Planning Application Status

PL2023322




 / 

Note: You can collapse and expand individual sections by clicking the header of the section you wish to collapse/expand.

Summary
PL2023322
Lee's Summit Flex Space
Commercial Final Development Plan
Commercial Final Development Plan
Approved
11/27/2023
ANACONDA LLC
Contractor Garage Facility with Individual Tenant Spaces
Locations
Contacts
ANACONDA LLC, Address:1507 NE WALL ST  
Kimley-Horn, Address:Attn: Patrick Joyce, Phone:(816) 281-7687  
Matt Hendrickson, Address:1507 NE Wall Street, Phone:(816) 609-8633  
Reviews
Review Type Outcome Est. Completion Date Completed
Engineering Review No Comments 12/18/2024 12/18/2024
Sue Pyles, P.E.
Engineering Review No Comments 11/07/2024 11/07/2024
Sue Pyles, P.E.
Engineering Review No Comments 10/09/2024 10/09/2024
Sue Pyles, P.E.
DE Commercial Detention Basin
Corrective Action Required
10/02/2024

The applicant shall submit and the City shall accept an “As-built / As-graded” detention basin plan prior to issuance of any occupancy permit for the proposed development.
DE Contact Field Eng. Inspector
Corrective Action Required
10/02/2024

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
10/02/2024

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $36,211.12
DE Future Repair Work
Corrective Action Required
10/02/2024

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Planning Review No Comments 08/22/2024 08/20/2024
Hector Soto Jr.
Building Codes Review No Comments 08/22/2024 08/19/2024
Joe Frogge
Engineering Review Approved with Conditions 05/06/2024 05/07/2024
Sue Pyles, P.E.
DE Commercial Detention Basin
Corrective Action Required
05/07/2024

The applicant shall submit and the City shall accept an “As-built / As-graded” detention basin plan prior to issuance of any occupancy permit for the proposed development.
DE Contact Field Eng. Inspector
Corrective Action Required
05/07/2024

Prior to the commencement of any construction activities, the Contractor shall contact Field Engineering Inspections at (816) 969-1200 to coordinate a preconstruction meeting / conference with the assigned Field Engineering Inspector.
DE Engineers Estimate
Corrective Action Required
05/07/2024

The Engineer’s Estimate of Probable Construction Costs has been accepted for this project, and the Engineering Plan Review and Inspection Fee (which is calculated as 3% of the total infrastructure cost plus a water test inspection fee(s)), and the water tap and meter setup fee have been included. These must be paid prior to the issuance of an infrastructure permit and/or the final processing of a building permit. $36,211.12
DE Future Repair Work
Corrective Action Required
05/07/2024

Please be aware that any future repair work to public infrastructure (e.g., water main repair, sanitary sewer repair, storm sewer repair, etc.) within public easements will not necessarily include the repair of pavement, curbing, landscaping, or other private improvements which are located within the easement.
Fire Review Approved with Conditions 05/06/2024 05/05/2024
Jim Eden
Code Statement
Corrective Action Required
05/08/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. Additional fire protection or area separation may be required on the south building depending on use and and occupancy classification.
FDC
Resolved
05/05/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Show the location of the FDC on the north building.
Knox Locks
Resolved
05/05/2024

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Provide a Knox key switch or pad lock on the gates to the facility. Provide a Knox box 6' AFF over the FDC on the north building.
Building Codes Review No Comments 05/06/2024 04/30/2024
Scott Ready
Traffic Review No Comments 05/06/2024 04/30/2024
Scott Ready
Planning Review No Comments 05/06/2024 04/30/2024
Scott Ready
Engineering Review Corrections 04/11/2024 04/12/2024
Sue Pyles, P.E.
Corrective Action Required
04/12/2024

Sheet C006: Please remove the gate valve by the vault. The valve across the street is all that is required. I apologize for the incorrect comment asking for it to be added.
Corrective Action Required
04/12/2024

Sheet C008: Include the following note: “Compacted Fill shall be placed to a minimum 18” above the top of the pipe prior to installation.” Show and label the limits of the compacted fill placement in the Profile view. Use hatching for clarity.
Corrective Action Required
04/12/2024

Sheet C012: Please revise the standard duty asphalt pavement sections as follows: • UDO Section 8.620 Table 8-5 requires the use of granular base course with geogrid OR granular base course with 6” chemically treated subgrade. Please revise. • Design and Construction Manual Section LS2205.4 now requires the use of KCMMB Asphalt Material Specification, current edition, rather than APWA designations. Please revise.
Corrective Action Required
04/12/2024

Please add a sheet in the plans labeled “Stormwater BMP” which shows a plan view of the detention basin and relocated Outlet Structure details. It should be together in the plan set with the ADS detail sheet.
Corrective Action Required
04/12/2024

Stormwater Drainage Study: • ADS Cumulative Storage Volumes Sheet: o Why is “Area of System” shown as 6500 in the green area and 5797 next to it? Please clarify. o How does this table compare to the 60” chamber height shown on the next page. Please clarify. o What does the 24735.44 shown highlighted in gold signify? o Please provide a report from PondPack that shows the outlet structure information (multiple orifice and weir information) used in the modeling. If it is already in the submitted report, please indicate where it can be found.
Corrective Action Required
04/12/2024

O&M Manual: The submitted ADS information on the detention basin will need to be included as a part of the O&M Manual. It doesn’t replace the manual required from the design engineer.
Fire Review Approved with Conditions 04/11/2024 04/10/2024
Jim Eden
Code Statement
Corrective Action Required
03/28/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. Additional fire protection or area separation may be required on the south building depending on use and and occupancy classification.
FDC
Corrective Action Required
03/28/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Show the location of the FDC on the north building.
Knox Locks
Corrective Action Required
03/28/2024

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Provide a Knox key switch or pad lock on the gates to the facility. Provide a Knox box 6' AFF over the FDC on the north building.
Planning Review No Comments 04/11/2024 04/06/2024
Hector Soto Jr.
Traffic Review No Comments 04/11/2024 04/05/2024
Erin Ralovo
Building Codes Review No Comments 04/11/2024 04/02/2024
Joe Frogge
Miscellaneous Correction
Resolved
04/02/2024

Provide complete site lighting design including circuitry and light pole base detail.
MISC
Resolved
04/02/2024

Unified Development Ordinance Article 8, Section 8.180.F. Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Specify screening on plans.
Miscellaneous Correction
Resolved
04/02/2024

Specify water pipe connection to main and pipe from main to meter. Must be 2" from main to meter.
Building Codes Review Corrections 03/11/2024 03/12/2024
Joe Frogge
Miscellaneous Correction
Corrective Action Required
03/12/2024

Provide complete site lighting design including circuitry and light pole base detail.
MISC
Corrective Action Required
03/12/2024

Unified Development Ordinance Article 8, Section 8.180.F. Ground mounted equipment – Ground mounted equipment shall be totally screened from view by landscaping or masonry wall up to a height of the units to be screened. Specify screening on plans.
Miscellaneous Correction
Corrective Action Required
03/12/2024

Specify water pipe connection to main and pipe from main to meter. Must be 2" from main to meter.
Traffic Review Corrections 03/11/2024 03/12/2024
Erin Ralovo
Corrective Action Required
03/04/2024

Sidewalk should extend all the way to the property line.
Engineering Review Corrections 03/11/2024 03/11/2024
Sue Pyles, P.E.
Corrective Action Required
03/11/2024

Please submit the following: • Engineer’s Estimate of Probable Construction Costs. • SWPPP and a copy of the MDNR Land Disturbance Permit. • Final Stormwater Report. • A Stormwater BMP Operation & Maintenance (O&M) Manual. Please contact me for additional discussion on this requirement.
Corrective Action Required
03/11/2024

Sheet C003: • Concrete pavement is required to extend out 30’ from the trash enclosure opening. Please revise. • Key Notes 07 & 16 near the east side of the project are pointing incorrectly. Please revise.
Corrective Action Required
03/11/2024

Sheet C004: Please revise the elevation fonts along the south side of the project. If any overlapping text remains, please relocate for clarity.
Corrective Action Required
03/11/2024

Sheet C006: • Please specify that the sanitary sewer connection is with a cut-in wye. • Include fire line information, including connection type, size, and material. • Show the valve for the backflow. • The method of draining the backflow vault sump shall be shown. This can be accomplished by daylighting with a small diameter pipe or connecting to a storm structure. Each option could be done with or without a sump pump, depending on grades. Please evaluate and revise as appropriate.
Corrective Action Required
03/11/2024

Sheets C007 & C008: • Please relocate the FL IN to the upstream side of the structure and FL OUT to the downstream side in Profile views. • Please revise the storm structure designations. For example, it seems that 301 and 202 are reversed. • The drop through Structure 105 should be 0.5’, please revise. Verify that all structures meet minimum fall requirements. • Review the flowlines at Structure 201, as the east flowline in is lower than the flowline out. • Show and label the existing grade.
Corrective Action Required
03/11/2024

Stormwater: • Include rip-rap calculations and sizing requirements. • Include the ADS detention sheets in the plan set. • A full review will be completed with submission of the stormwater study.
Corrective Action Required
03/11/2024

Sheet C009: • Please modify the Section A-A of the City’s standard curb inlet detail rather than include a detail from another City. • Please either include all construction details for the outlet structure or refer to a standard detail that includes the information.
Corrective Action Required
03/11/2024

Sheet C009 (Duplicate): Please remove the Water Trench detail as it is not used.
Corrective Action Required
03/11/2024

Sheet C012: • The asphalt pavement section shown does not meet the requirements shown in Section 8.620 of the Unified Development Ordinance. Revise detail to meet requirements. • The curb and gutter detail or pavement detail must show that the aggregate base and compaction of native subgrade extends a minimum of one (1) foot beyond the back of curb.
Corrective Action Required
03/11/2024

Details: • Please renumber to eliminate the duplicate C009. • Include the Sanitary Stub detail (SAN-1).
Fire Review Corrections 03/11/2024 03/11/2024
Jim Eden
Code Statement
Informational
04/10/2024

All issues pertaining to life safety and property protection from the hazards of fire, explosion or dangerous conditions in new and existing buildings, structures and premises, and to the safety to fire fighters and emergency responders during emergency operations, shall be in accordance with the 2018 International Fire Code. Additional fire protection or area separation may be required on the south building depending on use and occupancy classification.
FDC
Resolved
04/10/2024

IFC 903.3.7 - Fire department connections. The location of fire department connections shall be approved by the fire code official. Connections shall be a 4 inch Storz type fitting and located within 100 feet of a fire hydrant, or as approved by the code official. Show the location of the FDC on the north building.
Knox Locks
Resolved
04/10/2024

IFC 506.1 - Where access to or within a structure or an area is restricted because of secured openings or where immediate access is necessary for life-saving or fire-fighting purposes, the fire code official is authorized to require a key box to be installed in an approved location. The key box shall be of an approved type listed in accordance with UL 1037, and shall contain keys to gain necessary access as required by the fire code official. 506.1.1 Locks. An approved lock shall be installed on gates or similar barriers when required by the fire code official. Provide a Knox key switch or pad lock on the gates to the facility. Provide a Knox box 6' AFF over the FDC on the north building.
Planning Review Corrections 03/11/2024 03/11/2024
Hector Soto Jr.
Corrective Action Required
03/11/2024

LOT INFORMATION. Label the lot line dimensions and bearings for the project site.
Corrective Action Required
03/11/2024

SIDEWALK. The 5' sidewalk along SE Thompson Dr shall extend to the project site's eastern boundary.
Corrective Action Required
03/11/2024

WALL-MOUNTED LIGHT FIXTURES. Ensure that the proposed light fixture used is the model with full 90-degree cut-offs that direct light downward and do not allow the light source to been seen from off the property.
Corrective Action Required
03/11/2024

BUILDING ELEVATIONS. Provide color elevations of all four sides of both buildings.
Corrective Action Required
03/11/2024

TRASH ENCLOSURE. Provide a detail of the proposed trash enclosure. A note on the civil drawings states to see the architectural plans for a detail, but no such detail is included on the architectural drawings. Each trash enclosure shall be constructed of either: 1) masonry walls or steel architecturally designed walls with either a solid steel opaque gate painted to be compatible with the color of the masonry or steel walls and building it is to serve or a steel framed semi-opaque gate with a screen mesh material approved by the Director that provides an appropriate visual barrier; or 2) screening consisting of structural steel tube frame construction clad in the same metal siding as the building located on the same site. Additionally, each trash enclosure shall be protected through the installation of four-inch bollards along the rear wall of the trash enclosure.
Fees
Paid Fees Amount Paid Owing Date Paid
Final Development Plan fee $725.00 $725.00 Paid 02/27/2024
Outstanding Fees Amount Paid Owing Date Paid
No outstanding fees.


$0.00
Hearings
Title Location Date Time
Documents & Images
Date Uploaded File Type Document Name
02/26/2024 Application Form Final Development Plan Appliciation_1_2-26-24
02/26/2024 Application Form Final Development Plan Checklist_1_2-26-24
02/27/2024 Receipt Receipt for transaction:2024-001130
02/26/2024 Plans Full Plan Set_Rev 0_PL2023322
03/12/2024 Letter Applicant Letter - FDP (DFDP)
03/28/2024 Engineer Report/Study LS Flex Space BMP O&M Manual_2_3-28-2024
03/28/2024 Email LS Flex Space Drainage Report_2_3-28-2024
03/28/2024 Engineers Estimate LS Flex Space EOPCC_2_3-28-2024
03/28/2024 Letter LS Flex Space FDP Comment Response Letter_2_3-28-2024
03/28/2024 Plans LS Flex Space FDP Plan Set_2_3-28-2024
03/28/2024 Letter LS Flex Space MDNR Permit_2_3-28-2024
03/28/2024 Letter LS Flex Space SWPPP_2_3-28-2024
04/12/2024 Letter Applicant Letter - FDP (DFDP)
04/29/2024 Engineer Report/Study LS Flex Space Drainage Report_3_4-29-2024
04/29/2024 Letter LS Flex Space FDP Comment Response Letter_3_4-29-2024
04/29/2024 Engineer Report/Study LS Flex Space O&M Manual_3_4-29-2024
04/29/2024 Plans LS Flex Space Plan Set_3_4-29-2024
05/08/2024 Engineers Estimate 2024.05.07_Lee's Summit Flex Spaces_EOPCC
05/08/2024 Activity Document Fees PL2023322 LS Flex Space FDP
05/08/2024 Letter Applicant Letter - FDP (DFDP)
07/01/2024 Approved Plans Approved FDP Plan Set_LS Flex Space_PL2023332_05082024
08/15/2024 Plans LS Flex Space Landscape Plan_8_15_2024
08/21/2024 Letter Applicant Letter - FDP (DFDP)
10/02/2024 Engineer Report/Study 2024_10_02 Stormwater Addendum
10/10/2024 Letter Applicant Letter - FDP (DFDP)
10/31/2024 Plans 2024_10_30 LS Flex Space_Plan Set
11/07/2024 Letter Applicant Letter - FDP (DFDP)
11/21/2024 Plans 2024_11_21 LS Flex Space_Plan Set
11/21/2024 Approved Plans Approved Revised FDP Plan Set_PL2023322_11.21.2024_Admin
12/11/2024 Plans 2024_12_11 LS Flex Space_Plan Set
12/11/2024 Plans 2024_12_11 LS Flex Space_Plan Set_UPDATED
12/18/2024 Letter Applicant Letter - FDP (DFDP)
12/18/2024 Approved Plans Approved Revised FDP Plan Set_PL2023322_12.18.2024
Upload Documents

Guidelines For Electronically Submitting Documents:

  • Submitted documents should be under 100MB in size.
  • Accepted file extensions:
    • pdf, jpg, xls, doc, xlsx, docx, dwg
  • All plans shall be to scale.
  • Recommended naming conventions:
    • Keep filename consistent.
    • Avoid the use of non-friendly filenames. (ex. k9dk38fj3.pdf)
    • Avoid inappropriate language in filenames.
  • Submitted documents will be stamped at the conclusion of the review.
    • The stamp will be placed in the upper right hand corner of the document. It is recommeded that this area, to the extent possible, be left blank so that no information is lost when the the stamp is applied.
Remember to click the Upload Document button. If you are applying for a New license, make sure to click the "next step" button after you have completed the upload of documents

Select any documents you wish to provide:





Portal Home