Planning Application Status

PL2024283




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2024283
View High Sports Complex
Commercial Rezoning with Preliminary Development Plan
Commercial Rezoning with Preliminary Development Plan
Approved
11/08/2024
THE UNITED METHODIST CHURCH OF LEES SUMM
New 164,000 sf facility
Locations
Contacts
ENGINEERING SOLUTIONS, Address:50 SE 30TH ST, Phone:(816) 623-9888  
THE UNITED METHODIST CHURCH OF LEES SUMM, Address:3381 NW CHIPMAN RD  
Reviews
Review Type Outcome Est. Completion Date Completed
Fire Review Approved with Conditions 01/08/2025 01/08/2025
Scott Ready
Code Statement
Informational
12/31/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Water Supply
Corrective Action Required
12/31/2024

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Confirm with Water Utilities that the area water infrastructure will supply the required fire flow per IFC Table B105.1(2) with a 50% reduction for the automatic sprinkler system. 12/11/20- Still to be determined.
Misc.
Informational
12/31/2024

The 6,900 S.F. building may need additional fire protection based on use.
Miscellaneous Correction
Corrective Action Required
12/31/2024

An automatic fire sprinkler system is required for the building. Show the location of the sprinkler main going to the building.
Engineering Review Approved with Conditions 01/08/2025 01/08/2025
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
12/31/2024

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
12/31/2024

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
12/31/2024

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #06 Land Disturbance
Corrective Action Required
12/31/2024

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
12/31/2024

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
12/31/2024

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Planning Review No Comments 01/08/2025 01/06/2025
Adair Bright
Traffic Review Corrections 01/08/2025 01/03/2025
Erin Ralovo
Corrective Action Required
01/03/2025

Staff acknowlegs the letter from the church allowing the construction of the parking lot. The letter does not address the added traffic traveling through their lot and the added liability of that traffic if the souther entrance onto new North/south road isn't built.
Fire Review Approved with Conditions 12/30/2024 12/30/2024
Jim Eden
Code Statement
Informational
12/30/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Lanes - Marking
Resolved
12/30/2024

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Areas along fire lanes and in front of hydrants shall be posted.
Water Supply
Corrective Action Required
12/19/2024

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Confirm with Water Utilities that the area water infrastructure will supply the required fire flow per IFC Table B105.1(2) with a 50% reduction for the automatic sprinkler system. 12/11/20- Still to be determined.
Misc.
Informational
12/30/2024

The 6,900 S.F. building may need additional fire protection based on use.
Miscellaneous Correction
Corrective Action Required
12/19/2024

An automatic fire sprinkler system is required for the building. Show the location of the sprinkler main going to the building.
Planning Review No Comments 12/30/2024 12/30/2024
Adair Bright
Miscellaneous Correction
Corrective Action Required
12/19/2024

Engineering Review Approved with Conditions 12/30/2024 12/30/2024
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
12/19/2024

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
12/19/2024

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
12/19/2024

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #06 Land Disturbance
Corrective Action Required
12/19/2024

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
12/19/2024

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
12/19/2024

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Traffic Review Corrections 12/30/2024 12/23/2024
Erin Ralovo
Corrective Action Required
12/23/2024

If the church refuses to build the new southern access on NW Summit Drive, staff requests letter from the church acknowledging that they understand there will likely be increased traffic traveling through their parking lot going to the Chipman Road in order to go south on View High or east on Chipman Road.
Traffic Review Corrections 12/17/2024 12/18/2024
Erin Ralovo
Resolved
12/23/2024

Plans seem to indicate that the parking lot improvments on the church side of the de3velopkment are included with this application. However, i talks with staff and your response letter it is indicated that these are future improvements to be done by the church. If these are not included with this application, all dimentions and linework should be greyed/removed to indicate future installation.
Resolved
12/23/2024

The eastern mid-block crossing is not acceptable as it is unexpected and not at a driveway. Please move this crossing to line up with the drive on the east side of the building.
Resolved
12/23/2024

The path along View High will need to be a 10 FT Shared Use Path rather than a 10 FT sidewalk.
Resolved
12/23/2024

A full review of the TIS was not completed. Further comments on the TIS will be forthcoming from traffic at a later time.
Resolved
12/23/2024

Address how trip generation is handled for pickleball courts, could be 490 - Tennis Courts or 495 - Recreational Community Center and included in the square footage of the building.
Resolved
12/23/2024

I think the discrepancy on the square footage of the building has been resolved. The TIS shows 157,181 SF and sheet 1 of the plans showed 164,081 SF. The difference is 6,900 SF which is the commercial building. Disregard previous comment.
Corrective Action Required
12/19/2024

We would like to see the church access moved from Ashurst to directly across from the Commercial building access. If the church is opposed to removing the existing access, they can keep that access in addition to the new access. Without the new access point, the church can expect to receive a lot of cut-through traffic leaving the sports complex to get to the signal at Chipman.
Resolved
12/23/2024

In the Traffic Study, where it mentions a median break I would prefer that is more specific and called either a 3/4 access or a Left-In-Right-In-Right-Out. It is mentioned earlier in the report so this is just a clarification in case someone jumps right to the Recommendations page.
Planning Review Corrections 12/17/2024 12/17/2024
Adair Bright
Miscellaneous Correction
Corrective Action Required
12/10/2024

These comments have been modified on 12/19/24 to address the initial review comment and the discussion had between staff and the applicant. I am just updating these to reflect the current understanding. One additional item needed was clarification on when the additional stalls on the church site would be provided. These edits were made prior to the review of the items resubmitted on 12/19/24.
Miscellaneous Correction
Corrective Action Required
12/10/2024

Initial Comment: Confirm that you are providing adequate ADA parking. Also, update the parking notes on C100 to include those stall counts. Discussed Verbally 12/19: The comment was redundant. The table on Sheet C100 needed updated to reflect the ADA stall count being provided.
Miscellaneous Correction
Corrective Action Required
12/10/2024

Initial Comment: Provide ADA stall dimensions. Addressed Verbally 12/19: Staff and Applicant discussed the addition of a dimension on an ADA stall to be called out as typical.
Miscellaneous Correction
Corrective Action Required
12/10/2024

Initial Comment: I assume you are planning on preserving some existing vegetation along the east side. Please show an outline and a rough estimate of the amount of trees you are intending to keep. Addressed Verbally 12/19: Staff and Applicant discussed the addition of a hatched area depicting the existing vegetation intending to be preserved.
Miscellaneous Correction
Corrective Action Required
12/10/2024

Initial Comment: Staff is not supportive of waiving the fence requirement to the south. Even though a 6-ft. tall fence is not going to conceal a >30-ft. tall building, it is also about providing a physical barrier between such differing land uses. Addressed Verbally 12/19: Applicant stated this is understood and they will either move forward with the modification request or be agreeable to additional landscaping. (Please correct me on this if I'm incorrect or misunderstood.)
Miscellaneous Correction
Corrective Action Required
12/10/2024

Initial Comment: Your response letter stated the north/south drive adjacent to the church will be public, but the landscape plan calls it out as private. Addressed Verbally 12/19: Applicant stated the landscape plan will be updated.
Miscellaneous Correction
Corrective Action Required
12/17/2024

Please note that signs are shown for illustrative purposes only.
Miscellaneous Correction
Corrective Action Required
12/19/2024

Initial Comment: Confirm adequate width is being provided in landscaping islands for the trees being proposed - minimum of 10-ft. is required. Addressed Verbally 12/19: Applicant stated the deciduous trees will be removed and evergreens and/or shrubs will remain.
Engineering Review Approved with Conditions 12/17/2024 12/17/2024
Sue Pyles, P.E.
DE C&O #01 Eng Plans – FDP/PDP
Corrective Action Required
12/17/2024

All required engineering plans and studies, including water lines, sanitary sewers, storm drainage, streets and erosion and sediment control shall be submitted along with the final development plan. All public infrastructure must be substantially complete, prior to the issuance of any certificates of occupancy.
DE C&O #03 Eng & Insp Fees
Corrective Action Required
12/17/2024

All Engineering Plan Review and Inspection Fees shall be paid prior to approval of the associated engineering plans and prior to the issuance of any site development permits or the start of construction (excluding land disturbance permit).
DE C&O #04 Cert FA or Escrow
Corrective Action Required
12/17/2024

All subdivision-related public improvements must have a Certificate of Final Acceptance prior to approval of the final plat, unless security is provided in the manner set forth in the City's Unified Development Ordinance (UDO) Section 7.340. If security is provided, building permits may be issued upon issuance of a Certificate of Substantial Completion of the public infrastructure as outlined in Article 3, Division V, Sections 3.540 and 3.550 and Article 3, Division IV, Section 3.475 of the UDO, respectively.
DE C&O #06 Land Disturbance
Corrective Action Required
12/17/2024

A Land Disturbance Permit shall be obtained from the City if groundbreaking will take place prior to the issuance of a site development permit, building permit, or prior to the approval of the Final Development Plan / Engineering Plans.
DE C&O #09 FDP Reviews
Corrective Action Required
12/17/2024

Certain aspects of the development plan will be further reviewed during the Final Development Plan phase of the project. This includes detailed aspects of the design to help ensure that the plan meets the design criteria and specifications contained in the Design and Construction Manual.
DE C&O #11 Pavement Thickness
Corrective Action Required
12/17/2024

Private parking lots shall follow Article 8 of the Unified Development Ordinance for pavement thickness and base requirements.
Fire Review Approved with Conditions 12/17/2024 12/11/2024
Jim Eden
Code Statement
Corrective Action Required
12/18/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Lanes - Marking
Corrective Action Required
12/18/2024

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Areas along fire lanes and in front of hydrants shall be posted.
FDC
Resolved
12/11/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Show the location of the FDC.
Water Supply
Corrective Action Required
12/10/2024

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Confirm with Water Utilities that the area water infrastructure will supply the required fire flow per IFC Table B105.1(2) with a 50% reduction for the automatic sprinkler system. 12/11/20- Still to be determined.
Misc.
Corrective Action Required
12/18/2024

The 6,900 S.F. building may need additional fire protection based on use.
Miscellaneous Correction
Corrective Action Required
12/11/2024

An automatic fire sprinkler system is required for the building. Show the location of the sprinkler main going to the building.
Traffic Review Corrections 11/22/2024 11/25/2024
Susan Barry, P.E.
Corrective Action Required
11/12/2024

The church parking lot should tie in on the new street across from the commercial property. Once this connection is made, the driveway on Ashurst should go away.
Corrective Action Required
11/12/2024

A sidewalk connection should be added on the west side of the development into the church parking lot.
Corrective Action Required
11/12/2024

A traffic Study is required. KCMO should also review the TIS and any requirements from them will need to be submitted to the City.
Corrective Action Required
11/12/2024

Sidewalk on the north side of Ashurst approaching View High appears to be within 2 FT of the back of curb and therefore should transition to 6 FT wide. Also the tie-in to the ramp is not compliant and will need to be adjusted.
Corrective Action Required
11/25/2024

A 10' shared use path will be required along View High for the extent of the properties being developed.
Corrective Action Required
11/25/2024

If shared parking is proposed, sidewalks should be built to connect parking lots to both buildings.
Engineering Review Corrections 11/22/2024 11/22/2024
Sue Pyles, P.E.
Corrective Action Required
11/22/2024

General: • Please label the rights-of-way throughout the plan set. • Please indicate whether sidewalk is existing or proposed. • Please include pavement section(s) and indicate location.
Corrective Action Required
11/22/2024

Sheet C.100: • Please replace the PW Inspection information with Development Services in the Utility Company list. • Please revise the Site Improvement Storm Water Detention Note to reflect this project. • Please revise the utility labels for clarity.
Corrective Action Required
11/22/2024

Sheet C.100: Please show and label the detention basin.
Corrective Action Required
11/22/2024

Sheet C.206: Please show and label, with dimensions and elevation, the emergency spillway.
Planning Review Corrections 11/22/2024 11/22/2024
Adair Bright
Miscellaneous Correction
Corrective Action Required
11/22/2024

Provide a rezoning exhibit and a legal description of the property being rezoned.
Miscellaneous Correction
Corrective Action Required
11/22/2024

Provide ADA stalls.
Miscellaneous Correction
Corrective Action Required
11/22/2024

The north arrow on sheet C.100 is covering some text. Please scoot it over.
Miscellaneous Correction
Corrective Action Required
11/22/2024

Provide individual parking stall width on the conceptual commercial.
Miscellaneous Correction
Corrective Action Required
11/22/2024

Provide setbacks to the south & east property lines on the conceptual commercial.
Miscellaneous Correction
Corrective Action Required
11/22/2024

Provide setbacks to the outdoor soccer field.
Miscellaneous Correction
Corrective Action Required
11/22/2024

Provide a parking memo justifying the amount of parking spaces provided.
Miscellaneous Correction
Corrective Action Required
11/22/2024

Not all parking stalls meet UDO requirements. Stalls shall be 9ft. wde by 19-ft. long. Also, an interpretation has been made and enforced in the past that no part of the curb shall be included in those measurements.
Miscellaneous Correction
Corrective Action Required
11/22/2024

Provide setback dimensions to the parking lots.
Miscellaneous Correction
Corrective Action Required
11/22/2024

With the church parking lot being expanded, all new stalls shall meet current code requirements. Dimension this on the plan.
Miscellaneous Correction
Corrective Action Required
11/22/2024

Although the landscaping is conceptual, it looks quite sparse. I suggest double checking the code requirements because you will be required a High Impact buffer along the east side which could affect the proposed grading or require a modification.
Miscellaneous Correction
Corrective Action Required
11/22/2024

Given modifications will be requested for the amount of metal proposed, staff highly suggests increasing the amount of visual interest in the building by providing varying roof heights, vertical relief through insets, and perhaps more color. It is also recommended to double check the calculations concerning percentage of material types as some seem off.
Miscellaneous Correction
Corrective Action Required
11/22/2024

As a heads up on some items - all roof top equipment must be screened on all sides, people will probably ask about the lighting given the proximity to residential, and light poles are capped at 15-ft. in height when located within 100-ft. of a residential district or use.
Miscellaneous Correction
Corrective Action Required
11/22/2024

Questions: Is the north/south drive adjacent to the church private or public? Will there be any proposed fencing? If yes, can you provide a fence detail? For the sidewalk to the south of the parking stalls abutting the building, is it possible to connect that into the sidewalk going east to provide better pedestrian accessibility?
Miscellaneous Correction
Corrective Action Required
11/22/2024

If there is a shared parking agreement with the church being proposed, you must provide pedestrian connections to get across the street.
Miscellaneous Correction
Corrective Action Required
11/22/2024

I know you may not have all your sign specs narrowed down yet, but if you do and would like any modifications (quantity, size, etc.) we can roll that into the PDP. Otherwise, you will have to go back to Planning Commission at a later date for any modifications to the sign code.
Fire Review Corrections 11/22/2024 11/12/2024
Jim Eden
Code Statement
Corrective Action Required
11/12/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Fire Lanes - Marking
Corrective Action Required
11/12/2024

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Areas along fire lanes and in frot of hydrants shall be posted.
FDC
Corrective Action Required
11/12/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Show the location of the FDC.
Water Supply
Corrective Action Required
11/12/2024

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Confirm with Water Utilities that the area water infrastructure will supply the required fire flow per IFC Table B105.1(2) with a 50% reduction for the automatic sprinkler system.
Misc.
Corrective Action Required
11/25/2024

The 6,900 S.F. building may need additional fire protection based on use.
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Commercial Rezoning and Preliminary Development Plan fee $4,350.00 $4,350.00 Paid 11/18/2024
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 11/18/2024
9110076-Legal Notice Publishing Charge $165.00 $165.00 Paid 11/18/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Planning Commission Meeting 01/23/2025 5:00 PM Council Chambers 01/23/2025 05:00 PM
Agenda Item
Approved
01/23/2025
City Council Public Hearing 02/25/2025 6:00 PM Council Chambers 02/25/2025 06:00 PM
Agenda Item
Continued
02/25/2025
City Council Public Hearing 03/18/2025 6:00 PM Council Chambers 03/18/2025 06:00 PM
Agenda Item
Approved
03/18/2025
City Council Ordinance 2nd Reading 04/15/2025 6:00 PM Council Chambers 04/15/2025 06:00 PM
Agenda Item
Approved
04/15/2025
Documents & Images
Date Uploaded File Type Document Name
11/08/2024 Application Form Application Form_Rev 0_PL2024283
11/08/2024 Application Form Affidavit Form_Rev 0_PL2024238
11/08/2024 Engineer Report/Study Traffic Assessment_Rev 0_PL2024238
11/08/2024 Plans Exterior Renderings_Rev 0_PL2024238
11/08/2024 Plans Exterior Elevations_Rev 0_PL2024238
11/08/2024 Engineer Report/Study Storm Study_Rev 0_PL2024238
11/08/2024 Plans Civil Plans_Rev 0_PL2024238
11/12/2024 Activity Document Adjacent Property List_Word Document
11/12/2024 Activity Document Adjacent Property List_Excel Document
11/12/2024 Activity Document Adjacent Property List_Excel Document.pdf
11/18/2024 Receipt Receipt for transaction:2024-009019
11/25/2024 Letter Applicant Letter - Dev. Apps (DRCP)
12/03/2024 Meeting Summary Neighborhood Meeting Notes_PL2024283
12/10/2024 Letter Parking Determination Memorandum_PL2024283
12/10/2024 Engineer Report/Study Traffic Impact Study_Rev 0_PL2024283
12/10/2024 Letter Modification Request Letter_PL2024283
12/10/2024 Letter Comment Response Letter_PL2024283
12/10/2024 Plans Full Plan Set_Rev 1_PL2024283
12/10/2024 Plans Rezoning Exhibit_PL2024283
12/18/2024 Letter Applicant Letter - Dev. Apps (DRCP)
12/19/2024 Letter Comment Response Letter_PL2024283
12/19/2024 Plans Full Plan Set_Rev 2_PL2024283
12/19/2024 Letter Applicant Letter - Dev. Apps (DRCP)
12/20/2024 Letter Traffic Impact Study_Rev 1_PL2024283
12/20/2024 Plans Full Plan Set_Rev 3_PL2024283
12/30/2024 Public Notice Document 1-4 notice of hearing #PL2024-283 - REZONING from AG to CP-2 and PRELIMINARY DEVELOPMENT PLAN
12/31/2024 Letter Applicant Letter - Dev. Apps (DRCP)
12/31/2024 Plans Full Plan Set_Rev 4_PL2024283
12/31/2024 Plans Landscape Plan_Rev 4_PL2024283
01/03/2025 Photograph Public Notice Sign 1 - 1/23 PC & 2/25 CC
01/03/2025 Photograph Public Notice Sign 2 - 1/23 PC & 2/25 CC
01/03/2025 Photograph Public Notice Sign 3 - 1/23 PC & 2/25 CC
01/03/2025 Photograph Public Notice Sign 4 - 1/23 PC & 2/25 CC
01/03/2025 Photograph Public Notice Sign 5 - 1/23 PC & 2/25 CC
01/03/2025 Photograph Public Notice Sign 6 - 1/23 PC & 2/25 CC
01/03/2025 Activity Document Affidavit_Public Notice Letters_PL2024283
01/03/2025 Public Notice Document Public Notice Packet Letter_PL2024283
01/03/2025 Letter Parking Memo_The Summit Church and 3D Builders_PL2024283
01/03/2025 Letter Code Modification Request Letter_PL2024283
01/03/2025 Letter Parking Determination Memo_View High Sports Complex_PL2024283
01/03/2025 Plans Full Plan Set_Rev 5_PL2024283
01/08/2025 Public Notice Document 1-4 notice of hearing #PL2024-283 - REZONING from AG to CP-2 and PRELIMINARY DEVELOPMENT PLAN
01/08/2025 Letter Applicant Letter - Dev. Apps (DRCP)
01/09/2025 Letter PL2024283 View High Sports Complex TIA
01/13/2025 Email Email_The Summit Church_1-13-2025
01/16/2025 Letter Modification Request Letter
01/22/2025 Presentation Presentation File PC_PL2024283
02/05/2025 Public Notice Document 2-8 public hearing #PL2024-283
02/25/2025 Photograph Public Notice Sign 1 Update - 1/23 PC & 3/4 CC
02/25/2025 Photograph Public Notice Sign 2 Update - 1/23 PC & 3/4 CC
02/25/2025 Photograph Public Notice Sign 3 Update - 1/23 PC & 3/4 CC
02/25/2025 Photograph Public Notice Sign 4 Update - 1/23 PC & 3/4 CC
02/25/2025 Photograph Public Notice Sign 5 Update - 1/23 PC & 3/4 CC
02/25/2025 Photograph Public Notice Sign 6 Update - 1/23 PC & 3/4 CC
02/27/2025 Photograph Public Notice Sign 1 Update - 1/23 PC & 3/18 CC
02/27/2025 Photograph Public Notice Sign 2 Update - 1/23 PC & 3/18 CC
02/27/2025 Photograph Public Notice Sign 3 Update - 1/23 PC & 3/18 CC
02/27/2025 Photograph Public Notice Sign 4 Update - 1/23 PC & 3/18 CC
02/27/2025 Photograph Public Notice Sign 5 Update - 1/23 PC & 3/18 CC
02/27/2025 Photograph Public Notice Sign 6 Update - 1/23 PC & 3/18 CC
03/17/2025 Public Notice Document 2-8 public hearing #PL2024-283
03/17/2025 Presentation Applicant Presentation_03182025 CC_PL2024283
04/25/2025 Ordinance 10118
03/12/2025 Letter Staff Letter
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home