Planning Application Status

PL2024210




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2024210
Evren Apartments (Douglas and Tudor Apartments)
Residential Final Development Plan
Commercial Final Development Plan
Residential Final Development Plan
Approved
08/15/2024
LSMO TUDOR APARTMENTS LLC
Final Development for Evren Apartments (Douglas and Tudor Apartments) - 358 Units
Locations
Contacts
LSMO TUDOR APARTMENTS LLC, Address:10 W CARMEL DR STE 200  
Chad Porter, Address:8653 Penrose Lane, Phone:(913) 317-9500  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review Approved with Conditions 12/13/2024 12/12/2024
Sue Pyles, P.E.
DE Commercial Detention Basin
Corrective Action Required
12/12/2024

The applicant shall submit and the City shall accept an “As-built / As-graded” detention basin plan and BMP O&M Manual prior to issuance of any occupancy permit for the proposed development.
DE Contact Field Eng. Inspector
Corrective Action Required
12/12/2024

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
12/12/2024

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $500,471.55
DE Future Repair Work
Corrective Action Required
12/12/2024

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Building Codes Review Approved with Conditions 12/13/2024 12/11/2024
Joe Frogge
Miscellaneous Correction
Corrective Action Required
12/06/2024

Architectural plans are not part of this process. We will review them after the building permit submission. Action required: Comment is informational. 9/20/2024 - acknowledged in letter
Miscellaneous Correction
Resolved
12/11/2024

Provide retaining wall designs. 9/20/2024 - Unable to locate in submittal.
Miscellaneous Correction
Resolved
12/11/2024

Specify type/size of all water service connections. 9/20/2024 - Type of connection not provided.
Miscellaneous Correction
Resolved
12/11/2024

Specify locations, types, size, etc. for water meters. ** Notes: - Meters larger than 2" require custom designed pits. - Water meter detail shown is for maximum 2" meter. - Water Department dictates size and material of all piping from main to 10' past meter. 9/20/2024 - Water pipe from main to meter and then minimum 10' past meter is required to be 2"
Fire Review Approved with Conditions 12/13/2024 12/09/2024
Jim Eden
Code Statement
Corrective Action Required
12/12/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Water Supply
Corrective Action Required
12/06/2024

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Confirm construction type. The fire model must provide the needed fire flow required by IFC Table B105.1(2), with 50% reduction for a sprinkler system for either a VA or VB building? Calculated on the largest building at 79, 582 sq. ft. 12/9/2025- V-A Construction acknowledged along with 2,500GPM fire flow.
Engineering Review Corrections 11/19/2024 11/18/2024
Sue Pyles, P.E.
Corrective Action Required
11/18/2024

Sanitary sewer service line connection to an existing main must be made with a cut-in wye. Please label the connections for Buildings 1, 3, and 5 accordingly.
Corrective Action Required
11/18/2024

As shown, the detention basin extends into the public easement located to the west. Moving the proposed water main removed that issue, but the basin still encroaches into the public easement around the sanitary sewer main.
Corrective Action Required
11/18/2024

The ESC plans don’t include a sediment basin. This site would seem to need one to adequately control sediment leaving the site. We typically see the detention basin being used as a temporary sediment basin since it’s normally located in the lowest area. Please either add or explain. If added, be sure to include all appropriate standard details.
Corrective Action Required
11/18/2024

Please remove City Standard Details GEN-5, GEN-6, and SAN-4 as they aren’t used in this project.
Corrective Action Required
11/18/2024

Please add all City Standard Water Details.
Corrective Action Required
11/18/2024

Provide a backfill detail.
Planning Review No Comments 11/12/2024 11/13/2024
Adair Bright
Fire Review Corrections 11/12/2024 11/07/2024
Jim Eden
Code Statement
Informational
11/07/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
Water Supply
Corrective Action Required
11/07/2024

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Confirm construction type. The fire model must provide the needed fire flow required by IFC Table B105.1(2), with 50% reduction for a sprinkler system for either a VA or VB building? Calculated on the largest building at 79, 582 sq. ft.
Building Codes Review Corrections 11/12/2024 11/05/2024
Joe Frogge
Miscellaneous Correction
Corrective Action Required
11/05/2024

Architectural plans are not part of this process. We will review them after the building permit submission. Action required: Comment is informational. 9/20/2024 - acknowledged in letter
Miscellaneous Correction
Corrective Action Required
11/05/2024

Provide retaining wall designs. 9/20/2024 - Unable to locate in submittal.
Miscellaneous Correction
Corrective Action Required
11/05/2024

Specify type/size of all water service connections. 9/20/2024 - Type of connection not provided.
Miscellaneous Correction
Corrective Action Required
11/05/2024

Specify locations, types, size, etc. for water meters. ** Notes: - Meters larger than 2" require custom designed pits. - Water meter detail shown is for maximum 2" meter. - Water Department dictates size and material of all piping from main to 10' past meter. 9/20/2024 - Water pipe from main to meter and then minimum 10' past meter is required to be 2"
Planning Review Corrections 10/01/2024 10/01/2024
Adair Bright
Corrective Action Required
10/01/2024

Sheet C02 - remove the boundary of the previously vacated right-of-way.
Corrective Action Required
10/01/2024

Sheet C04 - update the spelling of "ratio" and change "proposed zoning" to "existing zoning."
Corrective Action Required
10/01/2024

Sheets C11, C12, and C13 - Provide setbacks to the parking lot from the applicable property lines.
Corrective Action Required
10/01/2024

Sheet C13 - setback for building 7 should be measured to the closest point.
Corrective Action Required
10/01/2024

Update the landscaping count - the open yard area includes the detention area for the tree requirement. The latest revisions updated the count for shrubs but not for trees.
Corrective Action Required
10/01/2024

Sheet L1.00 - provide greater contrast between the tree symbols and the lawn so staff can confirm the landscaping requirements are being met.
Corrective Action Required
10/01/2024

The total percentage of open space needs to be stated. If it is already on the plan set, please let me know where.
Corrective Action Required
10/01/2024

Photometric - confirm the concrete base/pedestal height.
Corrective Action Required
10/01/2024

Photometric - show the perimeter area (100-ft. inset from the property lines).
Corrective Action Required
10/01/2024

Sheet C06 - there is a building setback line called out at 18.9', but then the dimensioned setback is at 20.1' and they appear to be at the same location. Remove any unnecessary dimensions and verify setbacks.
Corrective Action Required
10/01/2024

Provide setbacks to the buildings as well as the balconies.
Corrective Action Required
10/01/2024

Many of the parking stall dimensions include the curb and gutter which we do not allow per Section 8.620 (https://library.municode.com/mo/lee's_summit/codes/unified_development_ordinance?nodeId=ART8SIST_DIVIIPA_S8.620PALODE). The project was previously approved a modification to allow 157 compact spaces, any additional spaces that do not meet the required 9' in width by 19' in length must either be removed or the site needs to be adjust to meet that requirement without including any of the curb.
Engineering Review Corrections 10/01/2024 10/01/2024
Sue Pyles, P.E.
Corrective Action Required
10/01/2024

General: • These comments are in addition to, or sometimes a repeat of, our phone discussion last week. • Please note that complete review of the grading and storm sewer system has not been completed. This will be done when the plans are more legible. • Please include a roof drain plan and profiles for all pipes greater than 6” diameter.
Corrective Action Required
10/01/2024

Sheet C03: As previously requested: • As discussed, please look to ways to make the plans easier to read. As is, many sheets are very difficult to read. • Please refer to Development Services, 816-969-1200, and not Public Works in Layout & Paving Note 6. • Please refer to City of Lee's Summit and not Board of Public Utilities in Site Utility Note 6. • Please refer to Design and Construction Manual and not Technical Provisions & Standard Drawings for Roads and Sewers in General Note 1 and Erosion Control Notes 1 & 2.
Corrective Action Required
10/01/2024

Sheet C04: • Please make a “typical” label for the proposed public water and sanitary sewer mains and refer to them as public and by others, or similar. There can just be 1 or 2 labels shown as typical. • Please coordinate the proposed public sanitary layout with different sheets in this plan set so they all show the same information. • Please show construction of the drive approaches and associated ADA ramps with this plan set. • There appears to be missing linework on the fire line to the proposed hydrant just east of Bldg. 1. • The City requires water meters to be located in grass rather than paved areas, including sidewalk. All meter locations seem to be shown in paved areas. Please revise. • The public sanitary sewer shall terminate at Lot 3. Any line upstream of that will be private. • As stated in the previous comment letter, sanitary sewer service lines can’t connect directly to MHs. Please revise as needed. • As discussed, the detention basin must not extend into any public easement. Please revise. • Please clarify existing easements, proposed easements, and easements to be vacated. This may be done on a separate document.
Corrective Action Required
10/01/2024

Sheet C10: Please dimension the distance from the 100-yr WSE to the property line on this sheet and all other appropriate sheets.
Corrective Action Required
10/01/2024

Sheet C14: Pavement design is a requirement of plan approval. An alternate pavement design after permit issuance can be requested. Depending on the change, a waiver from the City Engineer may be required.
Corrective Action Required
10/01/2024

Sheet C21: • It would appear that rip-rap or other energy dissipation will be necessary at the end sections entering the detention basins. Please evaluate and revise as accordingly. • It appears that the water will pond at the end sections. Please evaluate and revise as necessary.
Corrective Action Required
10/01/2024

Sheets C25-C28: • The City’s design requirements for ADA-accessible ramps is 1.5% maximum cross-slope and 7.5% maximum longitudinal slope. This allows a construction tolerance. Please revise as needed. • Please ensure all crosswalk slopes are visible.
Corrective Action Required
10/01/2024

Sheet C31: Please review all of the structure and drainage area callouts. Some are missing, some are incorrect. Please revise as necessary.
Corrective Action Required
10/01/2024

Sheets C33-C35: • Please include the design HGL in Profile view. • Please include the station in the 2End callout in Plan view. • Please extend the Plan view to include Structure 2I. • Please include information for the FES and Structure 2E in Profile view. • The drop thru Structure 3A does not meet the minimum 0.5’ drop required.
Corrective Action Required
10/01/2024

Sheet C36: • Show and label the limits of the emergency spillway. • As discussed, the detention basin must not extend into any public easement. Please revise.
Corrective Action Required
10/01/2024

Sheet C37: Provide pipe profiles for the 8” water line.
Corrective Action Required
10/01/2024

Sheets C53-C55: • Provide a backfill detail. • Only include standard details that pertain to the work included in this plan set.
Traffic Review No Comments 10/01/2024 09/27/2024
Erin Ralovo
Building Codes Review Corrections 09/24/2024 09/20/2024
Joe Frogge
Miscellaneous Correction
Corrective Action Required
09/17/2024

Architectural plans are not part of this process. We will review them after the building permit submission. Action required: Comment is informational. 9/20/2024 - acknowledged in letter
Miscellaneous Correction
Corrective Action Required
09/17/2024

Provide retaining wall designs. 9/20/2024 - Unable to locate in submittal.
Miscellaneous Correction
Corrective Action Required
09/17/2024

Specify type/size of all water service connections. 9/20/2024 - Type of connection not provided.
Miscellaneous Correction
Corrective Action Required
09/17/2024

Specify locations, types, size, etc. for water meters. ** Notes: - Meters larger than 2" require custom designed pits. - Water meter detail shown is for maximum 2" meter. - Water Department dictates size and material of all piping from main to 10' past meter. 9/20/2024 - Water pipe from main to meter and then minimum 10' past meter is required to be 2"
Miscellaneous Correction
Resolved
09/20/2024

Specify size and material for all waste services to buildings.
Miscellaneous Correction
Resolved
09/20/2024

Provide cleanouts near where the waste piping exits each building.
Fire Review Corrections 09/24/2024 09/18/2024
Jim Eden
Code Statement
Informational
09/18/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
09/17/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Locate FDC outside the fenced area and within 100 feet of a hydrant (near the location of where the fire main enters the building would work).
Water Supply
Corrective Action Required
09/17/2024

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Work with Water Utilities to provide a water model and confirm that adequate fire flow is provided based on construction type and square footage per IFC Table B105.1(2). Local amendment allows for only a 50% reduction in fire flow for a sprinkler system. Provide information for fire flow.
Miscellaneous Correction
Informational
09/17/2024

Vertical combustible construction is not allowed until hydrants and a base of asphalt for access roads and parking lots are in place.
Fire Lanes - Marking
Resolved
09/18/2024

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Mark alaong the west entrances. Acknowledged
Misc.
Corrective Action Required
09/17/2024

Show fire lane turning movement in front of Building 6.
Miscellaneous Correction
Resolved
09/18/2024

All hydrant mains shall be 6". (Meet City design standards)
Engineering Review Corrections 09/03/2024 09/04/2024
Sue Pyles, P.E.
Corrective Action Required
09/04/2024

General: • Submit an Engineer's Estimate of Probable Construction Costs. • Submit the SWPPP and a copy of the MDNR Land Disturbance Permit. • Please review the plans for clarity. There are many line weights, labels, text overlapping, and text box masking of information that make portions of the plans unreadable. There is also extraneous information that is crowding the page. For instance, there is survey information and shading that doesn’t need to be on every sheet. It all makes the plans very hard to read. • Show and label all existing sidewalks, including widths.
Corrective Action Required
09/04/2024

Sheet C01: Please show location of all oil/gas wells, or indicate none are present, and cite the source.
Corrective Action Required
09/04/2024

Sheet C02: The vacated Sloan Street ROW is shown, but isn’t an existing condition.
Corrective Action Required
09/04/2024

Sheet C03: • Please replace Layout & Paving Note 5 with “The contractor shall contact the City’s Development Services Engineering Inspection to schedule an inspection coordination meeting with a Field Engineering Inspector prior to any land disturbance work at (816) 969-1200.” • Do the Wetland Notes apply to this project? If not, please remove. • Please revise Grading Note 5, and Site Utility Notes 6 & 17 to reference the correct location. • Grading Note 8 and Earthwork Note 8 contradict each other. Please coordinate. • Grading Note 10 and General Note 11 are incorrect. All work within the right-of-way associated with this project is included in the site permit. It would not require a separate permit. • Please revise Site Utility Note 14, 8” and larger does not require ductile iron pipe. Please see Design and Construction manual Section 3901.B.1. C900 is preferred over DIP. • The Design and Construction Manual has separation requirements, but does not always require a change in pipe material. Please note that the City does not prefer the use of DIP in general. • Please refer to the Design and Construction Manual as the reference specification for Lee’s Summit in General Note 1 and Erosion Control Notes 1 & 2. • Please revise “2012” to “2018” in General Note 20. • Please revise “Public Works” with “Development services” in Erosion Control Note 21.
Corrective Action Required
09/04/2024

Sheet C04: • Please show and label existing and proposed utility easements on this sheet and throughout the plan set. • Please clearly delineate public utilities not included in this plan set vs private utilities which are included on this sheet and throughout the plan set. • Please include a legend that includes all shading and hatching on this sheet and throughout the plan set as necessary.
Corrective Action Required
09/04/2024

Sheet C05: Please remove the vacated Sloan Street right-of-way from this sheet and throughout the plan set.
Corrective Action Required
09/04/2024

Sheet C10: Please show and label the 100-year WSE and dimension to adjacent buildings and property lines.
Corrective Action Required
09/04/2024

Sheet C14: • Please reference KCMMB for both concrete and asphalt in the pavement sections. • Please note that pavement sections are required to be included within the plan set. All pavement design must meet or exceed City requirements. • Please show the entrance approaches as concrete.
Corrective Action Required
09/04/2024

Sheets C25-C28: Please provide some sort of call-out or method to locate each of the ramps. A complete review will be done once that is provided.
Corrective Action Required
09/04/2024

Sheets C33-C35: • The City’s compacted fill requirement extends to 18” above the top of pipe. It’s fine to require more than the City does, just wanted you to be aware. • Please label structure 1G in Plan view. • Structures 3A, 5A, 5B require 0.5’ drop. Please revise. • Please move the detention basin outlet structure information to a separate Detention Basin sheet. Include the plan view of the basin, as well as a Profile for the outlet pipe. Include the basin volume required as well as the volume as designed. On Plan view, include the emergency spillway location, elevation, and length.
Corrective Action Required
09/04/2024

Sheet C36: • Please label water meter sizes. Water meters are not combined in the backflow vault. • Please clarify, are there water meters for each building or one main meter? • Service connections to the public main can only be made with a wye connection, not a connection to a MH. Please revise as needed.
Corrective Action Required
09/04/2024

Sheets C39-C47: • The method of draining the backflow vault sump shall be shown. This can be accomplished by daylighting with a small diameter pipe or connecting to a storm structure. Each option could be done with or without a sump pump, depending on grades. Please evaluate and revise as appropriate. • Provide sanitary sewer service line flowline elevation at buildings.
Traffic Review Corrections 09/03/2024 09/03/2024
Erin Ralovo
Corrective Action Required
09/03/2024

Grading plans show a marked crosswalk across the driveways, however they are not shown anywhere else on the site plans. Staff does not feel a marked crosswalk is needed and they should be removed.
Planning Review Corrections 09/03/2024 09/03/2024
Adair Bright
Corrective Action Required
09/03/2024

The landscaping open yard requirements shall include the detention area; therefore, you will be required to increase the amount of plantings.
Corrective Action Required
09/03/2024

On Sheet C04, include the adjacent property information.
Corrective Action Required
09/03/2024

Provide a retaining wall detail and a fence detail for the dog park.
Corrective Action Required
09/03/2024

Provide a setbacks to the parking lot from all applicable property lines.
Corrective Action Required
09/03/2024

Identify, label, and dimension sight triangles.
Corrective Action Required
09/03/2024

The monument sign will require a separate sign permit and review - just a heads up.
Corrective Action Required
09/03/2024

Corrective Action Required
09/03/2024

The photometric plan shall include footcandle measurements over the entire property.
Corrective Action Required
09/03/2024

On the photometric plan - please confirm the height to the top of the light fixture from grade.
Corrective Action Required
09/03/2024

The elevations shall include a dashed line indicating the height of the roof-mounted equipment.
Corrective Action Required
09/03/2024

Confirm that in areas where the roof/parapet height varies the roof-mounted equipment will be screen on all sides.
Building Codes Review Corrections 09/03/2024 08/29/2024
Joe Frogge
Miscellaneous Correction
Corrective Action Required
08/29/2024

Architectural plans are not part of this process. We will review them after the building permit submission. Action required: Comment is informational.
Miscellaneous Correction
Corrective Action Required
08/29/2024

Provide retaining wall designs.
Miscellaneous Correction
Corrective Action Required
08/29/2024

Specify type/size of all water service connections.
Miscellaneous Correction
Corrective Action Required
08/29/2024

Specify locations, types, size, etc. for water meters. ** Notes: - Meters larger than 2" require custom designed pits. - Water meter detail shown is for maximum 2" meter. - Water Department dictates size and material of all piping from main to 10' past meter.
Miscellaneous Correction
Corrective Action Required
08/29/2024

Specify size and material for all waste services to buildings.
Miscellaneous Correction
Corrective Action Required
08/29/2024

Provide cleanouts near where the waste piping exits each building.
Fire Review Corrections 09/03/2024 08/21/2024
Jim Eden
Code Statement
Corrective Action Required
08/21/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code.
FDC
Corrective Action Required
08/21/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. FDC not shown on the clubhouse.
Water Supply
Corrective Action Required
08/21/2024

IFC 507.1 - An approved water supply capable of supplying the required fire flow for fire protection shall be provided to premises upon which facilities, buildings or portions of buildings are hereafter constructed or moved into or within the jurisdiction. Work with Water Utilities to provide a water model and confirm that adequate fire flow is provided based on construction type and square footage per IFC Table B105.1(2). Local amendment allows for only a 50% reduction in fire flow for a sprinkler system.
Miscellaneous Correction
Informational
08/21/2024

Vertical combustible construction is not allowed until hydrants and a base of asphalt for access roads and parking lots are in place.
Fire Lanes - Marking
Corrective Action Required
08/21/2024

IFC 503.3 - Where required by the fire code official, approved signs or other approved notices or markings that include the words NO PARKING—FIRE LANE shall be provided for fire apparatus access roads to identify such roads or prohibit the obstruction thereof. The means by which fire lanes are designated shall be maintained in a clean and legible condition at all times and be replaced or repaired when necessary to provide adequate visibility. Mark along the west entrances
Misc.
Corrective Action Required
08/21/2024

Show fire lane turning movement in front of Building
Miscellaneous Correction
Corrective Action Required
08/21/2024

All hydrant mains shall be 6". (Meet City design standards)
Fees
Paid Fees Amount Paid Owing Date Paid
9110077-Final Development Plan fee $1,200.00 $1,200.00 Paid 08/27/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
08/16/2024 Plans Plan Set_Rev0_PL2024210
08/16/2024 Plans Public Sanitary Plans_Rev0_PL2024210
08/16/2024 Plans Public Street Plans_Rev0_PL2024210
08/16/2024 Plans Public Water Main Plans_Rev0_PL2024210
08/16/2024 Engineer Report/Study Stormwater Report_Rev0_PL2024210
08/16/2024 Plans Final Plat_Rev0_PL2024210
08/16/2024 Drawing Building Elevations/Renderings_Rev0_PL2024210
08/19/2024 Plans Photometric Plan_Rev0_Pl2024210
08/19/2024 Plans Landscape Plans_Rev0_PL2024210
08/19/2024 Application Form Application_PL2024210
08/27/2024 Receipt Receipt_PL2024210
09/05/2024 Letter Applicant Letter_PL2024210
09/17/2024 Plans Plan Set_Rev1_PL2024210
09/17/2024 Drawing Building Elevations/Renderings_Rev1_PL2024210
09/17/2024 Plans Landscape Plans_Rev1_PL2024210
09/17/2024 Engineers Estimate Probable Cost Estimate_PL2024210
09/17/2024 Letter Response Letter_PL2024210
09/17/2024 Plans Photometric Plans_Rev1_PL2024210
10/01/2024 Letter Applicant Letter_PL2024210
10/29/2024 Plans Land Disturbance Plans_PL2024210
11/04/2024 Plans Plan Set_Rev2_PL2024210
11/04/2024 Activity Document Water Line Easements_PL2024210
11/04/2024 Plans Landscape Plans_Rev2_PL2024210
11/04/2024 Letter Response Letter_PL2024210
11/04/2024 Plans Photmetric Plans_Rev2_PL2024210
11/04/2024 Plans Retaining Wall Plans_Rev0_PL2024210
11/04/2024 Activity Document Water Line Easement Agreement_PL2024210
11/18/2024 Letter Applicant Letter_PL2024210
11/22/2024 Activity Document Water Line Easement_PL2024210
12/06/2024 Plans Plan Set_Rev3_PL2024210
12/06/2024 Letter Response Letter_PL2024210
12/12/2024 Letter Applicant Letter_PL2024210
12/17/2024 Approved Plans Stamped Approved Plans_PL2024210
12/17/2024 Engineers Estimate Engineers Probable Cost Estimate_Rev0_PL2024210
12/20/2024 Engineers Estimate Engineers Probable Cost Estimate_Rev1_PL2024210
12/20/2024 Email Evren Apts_ Engineer's Estimate Comments_PL2024210
12/20/2024 Activity Document Engineering Fees_PL2024210
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home