance onto new North/south road isn't built.
|
|
|
Fire Review
|
Approved with Conditions
|
12/30/2024
|
12/30/2024
|
|
Jim Eden
|
|
Code Statement
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Fire Lanes - Marking
IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Areas along fire lanes and in front of hydrants shall be posted.
|
|
Water Supply
Corrective Action Required
IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.
Confirm with Water Utilities that the area water infrastructure will supply the required fire flow per IFC Table B105.1(2) with a 50% reduction for the automatic sprinkler system.
12/11/20- Still to be determined.
|
|
Misc.
The 6,900 S.F. building may need additional fire protection based on use.
|
|
Miscellaneous Correction
Corrective Action Required
An automatic fire sprinkler system is required for the building. Show the location of the sprinkler main going to the building.
|
|
|
Planning Review
|
No Comments
|
12/30/2024
|
12/30/2024
|
|
Adair Bright
|
|
Miscellaneous Correction
Corrective Action Required
|
|
|
Engineering Review
|
Approved with Conditions
|
12/30/2024
|
12/30/2024
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #09 FDP Reviews
Corrective Action Required
Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
|
Traffic Review
|
Corrections
|
12/30/2024
|
12/23/2024
|
|
Erin Ralovo
|
|
Corrective Action Required
If the church refuses to build the new southern access on NW Summit Drive, staff requests letter from the church acknowledging that they understand there will likely be increased traffic traveling through their parking lot going to the Chipman Road in order to go south on View High or east on Chipman Road.
|
|
|
Traffic Review
|
Corrections
|
12/17/2024
|
12/18/2024
|
|
Erin Ralovo
|
|
Plans seem to indicate that the parking lot improvments on the church side of the de3velopkment are included with this application. However, i talks with staff and your response letter it is indicated that these are future improvements to be done by the church. If these are not included with this application, all dimentions and linework should be greyed/removed to indicate future installation.
|
|
The eastern mid-block crossing is not acceptable as it is unexpected and not at a driveway. Please move this crossing to line up with the drive on the east side of the building.
|
|
The path along View High will need to be a 10 FT Shared Use Path rather than a 10 FT sidewalk.
|
|
A full review of the TIS was not completed. Further comments on the TIS will be forthcoming from traffic at a later time.
|
|
Address how trip generation is handled for pickleball courts, could be 490 - Tennis Courts or 495 - Recreational Community Center and included in the square footage of the building.
|
|
I think the discrepancy on the square footage of the building has been resolved. The TIS shows 157,181 SF and sheet 1 of the plans showed 164,081 SF. The difference is 6,900 SF which is the commercial building. Disregard previous comment.
|
|
Corrective Action Required
We would like to see the church access moved from Ashurst to directly across from the Commercial building access. If the church is opposed to removing the existing access, they can keep that access in addition to the new access. Without the new access point, the church can expect to receive a lot of cut-through traffic leaving the sports complex to get to the signal at Chipman.
|
|
In the Traffic Study, where it mentions a median break I would prefer that is more specific and called either a 3/4 access or a Left-In-Right-In-Right-Out. It is mentioned earlier in the report so this is just a clarification in case someone jumps right to the Recommendations page.
|
|
|
Planning Review
|
Corrections
|
12/17/2024
|
12/17/2024
|
|
Adair Bright
|
|
Miscellaneous Correction
Corrective Action Required
These comments have been modified on 12/19/24 to address the initial review comment and the discussion had between staff and the applicant. I am just updating these to reflect the current understanding.
One additional item needed was clarification on when the additional stalls on the church site would be provided. These edits were made prior to the review of the items resubmitted on 12/19/24.
|
|
Miscellaneous Correction
Corrective Action Required
Initial Comment: Confirm that you are providing adequate ADA parking. Also, update the parking notes on C100 to include those stall counts.
Discussed Verbally 12/19: The comment was redundant. The table on Sheet C100 needed updated to reflect the ADA stall count being provided.
|
|
Miscellaneous Correction
Corrective Action Required
Initial Comment: Provide ADA stall dimensions.
Addressed Verbally 12/19: Staff and Applicant discussed the addition of a dimension on an ADA stall to be called out as typical.
|
|
Miscellaneous Correction
Corrective Action Required
Initial Comment: I assume you are planning on preserving some existing vegetation along the east side. Please show an outline and a rough estimate of the amount of trees you are intending to keep.
Addressed Verbally 12/19: Staff and Applicant discussed the addition of a hatched area depicting the existing vegetation intending to be preserved.
|
|
Miscellaneous Correction
Corrective Action Required
Initial Comment: Staff is not supportive of waiving the fence requirement to the south. Even though a 6-ft. tall fence is not going to conceal a >30-ft. tall building, it is also about providing a physical barrier between such differing land uses.
Addressed Verbally 12/19: Applicant stated this is understood and they will either move forward with the modification request or be agreeable to additional landscaping. (Please correct me on this if I'm incorrect or misunderstood.)
|
|
Miscellaneous Correction
Corrective Action Required
Initial Comment: Your response letter stated the north/south drive adjacent to the church will be public, but the landscape plan calls it out as private.
Addressed Verbally 12/19: Applicant stated the landscape plan will be updated.
|
|
Miscellaneous Correction
Corrective Action Required
Please note that signs are shown for illustrative purposes only.
|
|
Miscellaneous Correction
Corrective Action Required
Initial Comment: Confirm adequate width is being provided in landscaping islands for the trees being proposed - minimum of 10-ft. is required.
Addressed Verbally 12/19: Applicant stated the deciduous trees will be removed and evergreens and/or shrubs will remain.
|
|
|
Engineering Review
|
Approved with Conditions
|
12/17/2024
|
12/17/2024
|
|
Sue Pyles, P.E.
|
|
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
|
|
DE C&O #03 Eng & Insp Fees
Corrective Action Required
All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
|
|
DE C&O #04 Cert FA or Escrow
Corrective Action Required
All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
|
|
DE C&O #06 Land Disturbance
Corrective Action Required
A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
|
|
DE C&O #09 FDP Reviews
Corrective Action Required
Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
|
|
DE C&O #11 Pavement Thickness
Corrective Action Required
Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
|
|
|
Fire Review
|
Approved with Conditions
|
12/17/2024
|
12/11/2024
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Fire Lanes - Marking
Corrective Action Required
IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Areas along fire lanes and in front of hydrants shall be posted.
|
|
FDC
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Show the location of the FDC.
|
|
Water Supply
Corrective Action Required
IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.
Confirm with Water Utilities that the area water infrastructure will supply the required fire flow per IFC Table B105.1(2) with a 50% reduction for the automatic sprinkler system.
12/11/20- Still to be determined.
|
|
Misc.
Corrective Action Required
The 6,900 S.F. building may need additional fire protection based on use.
|
|
Miscellaneous Correction
Corrective Action Required
An automatic fire sprinkler system is required for the building. Show the location of the sprinkler main going to the building.
|
|
|
Traffic Review
|
Corrections
|
11/22/2024
|
11/25/2024
|
|
Susan Barry, P.E.
|
|
Corrective Action Required
The church parking lot should tie in on the new street across from the commercial property. Once this connection is made, the driveway on Ashurst should go away.
|
|
Corrective Action Required
A sidewalk connection should be added on the west side of the development into the church parking lot.
|
|
Corrective Action Required
A traffic Study is required. KCMO should also review the TIS and any requirements from them will need to be submitted to the City.
|
|
Corrective Action Required
Sidewalk on the north side of Ashurst approaching View High appears to be within 2 FT of the back of curb and therefore should transition to 6 FT wide. Also the tie-in to the ramp is not compliant and will need to be adjusted.
|
|
Corrective Action Required
A 10' shared use path will be required along View High for the extent of the properties being developed.
|
|
Corrective Action Required
If shared parking is proposed, sidewalks should be built to connect parking lots to both buildings.
|
|
|
Engineering Review
|
Corrections
|
11/22/2024
|
11/22/2024
|
|
Sue Pyles, P.E.
|
|
Corrective Action Required
General:
• Please label the rights-of-way throughout the plan set.
• Please indicate whether sidewalk is existing or proposed.
• Please include pavement section(s) and indicate location.
|
|
Corrective Action Required
Sheet C.100:
• Please replace the PW Inspection information with Development Services in the Utility Company list.
• Please revise the Site Improvement Storm Water Detention Note to reflect this project.
• Please revise the utility labels for clarity.
|
|
Corrective Action Required
Sheet C.100: Please show and label the detention basin.
|
|
Corrective Action Required
Sheet C.206: Please show and label, with dimensions and elevation, the emergency spillway.
|
|
|
Planning Review
|
Corrections
|
11/22/2024
|
11/22/2024
|
|
Adair Bright
|
|
Miscellaneous Correction
Corrective Action Required
Provide a rezoning exhibit and a legal description of the property being rezoned.
|
|
Miscellaneous Correction
Corrective Action Required
Provide ADA stalls.
|
|
Miscellaneous Correction
Corrective Action Required
The north arrow on sheet C.100 is covering some text. Please scoot it over.
|
|
Miscellaneous Correction
Corrective Action Required
Provide individual parking stall width on the conceptual commercial.
|
|
Miscellaneous Correction
Corrective Action Required
Provide setbacks to the south & east property lines on the conceptual commercial.
|
|
Miscellaneous Correction
Corrective Action Required
Provide setbacks to the outdoor soccer field.
|
|
Miscellaneous Correction
Corrective Action Required
Provide a parking memo justifying the amount of parking spaces provided.
|
|
Miscellaneous Correction
Corrective Action Required
Not all parking stalls meet UDO requirements. Stalls shall be 9ft. wde by 19-ft. long.
Also, an interpretation has been made and enforced in the past that no part of the curb shall be included in those measurements.
|
|
Miscellaneous Correction
Corrective Action Required
Provide setback dimensions to the parking lots.
|
|
Miscellaneous Correction
Corrective Action Required
With the church parking lot being expanded, all new stalls shall meet current code requirements. Dimension this on the plan.
|
|
Miscellaneous Correction
Corrective Action Required
Although the landscaping is conceptual, it looks quite sparse. I suggest double checking the code requirements because you will be required a High Impact buffer along the east side which could affect the proposed grading or require a modification.
|
|
Miscellaneous Correction
Corrective Action Required
Given modifications will be requested for the amount of metal proposed, staff highly suggests increasing the amount of visual interest in the building by providing varying roof heights, vertical relief through insets, and perhaps more color. It is also recommended to double check the calculations concerning percentage of material types as some seem off.
|
|
Miscellaneous Correction
Corrective Action Required
As a heads up on some items - all roof top equipment must be screened on all sides, people will probably ask about the lighting given the proximity to residential, and light poles are capped at 15-ft. in height when located within 100-ft. of a residential district or use.
|
|
Miscellaneous Correction
Corrective Action Required
Questions:
Is the north/south drive adjacent to the church private or public?
Will there be any proposed fencing? If yes, can you provide a fence detail?
For the sidewalk to the south of the parking stalls abutting the building, is it possible to connect that into the sidewalk going east to provide better pedestrian accessibility?
|
|
Miscellaneous Correction
Corrective Action Required
If there is a shared parking agreement with the church being proposed, you must provide pedestrian connections to get across the street.
|
|
Miscellaneous Correction
Corrective Action Required
I know you may not have all your sign specs narrowed down yet, but if you do and would like any modifications (quantity, size, etc.) we can roll that into the PDP. Otherwise, you will have to go back to Planning Commission at a later date for any modifications to the sign code.
|
|
|
Fire Review
|
Corrections
|
11/22/2024
|
11/12/2024
|
|
Jim Eden
|
|
Code Statement
Corrective Action Required
All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
|
|
Fire Lanes - Marking
Corrective Action Required
IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility.
Areas along fire lanes and in frot of hydrants shall be posted.
|
|
FDC
Corrective Action Required
IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official.
Show the location of the FDC.
|
|
Water Supply
Corrective Action Required
IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction.
Confirm with Water Utilities that the area water infrastructure will supply the required fire flow per IFC Table B105.1(2) with a 50% reduction for the automatic sprinkler system.
|
|
Misc.
Corrective Action Required
The 6,900 S.F. building may need additional fire protection based on use.
|
|
|